City/Town Information
City:
District: 4
County: ESSEX
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
612197 AMESBURY- HAVERHILL- LOWELL- METHUEN- BRIDGE PRESERVATION BUNDLE ALONG I-495 Bridge Preservation CONSTRUCTION
613451 HAVERHILL- BRIDGE PAINTING AT H-12-041 (2YD) Painting - Structural CONSTRUCTION
602214 HAVERHILL- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-495 Resurfacing DESIGN
602727 DISTRICT 4- SCHEDULED AND EMERGENCY REPAIRS TO DRAWBRIDGES IN NORTH AREA (3 SEPARATE CONTRACTS) Drawbridge Maintenance DESIGN
604025 DISTRICT 4- GRASS MOWING AND TRIMMING OF STATE HIGHWAYS (AREA 4D-1) Mowing and Spraying DESIGN
604026 DISTRICT 4- GRASS MOWING AND TRIMMING OF STATE HIGHWAYS (AREA 4D-2) Mowing and Spraying DESIGN
605304 HAVERHILL- BRIDGE REPLACEMENT, H-12-007, BRIDGE STREET (SR 125) OVER THE MERRIMACK RIVER AND THE BRADFORD RAIL TRAIL Bridge Replacement DESIGN 2025
605306 HAVERHILL- BRIDGE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER MERRIMACK RIVER Bridge Replacement DESIGN
608721 HAVERHILL- CORRIDOR IMPROVEMENTS ON WATER STREET (ROUTE 97/113), FROM GINTY BOULEVARD/MILL STREET TO LINCOLN BOULEVARD/RIVERSIDE AVENUE Hwy Reconstr - No Added Capacity DESIGN
608788 HAVERHILL- ROADWAY RECONSTRUCTION ON NORTH AVENUE, FROM MAIN STREET (ROUTE 125) TO PLAISTOW NH Hwy Reconstr - No Added Capacity DESIGN 2027
609466 HAVERHILL- METHUEN- BRIDGE REPLACEMENT, H-12-040=M-17-030, I-495 (NB & SB) OVER MERRIMACK RIVER AND M-17-031, I-495 (NB & SB) OVER ROUTE 110 AND H-12-056, INDUSTRIAL AVENUE (EB & WB) OVER I-495 Bridge Replacement DESIGN 2025
612103 HAVERHILL- MERRIMAC- AMESBURY- SALISBURY- INTERSTATE RESURFACING AND RELATED WORK ON I-495 Resurfacing Interstate DESIGN
613092 HAVERHILL- 3 CULVERT REPLACEMENTS ON AMESBURY ROAD (ROUTE 110) OVER TRIBUTARY OF EAST MEADOW RIVER Culvert Replacement DESIGN 2027
613226 HAVERHILL- BRADFORD- GROVELAND RAIL TRAIL CONNECTION Bikeway/Bike Path Construction DESIGN
613313 HAVERHILL- BIKE LANE CONSTRUCTION AND RELATED WORK ON ROUTE 110 Pavement Marking DESIGN
613666 ARLINGTON- HAVERHILL- REVERE- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT MULTIPLE LOCATIONS Sidewalk Construction and Repairs DESIGN
613781 BURLINGTON- HAVERHILL- SCHEDULED BRIDGE MAINTENANCE REPAIRS ON B-29-006 (2G2 & 2G3) AND H-12-038 (2X0 & 2WY) Bridge Maintenance DESIGN
613881 DISTRICT 4- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (NORTHERN PROJECT) Sidewalk Construction and Repairs DESIGN
61301 HAVERHILL- WEST NEWBURY- BRIDGE REHABILITATION, H-12-020=W-20-004, MAIN STREET OVER THE MERRIMACK RIVER (ROCKS VILLAGE BRIDGE) Bridge Reconstruction/Rehab COMPLETE
600214 HAVERHILL- RECONSTRUCTION OF ROUTE 125 (SOUTH MAIN ST), FROM BOSTON ROAD TO BASILIERE BRIDGE & SALEM STREET, FROM SOUTH MAIN STREET TO PEABODY STREET Hwy Reconstr - Added Capacity COMPLETE
600216 HAVERHILL- RECONSTRUCTION OF SALEM STREET FROM GROVELAND T.L. TO PEABODY STREET (2.6 KM) Hwy Reconstr - Minor Widening COMPLETE
600757 HAVERHILL- BRIDGE REPLACEMENT, BR# H-12-006, UPPER BRIDGE STREET OVER THE MERRIMACK RIVER (JOSEPH C. COMEAU BRIDGE) Bridge Replacement COMPLETE
600988 GROVELAND- HAVERHILL- BRIDGE REPLACEMENT, G-15-001=H-12-012, ROUTE 97 & ROUTE 113 OVER THE MERRIMACK RIVER (BATES BRIDGE) Bridge Replacement COMPLETE
601355 HAVERHILL- BRIDGE REPLACEMENT, H-12-005, FERRY ROAD OVER THE B&M RAILROAD AND MBTA Bridge Replacement COMPLETE
602800 HAVERHILL- ROADWAY RECONSTRUCTION AT LAFAYETTE SQUARE Hwy Reconstr - Minor Widening COMPLETE
603751 HAVERHILL- DRAINAGE IMPROVEMENTS, ROUTE 125 AT FRANZONE DRIVE Hwy Reconstr - Restr and Rehab COMPLETE
603930 AMESBURY- GROVELAND- HAVERHILL- NEWBURY- NEWBURYPORT- SALISBURY- SCHEDULED AND EMERGENCY DRAWBRIDGE REPAIRS (NORTH AREA) Drawbridge Maintenance COMPLETE
604586 HAVERHILL- MERRIMAC- AMESBURY- SALISBURY- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 Resurfacing COMPLETE
604648 DISTRICT 4- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AND OPERATIONS (NORTH AREA - CONTRACT 2) Structures Maintenance COMPLETE
604849 HAVERHILL- RESURFACING ON ROUTE 110 (EB & WB), FROM METHUEN/HAVERHILL C.L. TO MAXWELL STREET Resurfacing COMPLETE
604910 HAVERHILL- RIVERWALK CONSTRUCTION, FROM MUNICIPAL PARKING LOT OFF WASHINGTON STREET NEAR MBTA STATION TO EXISTING RIVERFRONT PARK (300 FEET) Bikeway/Bike Path Construction COMPLETE
605598 HAVERHILL- INTERSTATE MAINTENANCE & RELATED WORK ON I-495 Resurfacing COMPLETE
605720 HAVERHILL- RIVERWALK CONSTRUCTION (BRADFORD SECTION), FROM ROUTE 125 TO COUNTY ROAD Bikeway/Bike Path Construction COMPLETE
605758 HAVERHILL- DOWNTOWN STREETSCAPE ON WASHINGTON STREET AND WINGATE STREET Hwy Reconstr - Restr and Rehab COMPLETE
606161 HAVERHILL- IMPROVEMENTS ON MAIN STREET (ROUTE 125) Hwy Reconstr - Minor Widening COMPLETE
607272 HAVERHILL- BRIDGE MAINTENANCE ON H-12-041, RIVER STREET OVER I-495 Structures Maintenance COMPLETE
607573 HAVERHILL- RECONSTRUCTION ON ROUTE 97 (BROADWAY), FROM SILVER BIRCH LANE TO RESEARCH DRIVE Hwy Reconstr - Minor Widening COMPLETE
607649 HAVERHILL- PEABODY- BRIDGE STEEL PAINTING AND REPAIRS OF SUBSTRUCTURE ELEMENTS, H-12-057 (2RR & 2RT) & P-03-037 (31T) Painting - Structural COMPLETE
608027 HAVERHILL- BRADFORD RAIL TRAIL EXTENSION, FROM ROUTE 125 TO RAILROAD STREET Bikeway/Bike Path Construction COMPLETE
608077 HAVERHILL- BUILDING ENVELOPE REPLACEMENT Vertical Construction (Ch 149) COMPLETE
608187 METHUEN- HAVERHILL- MERRIMAC- AMESBURY- TRAFFIC & GUIDE SIGN REPLACEMENT ON A SECTION OF I-495 Structural Signing COMPLETE
608668 AMESBURY- HAVERHILL- MERRIMAC- SALISBURY REFLECTIVITY UPGRADES ON I-495 Pavement Marking COMPLETE
608761 HAVERHILL- INTERSECTION RECONSTRUCTION ON ROUTE 108 (NEWTON ROAD) AT ROUTE 110 (KENOZA AVENUE AND AMESBURY ROAD) Hwy Reconstr - No Added Capacity COMPLETE