City/Town Information
City:
District: 5
County: BRISTOL
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
609037 REHOBOTH- SOMERSET- SWANSEA- SYSTEMATIC BRIDGE PRESERVATION AT 10 BRIDGES ALONG THE I-195 CORRIDOR Bridge Preservation CONSTRUCTION
612578 FALL RIVER- SOMERSET- ELECTRICAL UPGRADES AND SAFETY IMPROVEMENTS, F-02-058=S-16-008, I-195 OVER THE TAUNTON RIVER (BRAGA BRIDGE) Lighting CONSTRUCTION
133301 FALL RIVER- SOMERSET- BRIDGE SITE PREPARATION AND RELATED WORK, BR# F-02-001=S-16-004 BRIGHTMAN ST. / TAUNTON RIVER (CONTRACT 1) Bridge Replacement DESIGN
603254 FALL RIVER- SOMERSET- SWANSEA- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195 Resurfacing DESIGN
610701 FALL RIVER- SOMERSET- BRIDGE REMOVAL, F-02-001=S-16-004, BRIGHTMAN STREET BRIDGE OVER TAUNTON RIVER Demolition DESIGN
610802 SOMERSET- STORMWATER IMPROVEMENTS ALONG ROUTE 6, ROUTE 138, AND ROUTE 103 FOR TAUNTON RIVER Drainage DESIGN 2026
611980 SOMERSET- INTERSECTION IMPROVEMENTS AT ROUTE 6 AND LEES RIVER AVE Safety Improvements DESIGN 2027
611990 SOMERSET- SWANSEA- PAVEMENT PRESERVATION & RELATED WORK ON I-195 Resurfacing Interstate DESIGN 2025
612882 FALL RIVER- SOMERSET- FENDER SYSTEM REPAIRS, F-02-058=S-16-008, I-195 OVER THE TAUNTON RIVER (BRAGA BRIDGE) Bridge Maintenance DESIGN
613198 SOMERSET- BRIDGE PRESERVATION OF S-16-009 (3Y9), S-16-010 (3PD), S-16-011 (3YA) AND S-16-012 (3U6 & 3U7) ALONG I-195 Bridge Preservation DESIGN 2024
79136 SOMERSET- SWANSEA- BRIDGE REPLACEMENT, S-16-003=S-35-003, ROUTE 103 (WILBUR AVENUE) OVER THE LEE RIVER Bridge Replacement COMPLETE
600790 FALL RIVER- SOMERSET- CONSTRUCTION OF APPROACH SPAN SUBSTRUCTURE, BR# F-02-094=S-16-014 BRIGHTMAN ST OVER TAUNTON RIVER (CONTRACT 2) Bridge Replacement COMPLETE
600791 FALL RIVER- SOMERSET- BRIDGE REPLACEMENT, BR# F-02-001=S-16-004 BRIGHTMAN STREET OVER TAUNTON RIVER (CONTRACT 3) Bridge Replacement COMPLETE
600792 FALL RIVER- SOMERSET- BRIDGE REPLACEMENT, ROADWAY & RELATED WORK, F-02-094=S-16-014, BRIGHTMAN STREET OVER THE TAUNTON RIVER Bridge Replacement COMPLETE
601447 FALL RIVER- SOMERSET- BRIDGE PAINTING, F-02-058=S-16-008, ROUTE I-195 OVER THE TAUNTON RIVER (BRAGA BRIDGE - PHASE I) Structures Maintenance COMPLETE
601948 FALL RIVER- SOMERSET- BRIDGE REHABILITATION, BR# F-02-058=S-16-008 ROUTE I-195 OVER TAUNTON RIVER (BRAGA BRIDGE) Structures Maintenance COMPLETE
602258 SOMERSET- RESURFACING & RELATED WORK ON ROUTE 138, FROM THE ROUTE 6/103 INTERSECTION TO THE DIGHTON T.L. Resurfacing COMPLETE
604302 SOMERSET- SWANSEA- INTERSTATE RESURFACING ON I-195 Resurfacing COMPLETE
605099 FALL RIVER- SOMERSET- BRIDGE PRESERVATION, F-02-058, I-195 OVER THE COMB SR 79 & TAUNTON RIVER (BRAGA BRIDGE) Structures Maintenance COMPLETE
606299 FALL RIVER- SOMERSET- SURVEILLANCE SYSTEM INSTALLATION ON BRAGA BRIDGE (I-195) Intelligent Transportation Sys COMPLETE
606580 SOMERSET- PARK & RIDE EXPANSION ON ROUTE 103 Miscellaneous/No Prequal COMPLETE
608132 MANSFIELD- SWANSEA- SOMERSET- NEW BEDFORD- STORMWATER IMPROVEMENTS ALONG I-495 AND I-195 Sewer and Water COMPLETE
608602 FALL RIVER- SOMERSET- STORMWATER IMPROVEMENTS ALONG I-195 AND ROUTE 79 Drainage COMPLETE
608713 DISTRICT 5- CLEANING AND PAINTING OF 3 BRIDGES: (S-16-010 (3PD), N-25-030 (3VT, 3VU) ALONG I-95 AND I-195 Painting - Structural COMPLETE
610801 SOMERSET- STORMWATER IMPROVEMENTS ALONG ROUTE I-195 FOR MOUNT HOPE BAY Drainage COMPLETE