113099 |
KINGSTON- PLYMOUTH- RECONSTRUCTION OF A SECTION OF ROUTE 3 AND RELOCATION OF ROUTE 44 INCLUDING 5 BRIDGES (SECTION II) |
New Construction |
DESIGN |
|
606002 |
KINGSTON- DUXBURY- INTERSECTION IMPROVEMENTS AT ROUTE 3 RAMPS (NB/SB) AND ROUTE 3A (TREMONT STREET) |
Traffic Signals |
DESIGN |
2027 |
608615 |
KINGSTON- BRIDGE REPLACEMENT, K-01-014, SMITHS LANE OVER ROUTE 3 (PILGRIM HIGHWAY) |
Bridge Replacement |
DESIGN |
2028 |
610714 |
BOURNE TO BRAINTREE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 3 |
Structural Signing |
DESIGN |
2025 |
24090 |
KINGSTON- BRIDGE REPLACEMENT, K-01-002, ELM STREET OVER THE JONES RIVER |
Bridge Replacement |
COMPLETE |
|
113100 |
CARVER- KINGSTON- PLYMPTON- RELOCATION OF A SECTION OF ROUTE 44 INCLUDING 6 BRIDGES (SECTION I) |
Highway Relocation |
COMPLETE |
|
600413 |
KINGSTON- RECONSTRUCTION OF ROUTE 27 (PEMBROKE STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
603334 |
KINGSTON- BRIDGE DECK REPLACEMENT, BR# K-01-013 ROUTE 3A OVER ROUTE 3 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603409 |
KINGSTON- TRAFFIC SAFETY IMPROVEMENTS ON ROUTE 3A AT EVERGREEN STREET AND POTTLE STREET |
Traffic Signals |
COMPLETE |
|
603833 |
BRAINTREE TO PLYMOUTH- TRAFFIC SIGNS IMPROVEMENT PROJECT ON ROUTE 3 |
Sign Installation/Upgrading |
COMPLETE |
|
605399 |
DUXBURY- KINGSTON- PEMBROKE- TREE TRIMMING & ROADSIDE CLEARING ON ROUTE 53 |
Contract Highway Maintenance |
COMPLETE |
|
607988 |
KINGSTON- DUXBURY- MARSHFIELD- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608455 |
PLYMOUTH- KINGSTON- CARVER- PLYMPTON- RESURFACING AND RELATED WORK ON ROUTE 44 (FROM MM 28.8 TO 36.4) |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
609376 |
KINGSTON- SYSTEMATIC BRIDGE PRESERVATION, K-01-011 (AGD), ROUTE 3 OVER JONES RIVER |
Bridge Maintenance |
COMPLETE |
|