City/Town Information
City:
District: 4
County: SUFFOLK
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
612568 CHELSEA- EVERETT- MEDFORD- REVERE- LITTER CONTROL, MOWING & VEGETATION MANAGEMENT ON ROUTE 16 (MYSTIC VALLEY PARKWAY/REVERE BEACH PARKWAY) Mowing and Spraying CONSTRUCTION
77700 REVERE- BRIDGE REPLACEMENT, BR# R-05-004 ROUTE 1A (BEACH STREET) OVER THE MBTA AND B & M RAILROAD Bridge Replacement DESIGN
601088 REVERE- INSTALLATION OF CLOSED LOOP TRAFFIC SIGNAL SYSTEM ON ROUTE 107 (BROADWAY) (7 LOCATIONS) Traffic Signals DESIGN
601515 REVERE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 1A (NORTH SHORE ROAD) FROM GEN. EDWARDS BRIDGE TO BUTLER CIRCLE Resurfacing DESIGN
601936 LEXINGTON- MILTON- REVERE- INSTALLATION OF 8 - 10,000 GALLON ABOVE GROUND CaCl2 STORAGE TANKS AT 4 LOCATIONS Miscellaneous/No Prequal DESIGN
602066 REVERE- REHABILITATION OF TIDE GATES AT TOWN LINE BROOK CULVERT UNDER ROUTE 1 Miscellaneous/No Prequal DESIGN
602104 REVERE- ROADWAY RECONSTRUCTION AND RELATED WORK ON PROSPECT AVENUE, SPRING AVENUE & FENNO STREET Hwy Reconstr - No Added Capacity DESIGN
603368 REVERE- LANDSCAPING ALONG SQUIRE ROAD (ROUTE 60) AND BROADWAY (ROUTE 107) Landscaping DESIGN
605012 MALDEN- REVERE- SAUGUS- RECONSTRUCTION & WIDENING ON ROUTE 1, FROM ROUTE 60 TO ROUTE 99 Hwy Reconstr - Added Capacity DESIGN
608396 LYNN- REVERE- BRIDGE RECONSTRUCTION, L-18-015=R-05-008, ROUTE 1A OVER SAUGUS RIVER Bridge Reconstruction/Rehab DESIGN 2028
610543 REVERE- MALDEN- IMPROVEMENTS AT ROUTE 1 (NB) (PHASE 1) Hwy Reconstr - Minor Widening DESIGN 2029
611999 REVERE- SAUGUS- ROADWAY WIDENING ON ROUTE 1 NORTH (PHASE 2) Hwy Reconstr - Added Capacity DESIGN
612100 REVERE- IMPROVEMENTS AT BEACHMONT VETERANS ELEMENTARY (SRTS) Roadway - Reconstr - Sidewalks and Curbing DESIGN 2027
612184 REVERE- BRIDGE REPLACEMENT, R-05-015, REVERE BEACH PARKWAY OVER BROADWAY Bridge Replacement DESIGN 2026
612523 REVERE- STATE ROAD BEACHMONT CONNECTOR Bikeway/Bike Path Construction DESIGN 2027
613666 ARLINGTON- HAVERHILL- REVERE- BICYCLE AND PEDESTRIAN IMPROVEMENTS AT MULTIPLE LOCATIONS Sidewalk Construction and Repairs DESIGN
613776 MEDFORD- EVERETT- CHELSEA- REVERE- ROADSIDE MAINTENANCE ON ROUTE 16 Mowing and Spraying DESIGN
613882 DISTRICT 4- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (SOUTHERN PROJECT) Sidewalk Construction and Repairs DESIGN
118000 REVERE- BRIDGE REPLACEMENT, BR# R-05-011, REVERE STREET OVER THE MBTA - B&M RAILROADS Bridge Replacement COMPLETE
118160 REVERE- SAUGUS- BRIDGE REPLACEMENT, R-05-007, ROUTE 107 (PINES RIVER) R-05-009, ROUTE 107 (DIAMOND CR) & S-05-003, ROUTE 107 (E.B.PINES) Bridge Replacement COMPLETE
601935 REVERE- RECONSTRUCTION OF PARK AVENUE & CENTRAL AVENUE (APPROX. 7000 L.F.) Hwy Reconstr - No Added Capacity COMPLETE
602725 CHELSEA- REVERE- HIGHWAY LIGHTING REPLACEMENT PROJECT, ROUTE 1 (NORTHEAST EXPRESSWAY) Electrical COMPLETE
604214 CHELSEA- EAST BOSTON- REVERE- SAUGUS- TRAFFIC MANAGEMENT SERVICES FOR THE DEMOCRATIC NATIONAL CONVENTION RESPONSE, ROUTE 1 & 1A, SB Miscellaneous/No Prequal COMPLETE
605508 REVERE- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REPAIRS, R-05-016, REVERE BEACH PARKWAY OVER BLUE LINE AND STATE ROAD Bridge Reconstruction/Rehab COMPLETE
605515 LYNN- REVERE- ELECTRICAL/MECHANICAL REPLACEMENT AND STRUCTURAL REPAIRS ON L-18-015=R-05-08, ROUTE 1A OVER THE SAUGUS RIVER (GENERAL EDWARDS DRAWBRIDGE) Drawbridge Maintenance COMPLETE
605528 REVERE- BRIDGE REPLACEMENT, R-05-001, REVERE BEACH PARKWAY OVER MBTA (WINTHROP AVENUE) Bridge Replacement COMPLETE
607174 CHELSEA- REVERE- MALDEN- SAUGUS- RESURFACING & RELATED WORK ON ROUTE 1 Resurfacing COMPLETE
607999 REVERE- IMPROVEMENTS AT GARFIELD ELEMENTARY & MIDDLE SCHOOL (SRTS) Roadway - Reconstr - Sidewalks and Curbing COMPLETE
608458 BOSTON- REVERE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON ROUTE 1A Structural Signing COMPLETE