City/Town Information
City:
District: 2
County: HAMPDEN
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
607688 MONSON- PALMER- BRIDGE REPLACEMENT, M-27-022=P-01-033, PARK ST/BOSTON ROAD EAST (US 20) OVER THE QUABOAG RIVER Bridge Replacement CONSTRUCTION
30512 MONSON- BRIDGE REPLACEMENT, BR# M-27-012 HOVEY ROAD OVER CONRAIL Bridge Replacement DESIGN
601171 MONSON- ROADWAY RECONSTRUCTION ON A SECTION OF THOMPSON STREET Hwy Reconstr - Restr and Rehab DESIGN
601728 MONSON- ROADWAY RECONSTRUCTION ON WALES ROAD FROM MOULTON HILL ROAD TO THE WALES T.L. Hwy Reconstr - Major Widening DESIGN
604136 MONSON- PALMER- BRIDGE REPLACEMENT, M-27-007=P-01-007, STATE AVENUE OVER THE QUABOAG RIVER Bridge Replacement DESIGN 2025
608846 MONSON- BRIDGE REPLACEMENT, M-27-015, OLD WALES ROAD OVER CONANT BROOK Bridge Replacement DESIGN 2024
612160 MONSON- PALMER- BRIDGE REPLACEMENT, M-27-008=P-01-008, ROUTE 32 OVER QUABOAG RIVER Bridge Replacement DESIGN 2025
612984 MONSON- RESURFACING AND RELATED WORK ON MAIN STREET (ROUTE 32) Roadway - Reconstr - Sidewalks and Curbing DESIGN 2028
613139 MONSON- SUPERSTUCTURE REPLACEMENT OF BRIDGE M-27-026, STAFFORD HOLLOW ROAD OVER NECRR Bridge Reconstruction/Rehab DESIGN 2028
613296 MONSON- BRIDGE REPLACEMENT, M-27-030 (68H), BUNYAN ROAD OVER CHICOPEE BROOK Bridge Replacement DESIGN
600968 DISTRICT 2- DRAINAGE BETTERMENTS AT VARIOUS LOCATIONS Miscellaneous/No Prequal COMPLETE
601502 MONSON- RECONSTRUCTION OF LOWER HAMPDEN ROAD, FROM HAMPDEN T.L. TO ELM STREET (4.13 MILES) INCLUDES M-27-034 Hwy Reconstr - Minor Widening COMPLETE
602076 MONSON- RECONSTRUCTION OF HOSPITAL ROAD FROM MACOMBER ROAD TO PALMER ROAD (ROUTE 32) , 1.2 KILOMETERS Hwy Reconstr - No Added Capacity COMPLETE
603960 MONSON- BRIDGE REHABILITATION, M-27-010, HOSPITAL ROAD OVER CHICOPEE BROOK Bridge Reconstruction/Rehab COMPLETE
606663 MONSON- PALMER- RESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES) Resurfacing COMPLETE