City/Town Information
City:
District: 4
County: MIDDLESEX
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
603722 LEXINGTON- BRIDGE REPLACEMENT, L-10-010, ROUTE 2A (MARRETT ROAD) OVER I-95/ROUTE 128 Bridge Replacement CONSTRUCTION
611937 LEXINGTON- CONSTRUCTION OF A PRE-ENGINEERED EQUIPMENT REPAIR GARAGE AT THE LEXINGTON DEPOT Vertical Construction (Ch 149) CONSTRUCTION
43550 LEXINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF MARRETT ROAD (ROUTE 2A) Hwy Reconstr - No Added Capacity DESIGN
601936 LEXINGTON- MILTON- REVERE- INSTALLATION OF 8 - 10,000 GALLON ABOVE GROUND CaCl2 STORAGE TANKS AT 4 LOCATIONS Miscellaneous/No Prequal DESIGN
602083 DISTRICT 4- RAMP RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (128) FROM LYNNFIELD TO WELLESLEY Resurfacing DESIGN
602308 LEXINGTON- LINCOLN- REPLACEMENT OF CONCRETE MEDIAN BARRIER ON A SECTION OF ROUTE 2 (CAMBRIDGE TURNPIKE) Safety Improvements DESIGN
602353 LEXINGTON- RECONSTRUCTION OF EMERY PARK IN DEPOT SQUARE Miscellaneous/No Prequal DESIGN
602915 DISTRICT 4- RESURFACING AND RELATED WORK IN AREA "B" Resurfacing DESIGN
608495 CONCORD- LEXINGTON- LINCOLN- RESURFACING AND RELATED WORK ON ROUTE 2A Resurfacing DOT Owned Non-Interstate DESIGN
612309 LEXINGTON- INSTALLATION OF SITE TRAILER AND UTILITY CONNECTIONS AT MAINTENANCE DEPOT AT WATERTOWN STREET Vertical Construction (Ch 149) DESIGN
613144 LEXINGTON- SAFETY IMPROVEMENTS AT ROUTE I-95 AND ROUTE 4/225 INTERCHANGE (DESIGN ONLY) Traffic Signals DESIGN
613178 LEXINGTON- DECK REPLACEMENT, L-10-019 (2DW, 2DX), STATE ROUTE 2/CONCORD TURNPIKE OVER PLEASANT STREET Bridge Preservation DESIGN
613466 ARLINGTON- LEXINGTON- SCHEDULED SUBSTRUCTURE REPAIRS L-10-017, L-10-020, A-10-020, A-10-012 Bridge Maintenance DESIGN
600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 128 (DESIGN-BUILD) Bridge Replacement COMPLETE
602041 BURLINGTON- LEXINGTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (ROUTE 128) Resurfacing COMPLETE
602133 LEXINGTON- SIGNAL UPGRADE AT ROUTE 2A AND WALTHAM STREET Traffic Signals COMPLETE
604628 LEXINGTON- RESURFACING & RELATED WORK ON ROUTE 2 Resurfacing COMPLETE
604755 LEXINGTON- BRIDGE PRESERVATION, L-10-017, SPRING STREET OVER ROUTE 2 Structures Maintenance COMPLETE
604896 ARLINGTON- BELMONT- CAMBRIDGE- LEXINGTON- LINCOLN- SIGN REPLACEMENT & IMPROVEMENTS ON STATE ROUTE 2 Sign Installation/Upgrading COMPLETE
604937 LEXINGTON- NEWTON- WALTHAM- WELLESLEY- WESTON- TRAFFIC SIGN REPLACEMENT ON I-95, FROM WELLESLEY (ROUTE 9) TO LEXINGTON (ROUTES 4/225) APPROX. 13 MILES Structural Signing COMPLETE
605018 BURLINGTON- LEXINGTON- READING- WOBURN- TRAFFIC SIGN & GUIDE REPLACEMENT ON I-95 (SR 128) Sign Installation/Upgrading COMPLETE
605870 LEXINGTON- SAFE ROUTES TO SCHOOL (BOWMAN SCHOOL) Hwy Reconstr - No Added Capacity COMPLETE
606031 LEXINGTON- CABLE BARRIER INSTALLATION ALONG ROUTE 2 Guard Rail & Fencing COMPLETE
606170 LEXINGTON- BURLINGTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 Resurfacing COMPLETE
606432 LEXINGTON- BURLINGTON- WOBURN- STONEHAM- READING- WAKEFIELD- LYNNFIELD- EXPANSION OF FIBER & CCTV ON I-95 Intelligent Transportation Sys COMPLETE
607409 LEXINGTON- RECONSTRUCTION ON MASSACHUSETTS AVENUE, FROM MARRETT ROAD TO PLEASANT STREET Hwy Reconstr - Restr and Rehab COMPLETE
608379 LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2 Resurfacing DOT Owned Non-Interstate COMPLETE