119000 |
HUNTINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 66 INCLUDING BRIDGE REPLACEMENT BR# H-27-023 LYMAN ROAD OVER POND BROOK |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
602132 |
HUNTINGTON- BRIDGE REHABILITATION, BR# H-27-020 ROUTE 112 OVER THE WESTFIELD RIVER |
Bridge Reconstruction/Rehab |
DESIGN |
|
602424 |
GOSHEN- HUNTINGTON- LENOX- PITTSFIELD- WILLIAMSTOWN- CONSTRUCTION OF 5 CHEMICAL STORAGE SHEDS ON ROUTES 9, 112, 7A, 41 & 7 |
Chemical Storage Sheds |
DESIGN |
|
602425 |
DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS. |
Chemical Storage Sheds |
DESIGN |
|
610709 |
HUNTINGTON- SUPERSTRUCTURE REPLACEMENT, H-27-008, ROUTE 112 OVER POND BROOK |
Bridge Replacement |
DESIGN |
|
612176 |
HUNTINGTON- BRIDGE REPLACEMENT, H-27-008, ST 112 WORTHINGTON ROAD OVER WATER POND BROOK |
Bridge Replacement |
DESIGN |
2026 |
613185 |
HUNTINGTON- BRIDGE PRESERVATION, H-27-006 (0DH), STATE ROUTE 112/EAST MAIN STREET OVER CSXT AND WESTFIELD RIVER |
Bridge Preservation |
DESIGN |
2025 |
613206 |
CHARLEMONT- CHESHIRE- HUNTINGTON- BRIDGE PRESERVATION, C-05-024 (0KW), C-10-001 (0CU), C-10-010 (0CV), AND H-27-020 (0CN) |
Bridge Preservation |
DESIGN |
2028 |
602231 |
CHESTER- HUNTINGTON- RECONSTRUCTION, SKYLINE TRAIL SECT. III FROM THE MIDDLEFIELD TL TO COOK HILL RD / OLD CHESTER RD (7.7 MI ) |
Reclamation |
COMPLETE |
|
602314 |
CHESTER- HUNTINGTON- RESURFACING & RELATED WORK ON ROUTE 20 (FROM MM36 , CHESTER, TO MM42.6, HUNTINGTON) |
Resurfacing |
COMPLETE |
|
602994 |
HUNTINGTON- BRIDGE REPLACEMENT, BRIDGE RAMP, H-27-006, FREIGHT YARD ROAD (INTERSECTS MAIN BRIDGE STRUCTURE ON SOUTH SIDE OF SPAN 4) OVER THE MASSDOT MAINTENANCE FACILITY |
Bridge Replacement |
COMPLETE |
|
603166 |
HUNTINGTON- BRIDGE REHABILITATION, BR# H-27-006 ROUTE 112 OVER THE WESTFIELD RIVER AND CSX (TEMPORARY REPAIR) |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605082 |
HUNTINGTON- BRIDGE BETTERMENT, H-27-006, ROUTE 112 (WORTHINGON ROAD) OVER CSX RR AND WESTFIELD RIVER |
Structures Maintenance |
COMPLETE |
|
605460 |
HUNTINGTON- BRIDGE REPLACEMENT, H-27-006, (CSX DESIGN/BUILD - ABP-CSX2)
|
Bridge Replacement |
COMPLETE |
|
605615 |
HUNTINGTON- RESURFACING & RELATED WORK ON ROUTE 112, FROM MM 0.11 TO MM 8.52 |
Resurfacing |
COMPLETE |
|
608928 |
HUNTINGTON- SYSTEMATIC BRIDGE MAINTENANCE, H-27-019, ROUTE 112 OVER SYKES BROOK |
Bridge Maintenance |
COMPLETE |
|