City/Town Information
City:
District: 2
County: FRANKLIN
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
608414 GREENFIELD- INTERSECTION IMPROVEMENTS AT TWO LOCATIONS, ROUTE 2 AND COLRAIN ROAD & ROUTE 2 AND BIG Y ENTRANCE Traffic Signals CONSTRUCTION
609023 HATFIELD- WHATELY- DEERFIELD- GREENFIELD- BERNARDSTON- BRIDGE PRESERVATION ALONG I-91 Bridge Preservation CONSTRUCTION
600720 GREENFIELD- CONSTRUCTION OF A TOURIST INFORMATION CENTER AT ROUTE I-91 AND ROUTE 2 Vertical Construction (Ch 149) DESIGN
600752 GREENFIELD- BRIDGE REPLACEMENT, BR# G-12-018 GREEN RIVER ROAD OVER HINSDALE BROOK Bridge Replacement DESIGN
601794 GREENFIELD- RESURFACING AND RELATED WORK ON THE ROUTE 2 AND ROUTE I-91 CONNECTORS Resurfacing DESIGN
602561 GREENFIELD- STREETSCAPE ENHANCEMENT ON MAIN STREET (ROUTE 2A) Hwy Reconstr - Restr and Rehab DESIGN
603083 CHICOPEE- GREENFIELD- SLOPE REPAIRS AND STABILIZATION ON ROUTE 33 AND INTERSTATE 91 Miscellaneous/No Prequal DESIGN
603187 DEERFIELD- GREENFIELD- WHATELY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-91 Resurfacing DESIGN
603337 GREENFIELD- FRANKLIN COUNTY BIKEWAY (PHASE III) RIVERSIDE DRIVE TO NASH MILL ROAD Bikeway/Bike Path Construction DESIGN
604127 BERNARDSTON- GREENFIELD- MICROSURFACING PAVEMENT PRESERVATION AND RELATED REPAIRS, ROUTE I-91 Resurfacing DESIGN
605036 GILL- GREENFIELD- IMPROVEMENTS & UPGRADES ON ROUTE 2 FROM ADAMS RD/RTE 2A TO FRENCH KING BRIDGE - GILL/ERVING T.L. Hwy Reconstr - No Added Capacity DESIGN
609202 GREENFIELD- RESURFACING AND RELATED WORK ON MONTAGUE CITY ROAD Hwy Reconstr - No Added Capacity DESIGN 2025
610921 GREENFIELD- DOWNTOWN COMPLETE STREETS IMPROVEMENTS ON MAIN STREET (ROUTE 2A) Roadway - Reconstr - Sidewalks and Curbing DESIGN 2029
612508 GREENFIELD- BRIDGE PRESERVATION, G-12-059 & G-12-060, I-91 OVER ROUTE 2 ROTARY Bridge Preservation DESIGN
612509 GREENFIELD- BRIDGE REPLACEMENT, G-12-007, LOWER MAIN STREET (SR 2A) OVER GREEN RIVER Bridge Replacement DESIGN
612799 GREENFIELD- MONTAGUE- BRIDGE REPLACEMENT, G-12-002, TURNERS FALLS ROAD OVER CONNECTICUT RIVER, M-28-015, 5TH STREET OVER CANAL, M-28-16A, 6TH STREET OVER CANAL Bridge Replacement DESIGN 2027
613295 GREENFIELD- DECK REPLACEMENT, G-12-022 (144), LOG PLAIN ROAD WEST OVER G&W RAILROAD Bridge Preservation DESIGN
613591 GREENFIELD- BICYCLE AND PEDESTRIAN IMPROVEMENTS ON ROUTE 2A Bikeway/Bike Path Construction DESIGN
613606 DISTRICT 1- DISTRICT 2- DISTRICT 3- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS Safety Improvements DESIGN
45615 GREENFIELD- BRIDGE REPLACEMENT, BR# G-12-021 ALLEN STREET OVER THE B & M RAILROAD Bridge Replacement COMPLETE
600753 GREENFIELD- BRIDGE REPLACEMENT, BR# G-12-064 LOG PLAIN ROAD OVER MILL BROOK Bridge Replacement COMPLETE
601186 GREENFIELD- MONTAGUE- BRIDGE REHABILITATION, G-12-020=M-28-001, MONTAGUE CITY ROAD OVER CONNECTICUT RIVER (GENERAL PIERCE BRIDGE) Bridge Reconstruction/Rehab COMPLETE
601815 GREENFIELD- BRIDGE REHABILITATION, BR# G-12-058 ROUTE I-91 NORTHBOUND & SOUTHBOUND OVER THE B&M RAILROAD Bridge Reconstruction/Rehab COMPLETE
602702 GREENFIELD- BRIDGE CONSTRUCTION, FRANKLIN COUNTY BIKEWAY OVER THE GREEN RIVER Bikeway/Bike Path Construction COMPLETE
603265 ATHOL- ERVING- GILL- GREENFIELD- ORANGE- PHILLIPSTON- WENDELL- SAFETY IMPROVEMENTS ALONG ROUTE 2 Safety Improvements COMPLETE
603903 LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 CORRIDOR (DESIGN-BUILD) Intelligent Transportation Sys COMPLETE
604062 GREENFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT 8 INTERSECTIONS Traffic Signals COMPLETE
604183 ATHOL- ERVING- GILL- GREENFIELD- ORANGE- PHILLIPSTON- WENDELL- SAFETY IMPROVEMENTS, ROUTE 2 Safety Improvements COMPLETE
604436 GREENFIELD- INTERSTATE RESURFACING ON ROUTE I-91 Resurfacing COMPLETE
604643 GREENFIELD- ROTARY IMPROVEMENTS (ROUTES 2 AND 2A) AT I-91 Hwy Reconstr - Minor Widening COMPLETE
604859 GREENFIELD- LIGHTING UPGRADE & IMPROVEMENTS @ I-91/ROUTE 2/ROUTE 2A ROTARY Electrical COMPLETE
605541 EASTHAMPTON- GREENFIELD- NORTHAMPTON- SOUTHAMPTON- WESTFIELD- RESURFACING & RELATED WORK ON ROUTES 5 &10 Resurfacing COMPLETE
606006 GREENFIELD- RESURFACING & RELATED WORK ON ROUTE 2, FROM INTERSTATE 91 TO WEST OF THE GREENFIELD GILL T.L. (2.6 MILES) Resurfacing COMPLETE
606048 GREENFIELD- ROUNDABOUT CONSTRUCTION AT THE INTERSECTION OF COLRAIN ROAD, COLLEGE STREET & COLRAIN STREET Hwy Reconstr - Minor Widening COMPLETE
606442 GILL- GREENFIELD- BRIDGE REPLACEMENT, G-04-003=G-12-004, ROUTE 2 OVER THE FALL RIVER Bridge Replacement COMPLETE
606548 GREENFIELD- BRIDGE REPLACEMENT, G-12-052 (0XR) & G-12-053 (0XT), I-91 (NB & SB) OVER BMRR Bridge Replacement COMPLETE
607182 DEERFIELD- BERNARDSTON- GREENFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON ROUTE I-91 Resurfacing Interstate COMPLETE
607222 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET Hwy Reconstr - No Added Capacity COMPLETE
607223 GREENFIELD- INTERSECTION IMPROVEMENTS AND RELATED WORK (INCLUDING SIGNALS) AT ROUTE 2A (MOHAWK TRAIL) AND SHELBURNE ROAD/RIVER STREET Traffic Signals COMPLETE
608235 GREENFIELD- BRIDGE REPLACEMENT, G-12-006, NASH'S MILL ROAD OVER GREEN RIVER Bridge Replacement COMPLETE
608724 GREENFIELD- RECONSTRUCTION OF WISDOM WAY, FROM 480 FEET EAST OF PETTY PLAIN ROAD TO MILL STREET (0.43 MILES) Hwy Reconstr - No Added Capacity COMPLETE