607732 |
FRAMINGHAM- NATICK- COCHITUATE RAIL TRAIL CONSTRUCTION INCLUDING PEDESTRIAN BRIDGE, N-03-014, OVER ROUTE 9 & F-07-033=N-03-029 OVER ROUTE 30 |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
608228 |
FRAMINGHAM- RECONSTRUCTION OF UNION AVENUE, FROM PROCTOR STREET TO MAIN STREET |
Hwy Reconstr - Restr and Rehab |
CONSTRUCTION |
|
608889 |
FRAMINGHAM- TRAFFIC SIGNAL INSTALLATION AT EDGELL ROAD AT CENTRAL STREET |
Traffic Signals |
CONSTRUCTION |
|
612878 |
FRAMINGHAM- BRIDGE PRESERVATION, F-07-050, STATE ROUTE 9 OVER I-90
|
Bridge Preservation |
CONSTRUCTION |
|
612921 |
FRAMINGHAM- BRIDGE PRESERVATION, F-07-051, I-90 EXIT 111 (RAMP) OVER ROUTE 9 |
Bridge Preservation |
CONSTRUCTION |
|
110952 |
FRAMINGHAM- NATICK- ROADWAY RECONSTRUCTION INCLUDING SIGNALS, ROUTE 30 (COCHITUATE ROAD) @ SPEEN STREET |
Hwy Reconstr - Major Widening |
DESIGN |
|
600577 |
FRAMINGHAM- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON A SECTION OF ROUTE 135 (WAVERLY STREET) |
Hwy Reconstr - Minor Widening |
DESIGN |
|
603410 |
FRAMINGHAM- BRIDGE REHABILITATION, BR# F-07-028 ROUTE 126 (CONCORD STREET) OVER ROUTE 9 |
Bridge Reconstruction/Rehab |
DESIGN |
|
606109 |
FRAMINGHAM- INTERSECTION IMPROVEMENTS @ ROUTE 126/135/MBTA & CSX RAILROAD |
Hwy Reconstr - Added Capacity |
DESIGN |
|
607587 |
FRAMINGHAM- NATICK- STOCKBRIDGE- WAYLAND- WEST STOCKBRIDGE- SOLAR PHOTOVOLTAIC DEVELOPMENT LEASING AT VARIOUS SITES ALONG I-90 |
Electrical |
DESIGN |
|
608006 |
FRAMINGHAM- PEDESTRIAN HYBRID BEACON INSTALLATION AT ROUTE 9 AND MAYNARD ROAD |
Traffic Signals |
DESIGN |
|
609280 |
FRAMINGHAM- ROUNDABOUT CONSTRUCTION AT SALEM END ROAD, BADGER ROAD AND GATES STREET |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
612894 |
FRAMINGHAM- IMPROVEMENTS AT HARMONY GROVE ELEMENTARY SCHOOL (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2027 |
613319 |
SUDBURY- FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST |
Bikeway/Bike Path Construction |
DESIGN |
2029 |
613606 |
DISTRICT 1- DISTRICT 2- DISTRICT 3- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS |
Safety Improvements |
DESIGN |
|
613639 |
FRAMINGHAM- RESURFACING AND RELATED WORK ON ROUTE 9 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2028 |
613654 |
FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM EATON ROAD WEST TO FROST STREET |
Bikeway/Bike Path Construction |
DESIGN |
2029 |
613710 |
FRAMINGHAM- NATICK- ROADWAY IMPROVEMENTS ON BISHOP STREET, FROM HOWARD STREET TO HARTFORD STREET |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
|
613815 |
FRAMINGHAM- CULVERT REPLACEMENT ON ROUTE 126 (HOLLIS STREET) OVER WAUSHAKUM POND BROOK |
Culvert Replacement |
DESIGN |
|
86450 |
FRAMINGHAM- ROADWAY RECONSTRUCTION AND RELATED WORK ON SECTIONS OF ROUTE 126 (CONCORD STREET) AND ROUTE 30 (COCHITUATE ROAD) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601311 |
FRAMINGHAM- ROADWAY RECONSTRUCTION AND RELATED WORK ON SECTIONS OF WARREN ROAD AND DENNISON AVENUE |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
602046 |
FRAMINGHAM- RECONSTRUCTION & SIGNALIZATION OF FRANKLIN STREET, INCLUDES F-07-030 |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602522 |
FRAMINGHAM- BRIDGE REPLACEMENT, BR# F-07-006, ROUTE 9 OVER THE SUDBURY RIVER |
Bridge Replacement |
COMPLETE |
|
602839 |
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-009, CENTRAL STREET OVER SUDBURY RIVER, INCLUDES REHAB OF WICKFORD ROAD BRIDGE, F-07-064 |
Bridge Replacement |
COMPLETE |
|
602930 |
BROOKLINE- FRAMINGHAM- NATICK- NEWTON- SOUTHBOROUGH- WELLESLEY- WESTBOROUGH- TRAFFIC SIGNS ON ROUTE 9 |
Sign Installation/Upgrading |
COMPLETE |
|
602944 |
FRAMINGHAM- BRIDGE REHABILITATION, BR# F-07-005, MAIN STREET OVER SUDBURY RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603406 |
FRAMINGHAM- BRIDGE BETTERMENT, F-07-040, MAIN STREET OVER ROUTE 9 |
Structures Maintenance |
COMPLETE |
|
603694 |
FRAMINGHAM- BRIDGE RECONSTRUCTION, F-07-063, DANFORTH STREET OVER THE SUDBURY RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603710 |
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-015, WINTER STREET OVER MBTA, AMTRAK & CSX RAILROAD |
Bridge Replacement |
COMPLETE |
|
604013 |
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-016, FOUNTAIN STREET OVER MBTA & CSX |
Bridge Replacement |
COMPLETE |
|
604991 |
FRAMINGHAM- NATICK- RESURFACING & RELATED WORK ON ROUTE 9 |
Resurfacing |
COMPLETE |
|
605228 |
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-001, ROUTE 9 (WORCESTER ROAD) OVER RESERVOIR OUTLET |
Bridge Replacement |
COMPLETE |
|
606091 |
FRAMINGHAM- BRIDGE BETTERMENT, F-07-045, I-90 OVER MDC RESERVOIR |
Bridge Reconstruction/Rehab |
COMPLETE |
|
606137 |
FRAMINGHAM- BIKE PATH CONSTRUCTION & IMPROVEMENTS ON COCHITUATE RAIL TRAIL, FROM SCHOOL STREET TO ROUTE 30 |
Bikeway/Bike Path Construction |
COMPLETE |
|
606157 |
DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 6- TOLL PLAZA SIGNING & PAVEMENT MARKING REPLACEMENT ON THE MASS PIKE (I-90) & MHS (US 1, SR 1A) |
Structural Signing |
COMPLETE |
|
606209 |
FRAMINGHAM- RECONSTRUCTION OF ROUTE 126 (CONCORD STREET) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
606711 |
FRAMINGHAM- BRIDGE REPAIR, F-07-003 & F-07-065, WINTER STREET OVER SUDBURY RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
607910 |
FRAMINGHAM- DECK, JOINT & SUBSTRUCTURE REPAIRS ON F-07-018, MOUNT WAYTE AVENUE OVER MBTA/CSX |
Structures Maintenance |
COMPLETE |
|
608281 |
FRAMINGHAM- NATICK- ADAPTIVE SIGNAL CONTROL ON ROUTE 9 (WORCESTER ROAD) |
Traffic Signals |
COMPLETE |
|
608314 |
SOUTHBOROUGH- ASHLAND- FRAMINGHAM- RESURFACING AND RELATED WORK ON I-90, FROM MM 109.5 TO MM 114.9 |
Resurfacing |
COMPLETE |
|
608317 |
FRAMINGHAM- NATICK- WAYLAND- WESTON- RESURFACING AND RELATED WORK ON I-90, FROM MM 114.9 TO MM 121.1 |
Resurfacing Interstate |
COMPLETE |
|
608333 |
FRAMINGHAM- CLEANING AND PAINTING 2 BRIDGES OVER I-90 ON INTERCHANGE 12 AND GROVE STREET |
Painting - Structural |
COMPLETE |
|
608836 |
FRAMINGHAM- DRAINAGE IMPROVEMENTS ON ROUTE 9 AT ROUTE 126 INTERCHANGE AND SALT SHED DEMOLITION |
Drainage |
COMPLETE |
|
611951 |
FRAMINGHAM- CONSTRUCTION OF OFFICE, SALT SHEDS AND PARK AND RIDE RECONSTRUCTION ON ROUTE 9 |
Vertical Construction (Ch 149) |
COMPLETE |
|