City/Town Information
City:
District: 4
County: ESSEX
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
612855 BEVERLY- SALEM- BRIDGE PRESERVATION, B-11-005=S-01-013 (307 & 308), KERNWOOD AVENUE OVER THE DANVERS RIVER Bridge Preservation CONSTRUCTION
602726 DISTRICT 4- SCHEDULED AND EMERGENCY REPAIRS TO DRAWBRIDGE IN NORTHEAST AREA (3 SEPARATE CONTRACTS) Drawbridge Maintenance DESIGN
603929 BEVERLY- GLOUCESTER- LYNN- SALEM- SAUGUS- SCHEDULED AND EMERGENCY DRAWBRIDGE REPAIRS (NORTHEAST AREA) Drawbridge Maintenance DESIGN
604027 DISTRICT 4- GRASS MOWING AND TRIMMING OF STATE HIGHWAYS (AREA 4D-3) Mowing and Spraying DESIGN
605276 BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER AND B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE) Bridge Reconstruction/Rehab DESIGN 2027
605332 SALEM- BRIDGE REPLACEMENT, S-01-001, (ST 114) NORTH STREET OVER NORTH RIVER Bridge Replacement DESIGN
608927 LYNN- SALEM- RECONSTRUCTION OF ROUTE 107 Hwy Reconstr - No Added Capacity DESIGN
609437 SALEM- PEABODY- BOSTON STREET IMPROVEMENTS Hwy Reconstr - No Added Capacity DESIGN 2027
612075 SALEM- BRIDGE REPLACEMENT, S-01-024, JEFFERSON AVENUE OVER PARALLEL STREET Bridge Replacement DESIGN 2026
612990 SALEM- RECONSTRUCTION OF BRIDGE STREET (ROUTE 107), FROM FLINT STREET TO 150 FEET WEST OF WASHINGTON STREET Roadway - Reconstr - Sidewalks and Curbing DESIGN
613258 SALEM- PEABODY- HARMONY GROVE MULTI-USE PATH CONSTRUCTION Bikeway/Bike Path Construction DESIGN
5402 SALEM- CONSTRUCTION OF BRIDGE STREET BYPASS, FROM WASHINGTON STREET TO THORNDIKE STREET (CT #5) New Construction COMPLETE
601017 SALEM- RECONSTRUCTION OF ROUTE 1A (BRIDGE STREET) FROM THE BEVERLY/SALEM BRIDGE TO WASHINGTON STREET (6000 FT.) Hwy Reconstr - No Added Capacity COMPLETE
601321 SALEM- ROADWAY RECONSTRUCTION AND RELATED WORK ON MARLBOROUGH ROAD FROM ROUTE 107 (HIGHLAND AVENUE) TO THE PEABODY C.L. Hwy Reconstr - No Added Capacity COMPLETE
601520 MARBLEHEAD- SALEM- SWAMPSCOTT- ROADWAY RECONSTRUCTION, VINNIN SQUARE (RTE 1A, LORING AVE, VINNIN ST, SALEM ST & SWAMPSCOTT MALL) Hwy Reconstr - Minor Widening COMPLETE
602186 SALEM- SIGNALIZATION & INTERSECTION IMPROVEMENTS, 7 LOCATIONS ON ROUTE 107 Traffic Signals COMPLETE
604647 DISTRICT 4- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AND OPERATIONS (NORTHEAST AREA - CONTRACT 1) Structures Maintenance COMPLETE
605121 BEVERLY- SALEM- HARBORFRONT WALKWAY & CAUSEWAY PARK CONSTRUCTION Landscaping COMPLETE
605146 SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE Hwy Reconstr - No Added Capacity COMPLETE
608054 BEVERLY- SALEM- HARBORFRONT WALKWAY & CAUSEWAY PARK CONSTRUCTION Hwy Reconstr - Restr and Rehab COMPLETE
608059 SALEM- STORMWATER IMPROVEMENTS ALONG ROUTE 107 (SALEM BYPASS ROAD) Drainage COMPLETE
608352 SALEM- CANAL STREET RAIL TRAIL CONSTRUCTION (PHASE 2) Bikeway/Bike Path Construction COMPLETE
608521 SALEM- BRIDGE MAINTENANCE, S-01-018 (32T), (ST 114) NORTH STREET OVER (ST 107) BRIDGE STREET & MBTA Bridge Preservation COMPLETE
608650 SALEM- ADAPTIVE SIGNAL CONTROLS ON ROUTE 107 (HIGHLAND AVENUE) Traffic Signals COMPLETE
608743 SALEM- IMPROVEMENTS AT BATES ELEMENTARY SCHOOL (SRTS) Roadway - Reconstr - Sidewalks and Curbing COMPLETE
608817 SALEM- LYNN- RESURFACING AND RELATED WORK ON ROUTE 107 Resurfacing DOT Owned Non-Interstate COMPLETE