604123 |
ASHLAND- RECONSTRUCTION ON ROUTE 126 (POND STREET), FROM THE FRAMINGHAM T.L. TO THE HOLLISTON T.L. |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
26703 |
ASHLAND- BRIDGE REPLACEMENT, BR# A-14-011 FOUNTAIN STREET OVER CONRAIL |
Bridge Replacement |
DESIGN |
|
608436 |
ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
2028 |
612099 |
ASHLAND- BRIDGE REPLACEMENT, A-14-006, CORDAVILLE ROAD OVER SUDBURY RIVER |
Bridge Replacement |
DESIGN |
2027 |
603602 |
ASHLAND- BRIDGE REPLACEMENT, A-14-002, ROUTE 135 (UNION STREET) OVER THE SUDBURY RIVER |
Bridge Replacement |
COMPLETE |
|
608314 |
SOUTHBOROUGH- ASHLAND- FRAMINGHAM- RESURFACING AND RELATED WORK ON I-90, FROM MM 109.5 TO MM 114.9 |
Resurfacing |
COMPLETE |
|