City/Town Information
City:
District: 3
County: MIDDLESEX
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
605034 NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. Hwy Reconstr - Restr and Rehab CONSTRUCTION
607732 FRAMINGHAM- NATICK- COCHITUATE RAIL TRAIL CONSTRUCTION INCLUDING PEDESTRIAN BRIDGE, N-03-014, OVER ROUTE 9 & F-07-033=N-03-029 OVER ROUTE 30 Bikeway/Bike Path Construction CONSTRUCTION
110952 FRAMINGHAM- NATICK- ROADWAY RECONSTRUCTION INCLUDING SIGNALS, ROUTE 30 (COCHITUATE ROAD) @ SPEEN STREET Hwy Reconstr - Major Widening DESIGN
605091 NATICK- BRIDGE PRESERVATION, N-03-032, N-03-033, N-03-034, N-03-035, RAMP A & B OVER ROUTE 9 & SPEEN STREET OVER RAMPS G & D Structures Maintenance DESIGN 2028
605313 NATICK- BRIDGE REPLACEMENT, N-03-020, ROUTE 27 (NORTH MAIN STREET) OVER ROUTE 9 (WORCESTER STREET) AND INTERCHANGE IMPROVEMENTS Bridge Replacement DESIGN
607420 NATICK- SUPERSTRUCTURE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA Bridge Reconstruction/Rehab DESIGN 2027
607587 FRAMINGHAM- NATICK- STOCKBRIDGE- WAYLAND- WEST STOCKBRIDGE- SOLAR PHOTOVOLTAIC DEVELOPMENT LEASING AT VARIOUS SITES ALONG I-90 Electrical DESIGN
610680 NATICK- LAKE COCHITUATE PATH Bikeway/Bike Path Construction DESIGN 2026
610691 NATICK- COCHITUATE RAIL TRAIL EXTENSION, FROM MBTA STATION TO MECHANIC STREET Bikeway/Bike Path Construction DESIGN 2028
610869 NATICK- PEDESTRIAN/BIKE BRIDGE SUPERSTRUCTURE REPLACEMENT, N-03-007, SPRING STREET OVER THE MBTA Bridge Replacement DESIGN
612178 NATICK- BRIDGE REPLACEMENT, N-03-010, SPEEN STREET OVER RR MBTA/CSX Bridge Replacement DESIGN 2026
613640 NATICK- RESURFACING AND RELATED WORK ON ROUTE 9 Resurfacing DOT Owned Non-Interstate DESIGN 2029
613710 FRAMINGHAM- NATICK- ROADWAY IMPROVEMENTS ON BISHOP STREET, FROM HOWARD STREET TO HARTFORD STREET Roadway - Reconstr - Sidewalks and Curbing DESIGN
600573 NATICK- ROADWAY RECONSTRUCTION AND RELATED WORK ON ROUTE 135 (EAST & WEST CENTRAL STREET) & ROUTE 27 (NORTH & SOUTH MAIN STREET) Hwy Reconstr - No Added Capacity COMPLETE
601586 NATICK- WELLESLEY- INTERSECTION IMPROVEMENTS @ ROUTE 9 (WORCESTER STREET) & OAK STREET, FROM 1500' WEST OF OAK STREET TO 300' EAST OF OVERBROOK DRIVE Resurfacing COMPLETE
602930 BROOKLINE- FRAMINGHAM- NATICK- NEWTON- SOUTHBOROUGH- WELLESLEY- WESTBOROUGH- TRAFFIC SIGNS ON ROUTE 9 Sign Installation/Upgrading COMPLETE
603004 NATICK- BRIDGE REPLACEMENT, BR# N-03-021, ROUTE 9 OVER LAKE COCHITUATE Bridge Replacement COMPLETE
603753 DISTRICT 3- CLEAN AND PAINT FOUR STEEL BRIDGES: H-09-013, H-09-012, M-11-003, N-03-010 Painting - Structural COMPLETE
604991 FRAMINGHAM- NATICK- RESURFACING & RELATED WORK ON ROUTE 9 Resurfacing COMPLETE
606157 DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 6- TOLL PLAZA SIGNING & PAVEMENT MARKING REPLACEMENT ON THE MASS PIKE (I-90) & MHS (US 1, SR 1A) Structural Signing COMPLETE
607312 NATICK- BRIDGE REPLACEMENT, N-03-003, MARION STREET OVER THE MBTA RAILROAD Bridge Replacement COMPLETE
607993 AYER- NATICK- LANCASTER- LEOMINSTER- WORCESTER- STORMWATER IMPROVEMENTS ALONG ROUTE 2, ROUTE 9, ROUTE 12, ROUTE 2A, ROUTE 110, ROUTE 111 AND I-290 Drainage COMPLETE
608281 FRAMINGHAM- NATICK- ADAPTIVE SIGNAL CONTROL ON ROUTE 9 (WORCESTER ROAD) Traffic Signals COMPLETE
608317 FRAMINGHAM- NATICK- WAYLAND- WESTON- RESURFACING AND RELATED WORK ON I-90, FROM MM 114.9 TO MM 121.1 Resurfacing Interstate COMPLETE