City/Town Information
City:
District: 2
County: HAMPSHIRE
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
606552 NORTHAMPTON– BRIDGE REPLACEMENT, N-19-059, I-91 OVER US ROUTE 5 AND B&MRR, BRIDGE REPLACEMENT, N-19-060, I-91 OVER HOCKANUM ROAD AND IMPROVEMENTS TO I-91/INTERCHANGE 18 Bridge Replacement CONSTRUCTION
606555 NORTHAMPTON- ROUNDABOUT CONSTRUCTION AT INTERSECTION ROUTES 5/10 (NORTH KING STREET) & HATFIELD STREET Hwy Reconstr - No Added Capacity CONSTRUCTION
119005 NORTHAMPTON- ROADWAY RECONSTRUCTION INCLUDING 2 BRIDGE REHABILITATIONS AND SIGNALS ON A SECTION OF ROUTE 66 (PHASE 1) Hwy Reconstr - No Added Capacity DESIGN
119006 NORTHAMPTON- ROADWAY RECONSTRUCTION AND RELATED WORK ON A SECTION OF ROUTE 66 (PHASE 2) Hwy Reconstr - No Added Capacity DESIGN
119007 NORTHAMPTON- RECONSTRUCTION OF ROUTE 66, FROM WILSON ROAD TO LOUDVILLE ROAD (4 MILES) INCLUDES N-19-038 (PHASE III) Hwy Reconstr - No Added Capacity DESIGN
124913 HADLEY- NORTHAMPTON- BRIDGE REHABILITATION, BR# H-01-012=N-19-018 ROUTE 9 OVER THE CONNECTICUT RIVER (CALVIN COOLIDGE BRIDGE) Bridge Reconstruction/Rehab DESIGN
601200 NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-068 OLD SPRINGFIELD ROAD OVER THE MILL RIVER Bridge Replacement DESIGN
602043 NORTHAMPTON- CONSTRUCTION OF PARK AND RIDE FACILITY AT SHELDON FIELD OFF OLD FERRY ROAD AND BRIDGE STREET (ROUTE 9) New Construction DESIGN
602058 NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-033 CHESTERFIELD ROAD OVER ROBERTS MEADOW BROOK Bridge Replacement DESIGN
602069 HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 5/10 Resurfacing DESIGN
602538 NORTHAMPTON- BRIDGE REPLACEMENT, BR# N-19-023, BLISS STREET OVER THE MILL RIVER Bridge Replacement DESIGN
603032 HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-91 NB & SB Resurfacing DESIGN
603407 DISTRICT 2- RESURFACING AND RELATED WORK AT VARIOUS LOCATIONS Resurfacing DESIGN
606200 HADLEY - BRIDGE REHABILITATION (H-01-026) OF NORWOTTUCK RAIL TRAIL OVER CONNECTICUT RIVER (DCR CONTRACTS P-10-2731-D1A & P12-2769-D1A) Bridge Reconstruction/Rehab DESIGN
608413 NORTHAMPTON- ROCKY HILL GREENWAY MULTI-USE TRAIL, FROM THE MANHAN RAIL TRAIL TO ROCKY HILL ROAD (0.4 MILES) Bikeway/Bike Path Construction DESIGN 2025
608869 NORTHAMPTON- BRIDGE REPLACEMENT, N-19-068, OLD SPRINGFIELD ROAD OVER THE MILL RIVER Bridge Replacement DESIGN 2025
609210 HADLEY- NORTHAMPTON- SOUTH HADLEY- CONNECTICUT RIVER TRAIL CONSTRUCTION Bikeway/Bike Path Construction DESIGN
609286 NORTHAMPTON- DOWNTOWN COMPLETE STREETS CORRIDOR AND INTERSECTION IMPROVEMENTS ON MAIN STREET (ROUTE 9) Hwy Reconstr - No Added Capacity DESIGN 2025
610657 EASTHAMPTON- NORTHAMPTON- INSTALLATION OF A SHARED-USE PATH ALONG MOUNT TOM ROAD FROM THE MANHAN TRAIL TO ATWOOD DRIVE Bikeway/Bike Path Construction DESIGN 2026
612504 NORTHAMPTON- BRIDGE REPLACEMENT, N-19-045, MAIN STREET LEEDS OVER MILL RIVER & N-19-046, MAIN STREET LEEDS OVER NORTH & SOUTH CHANNELS OF THE MILL RIVER Bridge Replacement DESIGN
612511 EASTHAMPTON- NORTHAMPTON- DECK REPLACMENT, E-05-025, E-05-026, I-91 OVER MANHAN RAIL TRAIL & N-19-056, I-91 OVER ISLAND ROAD Bridge Preservation DESIGN
612582 WELDED RAIL INSTALLATION AND MAINTENANCE ON THE CONNECTICUT RIVER MAINLINE (CONTINUOUS) Rail and Transit DESIGN
613219 CHICOPEE- HOLYOKE- NORTHAMPTON- SPRINGFIELD- WEST SPRINGFIELD- BRIDGE PRESERVATION OF 26 BRIDGES ALONG I-91 Bridge Preservation DESIGN 2025
613316 EASTHAMPTON- NORTHAMPTON- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-91 Resurfacing Interstate DESIGN
613404 NORTHAMPTON- HVAC REPAIRS TO DISTRICT ADMINSTRATION BUILDING AT 811 NORTH KING STREET Vertical Construction (Ch 149) DESIGN
613658 HATFIELD- NORTHAMPTON- BICYCLE AND PEDESTRIAN IMPROVEMENTS ON ROUTE 5/10, INCLUDES BRIDGE REPLACEMENT, H-11-007, WEST STREET (ROUTE 5/10) OVER GUTTER BROOK Roadway - Reconstr - Sidewalks and Curbing DESIGN
124911 HADLEY- NORTHAMPTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM, BR# H-01-012=N-19-018 ROUTE 9 OVER CONNECTICUT RIVER Traffic Signals COMPLETE
180085 NORTHAMPTON- REPAIRS TO HEATING SYSTEM AT DISTRICT 2 MAINTENANCE FACILITY Vertical Construction (Ch 149) COMPLETE
600302 HADLEY- NORTHAMPTON- RECONSTRUCTION OF ROUTE 9 (RUSSELL STREET) Hwy Reconstr - Minor Widening COMPLETE
601180 NORTHAMPTON- CONSTRUCTION OF A BIKE PATH ALONG ABANDONED RR BED (EXTENSION OF NORWOTTUCK TRAIL) Bikeway/Bike Path Construction COMPLETE
602647 NORTHAMPTON- TRAFFIC SIGNALS, INTERSECTION OF NORTH MAPLE STREET AND BRIDGE ROAD. FA# STP-001S(286)X Traffic Signals COMPLETE
602885 NORTHAMPTON- NORWOTTUCK RAIL-TRAIL EXTENSION, FROM LOOK PARK TO LEEDS, INCLUDES N-19-073 (LOOK PARK) & N-19-044 (ARCH STREET) Bikeway/Bike Path Construction COMPLETE
602887 NORTHAMPTON- BIKE PATH CONSTRUCTION ON STATE STREET (DOWNTOWN LINK NORWOTTUCK RAIL TRAIL) INCLUDES N-19-005 & N-19-006 Bikeway/Bike Path Construction COMPLETE
603054 NORTHAMPTON- ROUNDABOUT CONSTRUCTION AT NORTH MAIN STREET, BRIDGE ROAD AND LOOK MEMORIAL PARK ENTRANCE Traffic Signals COMPLETE
603729 NORTHAMPTON- BRIDGE REPLACEMENT, N-19-029, RIVER ROAD OVER THE MILL RIVER Bridge Replacement COMPLETE
603903 LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91 CORRIDOR (DESIGN-BUILD) Intelligent Transportation Sys COMPLETE
604207 EASTHAMPTON- NORTHAMPTON- MANHAN BIKE TRAIL CONSTRUCTION, FROM EASTHAMPTON LINK TO EARLE STREET, INCLUDES E-5-027 = N-19-075 & N-19-001 Bikeway/Bike Path Construction COMPLETE
604219 NORTHAMPTON- MANHAN/NORWOTTUCK TRAIL CONSTRUCTION, INCLUDING EARLE STREET/GROVE STREET INTERSECTION TO NEW SOUTH STREET, INCLUDES BR# N-19-072 Bikeway/Bike Path Construction COMPLETE
604242 NORTHAMPTON- BRIDGE REPLACEMENT, N-19-035, KENNEDY ROAD OVER ROBERTS MEADOW BROOK Bridge Replacement COMPLETE
604281 HOLYOKE- NORTHAMPTON- BRIDGE DECK REPAIRS, I-91, H-21-041, N-19-061, N-19-062, N-19-064 Structures Maintenance COMPLETE
604356 DISTRICT 2- WINDOW AND DOOR REPLACEMENT AND OTHER MISCELLANEOUS WORK AT ADMINISTRATION BUILDING Miscellaneous/No Prequal COMPLETE
604451 NORTHAMPTON- SIGNAL & INTERSECTION IMPROVEMENTS ON EARLE STREET Traffic Signals COMPLETE
604597 NORTHAMPTON- IMPROVEMENTS ON I-91 INTERCHANGE 19 AT ROUTE 9 AND DAMON ROAD Hwy Reconstr - Restr and Rehab COMPLETE
604662 NORTHAMPTON- ADDITIONS AND RENOVATIONS TO ADMINISTRATION BUILDING Vertical Construction (Ch 149) COMPLETE
605065 AMHERST- HADLEY- NORTHAMPTON- NORWOTTUCK RAIL TRAIL IMPROVEMENTS, FROM DAMON ROAD TO STATIONS ROAD (8.5 MILES) Bikeway/Bike Path Construction COMPLETE
605066 NORTHAMPTON- INTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET Traffic Signals COMPLETE
605144 AMHERST- NORTHAMPTON- SOUTHAMPTON- SIDEWALK & WHEELCHAIR RAMP CONSTRUCTION ON ROUTES 5, 9, & 10 Landscaping COMPLETE
605541 EASTHAMPTON- GREENFIELD- NORTHAMPTON- SOUTHAMPTON- WESTFIELD- RESURFACING & RELATED WORK ON ROUTES 5 &10 Resurfacing COMPLETE
605634 NORTHAMPTON- IMPROVEMENTS ON JACKSON STREET (SAFE ROUTES TO SCHOOL), INCLUDING NEW BIKEWAY RAMP Bikeway/Bike Path Construction COMPLETE
606375 NORTHAMPTON- PARK & RIDE CONSTRUCTION AT THE VA MEDICAL CENTER New Construction COMPLETE
606513 NORTHAMPTON- TRANSIT SIGNAL PRIORITY SYSTEM INSTALLATION ON ROUTE 9 Traffic Signals COMPLETE
606577 NORTHAMPTON- HATFIELD- WHATELY- DEERFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91, FROM MM 26.97 TO MM 38.1 (NB) AND MM 37.7 (SB) Resurfacing Interstate COMPLETE
606582 EASTHAMPTON- NORTHAMPTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 FROM MM 21.2 TO MM 26.9 IN BOTH DIRECTIONS (6.1 MILES) Resurfacing COMPLETE
606623 AMHERST- BELCHERTOWN- EASTHAMPTON- ERVING- HADLEY- MONTAGUE- NORTHAMPTON- NORTHFIELD- WILLIAMSBURG- BAYSTATE GREENWAY SIGNING Sign Installation/Upgrading COMPLETE
606665 NORTHAMPTON- RESURFACING AND RELATED WORK ON ROUTE 10, FROM MM 24.8 NORTHERLY TO MM 25.1 AT EARLE STREET Resurfacing COMPLETE
606710 NORTHAMPTON- MAAB/ADA UPGRADES TO THE ADMINISTRATION BUILDING BATHROOMS & FRONT ENTRANCE Vertical Construction (Ch 149) COMPLETE
607221 ATHOL- CHICOPEE- EASTHAMPTON- NORTHAMPTON- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS Resurfacing COMPLETE
607343 NORTHAMPTON- DISTRICT ADMINISTRATION BUILDING SITE WORK Resurfacing COMPLETE
607502 NORTHAMPTON- INTERSECTION IMPROVEMENTS AT KING STREET, NORTH STREET & SUMMER STREET AND AT KING STREET & FINN STREET Traffic Signals COMPLETE
608109 NORTHAMPTON- SOLID WASTE REMOVAL FROM MASSDOT LOCUST STREET DEPOT Process/Recycle/Trnsprt Soils COMPLETE
608236 NORTHAMPTON- RECONSTRUCTION OF DAMON ROAD, FROM ROUTE 9 TO ROUTE 5, INCLUDES DRAINAGE SYSTEM REPAIRS & SLOPE STABILIZATION AT THE NORWOTTUCK RAIL TRAIL Hwy Reconstr - No Added Capacity COMPLETE
608786 AMHERST- HADLEY- NORTHAMPTON- TRANSIT SIGNAL PRIORITY UPGRADES AT VARIOUS LOCATIONS Traffic Signals COMPLETE
609515 NORTHAMPTON- BRIDGE STREET ELEMENTARY SCHOOL IMPROVEMENTS (SRTS) Roadway - Reconstr - Sidewalks and Curbing COMPLETE