606552 |
NORTHAMPTON– BRIDGE REPLACEMENT, N-19-059, I-91 OVER US ROUTE 5 AND B&MRR, BRIDGE REPLACEMENT, N-19-060, I-91 OVER HOCKANUM ROAD AND IMPROVEMENTS TO I-91/INTERCHANGE 18 |
Bridge Replacement |
CONSTRUCTION |
|
606555 |
NORTHAMPTON- ROUNDABOUT CONSTRUCTION AT INTERSECTION ROUTES 5/10 (NORTH KING STREET) & HATFIELD STREET |
Hwy Reconstr - No Added Capacity |
CONSTRUCTION |
|
119005 |
NORTHAMPTON- ROADWAY RECONSTRUCTION INCLUDING 2 BRIDGE REHABILITATIONS AND SIGNALS ON A SECTION OF ROUTE 66 (PHASE 1) |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
119006 |
NORTHAMPTON- ROADWAY RECONSTRUCTION AND RELATED WORK ON A SECTION OF ROUTE 66 (PHASE 2) |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
119007 |
NORTHAMPTON- RECONSTRUCTION OF ROUTE 66, FROM WILSON ROAD TO LOUDVILLE ROAD (4 MILES) INCLUDES N-19-038 (PHASE III) |
Hwy Reconstr - No Added Capacity |
DESIGN |
|
124913 |
HADLEY- NORTHAMPTON- BRIDGE REHABILITATION, BR# H-01-012=N-19-018 ROUTE 9 OVER THE CONNECTICUT RIVER (CALVIN COOLIDGE BRIDGE) |
Bridge Reconstruction/Rehab |
DESIGN |
|
601200 |
NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-068 OLD SPRINGFIELD ROAD OVER THE MILL RIVER |
Bridge Replacement |
DESIGN |
|
602043 |
NORTHAMPTON- CONSTRUCTION OF PARK AND RIDE FACILITY AT SHELDON FIELD OFF OLD FERRY ROAD AND BRIDGE STREET (ROUTE 9) |
New Construction |
DESIGN |
|
602058 |
NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-033 CHESTERFIELD ROAD OVER ROBERTS MEADOW BROOK |
Bridge Replacement |
DESIGN |
|
602069 |
HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 5/10 |
Resurfacing |
DESIGN |
|
602538 |
NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-023, BLISS STREET OVER THE MILL RIVER |
Bridge Replacement |
DESIGN |
|
603032 |
HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-91 NB & SB |
Resurfacing |
DESIGN |
|
603407 |
DISTRICT 2- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS |
Resurfacing |
DESIGN |
|
606200 |
HADLEY - BRIDGE REHABILITATION (H-01-026) OF NORWOTTUCK RAIL TRAIL OVER CONNECTICUT RIVER (DCR CONTRACTS P-10-2731-D1A & P12-2769-D1A)
|
Bridge Reconstruction/Rehab |
DESIGN |
|
608413 |
NORTHAMPTON- ROCKY HILL GREENWAY MULTI-USE TRAIL, FROM THE MANHAN RAIL TRAIL TO ROCKY HILL ROAD (0.4 MILES) |
Bikeway/Bike Path Construction |
DESIGN |
2025 |
608869 |
NORTHAMPTON- BRIDGE REPLACEMENT, N-19-068, OLD SPRINGFIELD ROAD OVER THE MILL RIVER |
Bridge Replacement |
DESIGN |
2025 |
609210 |
HADLEY- NORTHAMPTON- SOUTH HADLEY- CONNECTICUT RIVER TRAIL CONSTRUCTION |
Bikeway/Bike Path Construction |
DESIGN |
|
609286 |
NORTHAMPTON- DOWNTOWN COMPLETE STREETS CORRIDOR AND INTERSECTION IMPROVEMENTS ON MAIN STREET (ROUTE 9) |
Hwy Reconstr - No Added Capacity |
DESIGN |
2025 |
610657 |
EASTHAMPTON- NORTHAMPTON- INSTALLATION OF A SHARED-USE PATH ALONG MOUNT TOM ROAD FROM THE MANHAN TRAIL TO ATWOOD DRIVE |
Bikeway/Bike Path Construction |
DESIGN |
2026 |
612504 |
NORTHAMPTON- BRIDGE REPLACEMENT, N-19-045, MAIN STREET LEEDS OVER MILL RIVER & N-19-046, MAIN STREET LEEDS OVER NORTH & SOUTH CHANNELS OF THE MILL RIVER |
Bridge Replacement |
DESIGN |
|
612511 |
EASTHAMPTON- NORTHAMPTON- DECK REPLACMENT, E-05-025, E-05-026, I-91 OVER MANHAN RAIL TRAIL & N-19-056, I-91 OVER ISLAND ROAD |
Bridge Preservation |
DESIGN |
|
612582 |
WELDED RAIL INSTALLATION AND MAINTENANCE ON THE CONNECTICUT RIVER MAINLINE (CONTINUOUS) |
Rail and Transit |
DESIGN |
|
613219 |
CHICOPEE- HOLYOKE- NORTHAMPTON- SPRINGFIELD- WEST SPRINGFIELD- BRIDGE PRESERVATION OF 26 BRIDGES ALONG I-91 |
Bridge Preservation |
DESIGN |
2025 |
613316 |
EASTHAMPTON- NORTHAMPTON- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-91 |
Resurfacing Interstate |
DESIGN |
|
613404 |
NORTHAMPTON- HVAC REPAIRS TO DISTRICT ADMINSTRATION BUILDING AT 811 NORTH KING STREET |
Vertical Construction (Ch 149) |
DESIGN |
|
613658 |
HATFIELD- NORTHAMPTON- BICYCLE AND PEDESTRIAN IMPROVEMENTS ON ROUTE 5/10, INCLUDES BRIDGE REPLACEMENT, H-11-007, WEST STREET (ROUTE 5/10) OVER GUTTER BROOK |
Roadway - Reconstr - Sidewalks and Curbing |
DESIGN |
|
124911 |
HADLEY- NORTHAMPTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM, BR# H-01-012=N-19-018 ROUTE 9 OVER CONNECTICUT RIVER |
Traffic Signals |
COMPLETE |
|
180085 |
NORTHAMPTON- REPAIRS TO HEATING SYSTEM AT DISTRICT 2 MAINTENANCE FACILITY |
Vertical Construction (Ch 149) |
COMPLETE |
|
600302 |
HADLEY- NORTHAMPTON- RECONSTRUCTION OF ROUTE 9 (RUSSELL STREET) |
Hwy Reconstr - Minor Widening |
COMPLETE |
|
601180 |
NORTHAMPTON- CONSTRUCTION OF A BIKE PATH ALONG ABANDONED RR BED (EXTENSION OF NORWOTTUCK TRAIL) |
Bikeway/Bike Path Construction |
COMPLETE |
|
602647 |
NORTHAMPTON- TRAFFIC SIGNALS, INTERSECTION OF NORTH MAPLE STREET AND BRIDGE ROAD. FA# STP-001S(286)X |
Traffic Signals |
COMPLETE |
|
602885 |
NORTHAMPTON- NORWOTTUCK RAIL-TRAIL EXTENSION, FROM LOOK PARK TO LEEDS, INCLUDES N-19-073 (LOOK PARK) & N-19-044 (ARCH STREET) |
Bikeway/Bike Path Construction |
COMPLETE |
|
602887 |
NORTHAMPTON- BIKE PATH CONSTRUCTION ON STATE STREET (DOWNTOWN LINK NORWOTTUCK RAIL TRAIL) INCLUDES N-19-005 & N-19-006 |
Bikeway/Bike Path Construction |
COMPLETE |
|
603054 |
NORTHAMPTON- ROUNDABOUT CONSTRUCTION AT NORTH MAIN STREET, BRIDGE ROAD AND LOOK MEMORIAL PARK ENTRANCE |
Traffic Signals |
COMPLETE |
|
603729 |
NORTHAMPTON- BRIDGE REPLACEMENT, N-19-029, RIVER ROAD OVER THE MILL RIVER |
Bridge Replacement |
COMPLETE |
|
603903 |
LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 CORRIDOR (DESIGN-BUILD) |
Intelligent Transportation Sys |
COMPLETE |
|
604207 |
EASTHAMPTON- NORTHAMPTON- MANHAN BIKE TRAIL CONSTRUCTION, FROM EASTHAMPTON LINK TO EARLE STREET, INCLUDES E-5-027 = N-19-075 & N-19-001 |
Bikeway/Bike Path Construction |
COMPLETE |
|
604219 |
NORTHAMPTON- MANHAN/NORWOTTUCK TRAIL CONSTRUCTION, INCLUDING EARLE STREET/GROVE STREET INTERSECTION TO NEW SOUTH STREET, INCLUDES BR# N-19-072 |
Bikeway/Bike Path Construction |
COMPLETE |
|
604242 |
NORTHAMPTON- BRIDGE REPLACEMENT, N-19-035, KENNEDY ROAD OVER ROBERTS MEADOW BROOK |
Bridge Replacement |
COMPLETE |
|
604281 |
HOLYOKE- NORTHAMPTON- BRIDGE DECK REPAIRS, I-91, H-21-041, N-19-061, N-19-062, N-19-064 |
Structures Maintenance |
COMPLETE |
|
604356 |
DISTRICT 2- WINDOW AND DOOR REPLACEMENT AND OTHER MISCELLANEOUS WORK AT ADMINISTRATION BUILDING |
Miscellaneous/No Prequal |
COMPLETE |
|
604451 |
NORTHAMPTON- SIGNAL & INTERSECTION IMPROVEMENTS ON EARLE STREET |
Traffic Signals |
COMPLETE |
|
604597 |
NORTHAMPTON- IMPROVEMENTS ON I-91 INTERCHANGE 19 AT ROUTE 9 AND DAMON ROAD |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604662 |
NORTHAMPTON- ADDITIONS AND RENOVATIONS TO ADMINISTRATION BUILDING |
Vertical Construction (Ch 149) |
COMPLETE |
|
605065 |
AMHERST- HADLEY- NORTHAMPTON- NORWOTTUCK RAIL TRAIL IMPROVEMENTS, FROM DAMON ROAD TO STATIONS ROAD (8.5 MILES) |
Bikeway/Bike Path Construction |
COMPLETE |
|
605066 |
NORTHAMPTON- INTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET |
Traffic Signals |
COMPLETE |
|
605144 |
AMHERST- NORTHAMPTON- SOUTHAMPTON- SIDEWALK & WHEELCHAIR RAMP CONSTRUCTION ON ROUTES 5, 9, & 10 |
Landscaping |
COMPLETE |
|
605541 |
EASTHAMPTON- GREENFIELD- NORTHAMPTON- SOUTHAMPTON- WESTFIELD- RESURFACING & RELATED WORK ON ROUTES 5 &10 |
Resurfacing |
COMPLETE |
|
605634 |
NORTHAMPTON- IMPROVEMENTS ON JACKSON STREET (SAFE ROUTES TO SCHOOL), INCLUDING NEW BIKEWAY RAMP
|
Bikeway/Bike Path Construction |
COMPLETE |
|
606375 |
NORTHAMPTON- PARK & RIDE CONSTRUCTION AT THE VA MEDICAL CENTER |
New Construction |
COMPLETE |
|
606513 |
NORTHAMPTON- TRANSIT SIGNAL PRIORITY SYSTEM INSTALLATION ON ROUTE 9 |
Traffic Signals |
COMPLETE |
|
606577 |
NORTHAMPTON- HATFIELD- WHATELY- DEERFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91, FROM MM 26.97 TO MM 38.1 (NB) AND MM 37.7 (SB) |
Resurfacing Interstate |
COMPLETE |
|
606582 |
EASTHAMPTON- NORTHAMPTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 FROM MM 21.2 TO MM 26.9 IN BOTH DIRECTIONS (6.1 MILES) |
Resurfacing |
COMPLETE |
|
606623 |
AMHERST- BELCHERTOWN- EASTHAMPTON- ERVING- HADLEY- MONTAGUE- NORTHAMPTON- NORTHFIELD- WILLIAMSBURG- BAYSTATE GREENWAY SIGNING |
Sign Installation/Upgrading |
COMPLETE |
|
606665 |
NORTHAMPTON- RESURFACING AND RELATED WORK ON ROUTE 10, FROM MM 24.8 NORTHERLY TO MM 25.1 AT EARLE STREET |
Resurfacing |
COMPLETE |
|
606710 |
NORTHAMPTON- MAAB/ADA UPGRADES TO THE ADMINISTRATION BUILDING BATHROOMS & FRONT ENTRANCE |
Vertical Construction (Ch 149) |
COMPLETE |
|
607221 |
ATHOL- CHICOPEE- EASTHAMPTON- NORTHAMPTON- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS |
Resurfacing |
COMPLETE |
|
607343 |
NORTHAMPTON- DISTRICT ADMINISTRATION BUILDING SITE WORK |
Resurfacing |
COMPLETE |
|
607502 |
NORTHAMPTON- INTERSECTION IMPROVEMENTS AT KING STREET, NORTH STREET & SUMMER STREET AND AT KING STREET & FINN STREET |
Traffic Signals |
COMPLETE |
|
608109 |
NORTHAMPTON- SOLID WASTE REMOVAL FROM MASSDOT LOCUST STREET DEPOT |
Process/Recycle/Trnsprt Soils |
COMPLETE |
|
608236 |
NORTHAMPTON- RECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 TO ROUTE 5, INCLUDES DRAINAGE SYSTEM REPAIRS & SLOPE STABILIZATION AT THE NORWOTTUCK RAIL TRAIL |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
608786 |
AMHERST- HADLEY- NORTHAMPTON- TRANSIT SIGNAL PRIORITY UPGRADES AT VARIOUS LOCATIONS |
Traffic Signals |
COMPLETE |
|
609515 |
NORTHAMPTON- BRIDGE STREET ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) |
Roadway - Reconstr - Sidewalks and Curbing |
COMPLETE |
|