City/Town Information
City:
District: 1
County: BERKSHIRE
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
603778 LANESBOROUGH- BRIDGE REPLACEMENT, L-03-024, NARRAGANSETT AVENUE OVER PONTOOSUC LAKE Bridge Replacement CONSTRUCTION
603636 CHESHIRE- LANESBOROUGH- CONSTRUCTION OF PASSING LANES ON ROUTE 8 Hwy Reconstr - Added Capacity DESIGN
606891 LANESBOROUGH- PITTSFIELD- ASHUWILLTICOOK RAIL TRAIL EXTENSION TO CRANE AVENUE Bikeway/Bike Path Construction DESIGN 2020
608351 ADAMS- CHESHIRE- LANESBOROUGH- RESURFACING ON THE ASHUWILLTICOOK RAIL TRAIL, FROM THE PITTSFIELD T.L. TO THE ADAMS VISITOR CENTER Resurfacing DOT Owned Non-Interstate DESIGN
608485 PITTSFIELD- LANESBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 8 (FROM MM 44.43 TO MM 47.77) Resurfacing DOT Owned Non-Interstate DESIGN 2021
608813 LANESBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 7 Resurfacing DOT Owned Non-Interstate DESIGN 2022
609256 LANESBOROUGH- RESURFACING AND SIDEWALK CONSTRUCTION ON ROUTE 7 Resurfacing DOT Owned Non-Interstate DESIGN
609394 CHESHIRE- ADAMS- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 8 Resurfacing DOT Owned Non-Interstate DESIGN
609428 LANESBOROUGH- BRIDGE REPLACEMENT, L-03-010, BRIDGE STREET OVER TOWN BROOK Bridge Replacement DESIGN
601558 LANESBOROUGH- RESURFACING AND RELATED WORK ON A SECTION OF BRODIE MOUNTAIN ROAD Resurfacing COMPLETE
601832 LANESBOROUGH- REST AREA IMPROVEMENTS & PAVEMENT ON ROUTE 7 (NB & SB) Vertical Construction (Ch 149) COMPLETE
602086 LANESBOROUGH- RECONSTRUCTION ON ROUTE US 7 & STATE ROUTE 8 CONNECTOR ROAD Hwy Reconstr - Restr and Rehab COMPLETE
602552 CHESHIRE- LANESBOROUGH- CONSTRUCTION OF ASHUWILLTICOOK RECREATION RAIL TRAIL FROM PITTS/LANES TL TO ROUTE 8 (CHEST) (SEGMENT 1) Bikeway/Bike Path Construction COMPLETE
603147 ADAMS- CHESHIRE- LANESBOROUGH- ASHUWILLTICOOK RAIL TRAIL (SEGMENT 2) FROM CHURCH ST CHESHIRE TO ROUTE 8 (PARK ST) ADAMS Bikeway/Bike Path Construction COMPLETE
603647 LANESBOROUGH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 7 Resurfacing COMPLETE
605028 NEW ASHFORD- LANESBOROUGH- RESURFACING & RELATED WORK ON ROUTE 7, FROM MM 41.68 TO MM 45.05 Resurfacing COMPLETE
605211 LANESBOROUGH- PITTSFIELD- RESURFACING & RELATED WORK ON ROUTE 8 Resurfacing COMPLETE
606029 LANESBOROUGH- BRIDGE REPLACEMENT, L-03-009, MINER ROAD OVER TOWN BROOK Bridge Replacement COMPLETE