Number Description Project Type Status TIP Year
608723 ATHOL- INTERSECTION IMPROVEMENTS AT CRESCENT STREET AND CHESTNUT HILL AVENUE Hwy Reconstr - No Added Capacity CONSTRUCTION
613167 ATHOL- PHILLIPSTON- TEMPLETON- BRIDGE PRESERVATION OF 8 BRIDGE CROSSINGS ALONG ROUTE 2 Bridge Preservation CONSTRUCTION
603423 ATHOL- CONSTRUCTION OF A CHEMICAL STORAGE BUILDING AND RELATED WORK AT THE MAINTENANCE DEPOT ON ROUTE 32 Chemical Storage Sheds DESIGN
608415 ATHOL- INTERSECTION IMPROVEMENTS AT ROUTE 2A AND BROOKSIDE ROAD Traffic Signals DESIGN 2027
611989 ATHOL- SIDEWALK INSTALLATION ALONG TEMPLETON ROAD (ROUTE 2A)(0.9 MILES) Sidewalk Construction and Repairs DESIGN 2029
612151 ATHOL- BRIDGE REPLACEMENT, A-15-013, ST 2A/MAIN STREET OVER G&W RAILROAD Bridge Replacement DESIGN 2026
613112 ATHOL- DECK REPLACEMENT, A-15-032 (19M), STATE ROUTE 2 OVER STATE ROUTE 32 (PETERSHAM ROAD) Bridge Preservation DESIGN
613141 ATHOL- ORANGE- BRIDGE REPLACEMENT, A-15-017=O-03-001, LOGAN ROAD OVER THE EAST BRANCH OF THE TULLY RIVER Bridge Replacement DESIGN 2028
601089 ATHOL- BRIDGE REPLACEMENT, A-15-006, ROUTE 2A (MAIN STREET) OVER THE MILLERS RIVER Bridge Replacement COMPLETE
602151 ATHOL- RECONSTRUCTION AND SAFETY IMPROVEMENTS, ROUTE 2A/ROUTE 32 (MAIN STREET) Hwy Reconstr - No Added Capacity COMPLETE
602943 ATHOL- PHILLIPSTON- SAFETY IMPROVEMENTS ALONG ROUTE 2 INCLUDING INSTALLATION OF MEDIAN BARRIER Safety Improvements COMPLETE
603265 ATHOL- ERVING- GILL- GREENFIELD- ORANGE- PHILLIPSTON- WENDELL- SAFETY IMPROVEMENTS ALONG ROUTE 2 Safety Improvements COMPLETE
603582 ATHOL- ORANGE- BRIDGE REPLACEMENT, A-15-030=O-03-020, ROUTE 2 OVER LAKE ROHUNTA Bridge Replacement COMPLETE
604183 ATHOL- ERVING- GILL- GREENFIELD- ORANGE- PHILLIPSTON- WENDELL- SAFETY IMPROVEMENTS, ROUTE 2 Safety Improvements COMPLETE
604912 ATHOL- BRIDGE PRESERVATION, A-15-033, A-15-034, ROUTE 2 OVER SOUTH ATHOL & WHITE POND ROAD Structures Maintenance COMPLETE
605119 WENDELL- ATHOL- ORANGE- PHILLIPSTON- TEMPLETON- TRAFFIC SIGN REPLACEMENT & RELATED WORK ON ROUTE 2 Sign Installation/Upgrading COMPLETE
606008 ATHOL- PETERSHAM- RESURFACING & RELATED WORK ON ROUTE 32, FROM 1 MILE NORTH OF ROUTE 101 TO ROUTE 2/ROUTE 32 BRIDGE Resurfacing COMPLETE
606221 ATHOL- RESURFACING & RELATED WORK ON ROUTE 32, FROM ROUTE 2 TO ROUTE 2A Resurfacing COMPLETE
606408 ATHOL- RECONSTRUCTION OF WEST ROYALSTON ROAD, FROM SILVER LAKE STREET TO THE ROYALSTON T.L. (APPROX. 2 MILES) Reclamation COMPLETE
606636 ATHOL- SCENIC BYWAY ACCESS & OVERLOOK CONSTRUCTION Landscaping COMPLETE
607221 ATHOL- CHICOPEE- EASTHAMPTON- NORTHAMPTON- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS Resurfacing COMPLETE
607296 ATHOL- PHILLIPSTON- MEDIAN DELINEATOR REPLACEMENT ON ROUTE 2, FROM SOUTH ATHOL ROAD TO 1,330 FT. WEST OF STATE ROAD (6 MILES) Miscellaneous/No Prequal COMPLETE
607641 ATHOL- PHILLIPSTON- RESURFACING & RELATED WORK ON ROUTE 2A, FROM ROUTE 32 TO ROUTES 2/202 (MM 36.7 - MM 40.7: 4 MILES) Resurfacing COMPLETE
608260 ATHOL- BRIDGE REPLACEMENT, A-15-005, WASHINGTON AVE OVER ATHOL POND OUTLET & A-15-004, MORGAN AVE OVER ATHOL POND OUTLET Bridge Replacement COMPLETE
608612 ATHOL- BRIDGE REPLACEMENT, A-15-008, CRESCENT STREET OVER MILLERS RIVER Bridge Replacement COMPLETE
609397 ATHOL- PHILLIPSTON- RESURFACING AND RELATED WORK ON ROUTE 2 Resurfacing DOT Owned Non-Interstate COMPLETE