Number Description Project Type Status TIP Year
607688 MONSON- PALMER- BRIDGE REPLACEMENT, M-27-022=P-01-033, PARK ST/BOSTON ROAD EAST (US 20) OVER THE QUABOAG RIVER Bridge Replacement CONSTRUCTION
608327 BRIMFIELD- PALMER- WARREN- WILBRAHAM- INTERSTATE MAINTENANCE & RELATED WORK ON I-90 (MM 59.0 - 68.0) Resurfacing Interstate CONSTRUCTION
602335 PALMER- WILBRAHAM- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 20 Resurfacing DESIGN
604136 MONSON- PALMER- BRIDGE REPLACEMENT, M-27-007=P-01-007, STATE AVENUE OVER THE QUABOAG RIVER Bridge Replacement DESIGN 2026
605980 PALMER- WESTON- SCHEDULED & EMERGENCY BRIDGE REPAIRS AT VARIOUS LOCATIONS Structures Maintenance DESIGN
605987 LUDLOW- PALMER- STURBRIDGE- RESURFACING & RELATED WORK AT INTERCHANGES 7, 8 & 9 ON I-90 Resurfacing DESIGN
609413 PALMER- BRIDGE REPLACEMENT, P-01-054, FLYNT STREET OVER I-90 Bridge Replacement DESIGN 2028
612160 MONSON- PALMER- BRIDGE REPLACEMENT, M-27-008=P-01-008, ROUTE 32 OVER QUABOAG RIVER Bridge Replacement DESIGN 2026
612305 PALMER- FABRICATION AND INSTALLATION OF MODULAR OFFICE AND STORAGE BUILDING AT ROUTE 20/PARK STREET Vertical Construction (Ch 149) DESIGN
612503 PALMER- BRIDGE REPLACEMENT, P-01-017, CHURCH STREET OVER WARE RIVER Bridge Replacement DESIGN
613304 PALMER- BRIDGE REPLACEMENT, P-01-015 (17A), MAIN STREET OVER WARE RIVER Bridge Replacement DESIGN 2029
613546 PALMER- DECK REPLACEMENT, P-01-050 (4MF) & P-01-051 (4MG), I-90 EXIT 63 RAMPS OVER I-90 AND SHEARER STREET Bridge Preservation DESIGN
613565 BRIMFIELD- PALMER- WARREN- WILBRAHAM- CLEANING AND PAINTING OF 11 BRIDGES IN I-90 CORRIDOR Bridge Preservation DESIGN
613567 PALMER- SUPERSTRUCTURE REPLACEMENT, P-01-052 (4MD & 4ME) AND P-01-055 (4M9 & 4MA), I-90 EB/WB OVER THORNDIKE STREET AND ROUTE 67 Bridge Reconstruction/Rehab DESIGN
613569 PALMER- DECK REPLACEMENT, P-01-053 (4MC), BRECKENRIDGE STREET OVER I-90 Bridge Preservation DESIGN
613573 PALMER- CULVERT REPLACEMENTS AT MULTIPLE LOCATIONS ALONG ROUTE 20 AND ROUTE 32 Culvert Replacement DESIGN 2029
111309 PALMER- BRIDGE REPLACEMENT, BR# P-01-024, ROUTE 20 (PARK STREET) OVER CSX & ROUTE 67 NORTHBOUND Bridge Replacement COMPLETE
602574 PALMER- RECONSTRUCTION OF MAIN STREET FROM SYKES STREET TO HIGH STREET INTERSECTION Hwy Reconstr - Minor Widening COMPLETE
602575 PALMER- RECONSTRUCTION & IMPROVEMENTS OF SPRINGFIELD STREET, FROM THE WILBRAHAM T.L. EASTERLY TO BRIDGE STREET Hwy Reconstr - Restr and Rehab COMPLETE
602714 PALMER- EMERGENCY CONSTRUCTION OF A RETAINING WALL, BR# P-01-027 MAIN STREET OVER CONRAIL Bridge Reconstruction/Rehab COMPLETE
602998 BELCHERTOWN- PALMER- BRIDGE REPLACEMENT, BR# B-05-002=P-01-001 RIVER STREET OVER THE SWIFT RIVER (CANAL BRIDGE) Bridge Replacement COMPLETE
603705 BRIMFIELD- PALMER- BRIDGE REPLACEMENT, B-24-012=P-01-011, KING'S BRIDGE OVER QUABOAG RIVER Bridge Replacement COMPLETE
604030 PALMER- BRIDGE REPLACEMENT, P-01-018, STATE STREET OVER THE WARE RIVER Bridge Replacement COMPLETE
604673 PALMER- CHEMICAL STORAGE SHED CONSTRUCTION Vertical Construction (Ch 149) COMPLETE
605529 PALMER- BRIDGE REPLACEMENT, P-01-024, PARK STREET (ROUTE 20) OVER CSX RR & BOSTON ROAD (ROUTE 67 NB) INCLUDING DEMOLITION Bridge Replacement COMPLETE
606470 CHICOPEE- PALMER- WEST SPRINGFIELD- WESTFIELD- RAMP RESURFACING & RELATED WORK @ INTERCHANGES 3, 4 AND 5 ON I-90 (MM 40.4, 45.7 AND 49.0) AND MAINLINE MM 61.4 - 65.6 Resurfacing COMPLETE
606597 PALMER- BRIDGE PRESERVATION. P-01-046, I-90 OVER QUABOAG RIVER, P-01-047, I-90 OVER NECRR & MCRR & P-01-049, I-90 OVER ROUTE 181 (SYKES STREET) Structures Maintenance COMPLETE
606663 MONSON- PALMER- RESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES) Resurfacing COMPLETE
606704 BRIMFIELD- PALMER- WARREN- RESURFACING & RELATED WORK & STORMWATER IMPROVEMENTS ON SECTIONS OF I-90 (BETWEEN MM 61.4 & MM 69.6) (8.2 MILES) Resurfacing COMPLETE
607596 BRIMFIELD- PALMER- WARREN- GUARDRAIL REPAIRS AND IMPROVEMENTS ALONG A SECTION OF INTERSTATE 90 Guard Rail & Fencing COMPLETE
608253 PALMER- RESURFACING AND RELATED WORK ON ROUTE 67, FROM 0.3 MILES EAST OF ROUTE 20 TO THE WARREN T.L. (5 MILES) Hwy Reconstr - Restr and Rehab COMPLETE
608870 PALMER- BRIDGE REHABILITATION, P-01-005, MAIN STREET OVER QUABOAG RIVER Bridge Reconstruction/Rehab COMPLETE
609217 PALMER- WILBRAHAM- GUARDRAIL UPGRADES AND RELATED WORK ON I-90 (MM 58.9- 63.3) Guard Rail & Fencing COMPLETE
609429 PALMER- WARE- RESURFACING OF ROUTE 32 Resurfacing COMPLETE
611935 PALMER- CONSTRUCTION OF A SALT STORAGE SHED AND RELATED WORK AT ROUTE 20 DEPOT Vertical Construction (Ch 149) COMPLETE