612293 |
LENOX- UPGRADE TO HEATING SYSTEM CONTROLS AT LENOX ADMINISTRATION BUILDING AT 270 MAIN STREET |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
47000 |
LENOX- BRIDGE REPLACEMENT, BR# L-07-005 MILL STREET OVER THE HOUSATONIC RAILROAD |
Bridge Replacement |
DESIGN |
|
601070 |
GREAT BARRINGTON- LENOX- TRAFFIC SAFETY IMPROVEMENTS, RTE 7/20 BYPASS @ HUBBARD STREET & RTE 7 @ MONUMENT MOUNTAIN REGIONAL H.S |
Safety Improvements |
DESIGN |
|
601833 |
DISTRICT 1- 3/4" RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS (STATE HIGHWAYS) |
Resurfacing |
DESIGN |
|
601873 |
DISTRICT 1- REPLACEMENT OF BOILER AT LENOX ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
DESIGN |
|
602424 |
GOSHEN- HUNTINGTON- LENOX- PITTSFIELD- WILLIAMSTOWN- CONSTRUCTION OF 5 CHEMICAL STORAGE SHEDS ON ROUTES 9, 112, 7A, 41 & 7 |
Chemical Storage Sheds |
DESIGN |
|
602425 |
DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS. |
Chemical Storage Sheds |
DESIGN |
|
603030 |
LENOX- CONSTRUCTION OF CEMENT CONCRETE SIDEWALKS ALONG KEMBLE STREET (ROUTE 7A) |
New Construction |
DESIGN |
|
608292 |
LENOX- CONSTRUCTION OF PRE-ENGINEERED STORAGE FACILITY AT DISTRICT ONE ADMINISTRATION COMPLEX |
Vertical Construction (Ch 149) |
DESIGN |
|
613053 |
LENOX- INTERSECTION IMPROVEMENTS ON ROUTE 20 AT PLUNKETT STREET AND BLANTYRE ROAD |
Traffic Signals |
DESIGN |
2027 |
601432 |
LENOX- CONSTRUCTION OF PRE-ENGINEERED STEEL STORAGE FACILITY AT THE MHD ADMINISTRATION COMPLEX (P.V. CHANGE) |
Vertical Construction (Ch 149) |
COMPLETE |
|
601886 |
LENOX- RECONSTRUCTION OF ROUTE 7A (KEMBLE STREET) FROM ROUTE 7 TO ROUTE 183 |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
602937 |
LENOX- RECONSTRUCTION ON ROUTE 183 (WEST STREET) ROUTE 7A & 183 STOCKBRIDGE/LENOX T.L. INCLUDES CULVERT REPAIR OF L-07-008 |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
603655 |
LENOX- INTERSECTION IMPROVEMENTS, ROUTE 7 @ ROUTE 20 |
Traffic Signals |
COMPLETE |
|
604172 |
DISTRICT 1- INSTALLATION OF CENTRAL AIR CONDITIONING AND THERMO WINDOWS IN LENOX OFFICE |
Vertical Construction (Ch 149) |
COMPLETE |
|
604501 |
LENOX- PITTSFIELD- RESURFACING AND RELATED WORK, ROUTE 7 AND 20 AND ROUTE 8 AND 9 (COLTSVILLE INTERSECTION) |
Resurfacing |
COMPLETE |
|
606261 |
LENOX- DRAINAGE REPAIRS ADJACENT TO ROUTE 7/20 |
Contract Highway Maintenance |
COMPLETE |
|
606462 |
LENOX- RECONSTRUCTION & MINOR WIDENING ON WALKER STREET |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
606544 |
LENOX- PITTSFIELD- RESURFACING AND RELATED WORK ON ROUTE 7/20 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
607551 |
LEE- LENOX- BRIDGE REPLACEMENT, L-05-020=L-07-003, VALLEY STREET OVER HOUSATONIC RIVER |
Bridge Replacement |
COMPLETE |
|
607745 |
LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERAN'S MEMORIAL HIGHWAY) @ SR 183 (WALKER STREET) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
608465 |
LENOX- LEE- STOCKBRIDGE- RESURFACING AND RELATED WORK ON ROUTE 7 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608636 |
LENOX- SUPERSTRUCTURE REPLACEMENT, L-07-006, ROARING BROOK ROAD OVER ROARING BROOK |
Bridge Reconstruction/Rehab |
COMPLETE |
|
608679 |
LENOX- INTERSECTION SAFETY IMPROVEMENTS AT ROUTE 7/20 AND HOUSATONIC STREET (PHASE I) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|