City/Town Information
City:
District: 4
County: MIDDLESEX
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
606528 SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 NB AND SB FROM ROUTE 28 TO TEMPLE STREET Bridge Preservation CONSTRUCTION
608482 CAMBRIDGE- SOMERVILLE- RESURFACING AND RELATED WORK ON ROUTE 28 Resurfacing DOT Owned Non-Interstate CONSTRUCTION
610726 MEDFORD- READING- SOMERVILLE- STONEHAM- WINCHESTER- WOBURN- INTERSTATE PAVEMENT PRESERVATION ON I-93 Resurfacing Interstate CONSTRUCTION
11600 SOMERVILLE- 3 BRIDGE REPLACEMENTS, BR# S-17-012 CEDAR STREET ,BR# S-17-008 SCHOOL STREET, BR# S-17-006 WALNUT ST. OVER THE MBTA Bridge Replacement DESIGN
604215 MEDFORD- READING- SOMERVILLE- STONEHAM- WOBURN- TRAFFIC MANAGEMENT SERVICES FOR THE DEMOCRATIC CONVENTION RESPONSE, I-93 SB Miscellaneous/No Prequal DESIGN
604216 MEDFORD- SOMERVILLE- STONEHAM- WOBURN- TEMPORARY EXTENSION OF HIGH OCCUPANCY VEHICLE LANE FOR THE DEMOCRATIC NATIONAL CONVENTION, I-93 SB Miscellaneous/No Prequal DESIGN
606505 SOMERVILLE- MEDFORD- GREEN LINE EXTENSION INCLUDING WORK ON 5 BRIDGES: S-17-007 (MEDFORD ST), S-17-008 (SCHOOL ST), S-17-011 (LOWELL ST), S-17-013 (BROADWAY), AND MEDFORD M-12-012 (COLLEGE AVE) New Construction DESIGN
607981 SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION Hwy Reconstr - No Added Capacity DESIGN 2027
608562 SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) Traffic Signals DESIGN
611940 SOMERVILLE- BRIDGE REPLACEMENT, S-17-016 (3GF), WEBSTER AVENUE OVER MBTA & BMRR Bridge Replacement DESIGN 2025
612004 EVERETT- SOMERVILLE- MYSTIC RIVER BICYCLE AND PEDESTRIAN CROSSING New Bridge DESIGN
612496 SOMERVILLE- BRIDGE PRESERVATION, S-17-031, I-93 (NB & SB) FROM ROUTE 28 TO TEMPLE STREET (PHASE 2) Bridge Preservation DESIGN 2026
612634 SOMERVILLE- BRIDGE REPLACEMENT, S-17-024, ROUTE 28/MCGRATH HWY OVER SOMERVILLE AVE EXT & MBTA Bridge Replacement DESIGN 2029
613337 SOMERVILLE- HIGHWAY LIGHTING UPGRADES TO MCGRATH HIGHWAY Lighting DESIGN
613598 SOMERVILLE- BRIDGE PRESERVATION OF 8 BRIDGES OVER GREEN LINE EXTENSION OVER MEDFORD BRANCH Bridge Preservation DESIGN
613608 BOSTON- SOMERVILLE- ELECTRICAL CABINET REPLACEMENTS ALONG I-90 AND I-93 Contract Highway Maintenance DESIGN
40550 SOMERVILLE- BRIDGE REPLACEMENTS, BR# S-17-011, LOWELL STREET OVER THE MBTA & B&M R.R. & S-17-015 LOWELL OVER THE MBTA AND B&MRR Bridge Replacement COMPLETE
133109 SOMERVILLE- BRIDGE REPLACEMENT, BR# S-17-009 SYCAMORE STREET OVER THE MBTA RAILROAD Bridge Replacement COMPLETE
600811 CAMBRIDGE- SOMERVILLE- BELMONT- BIKEWAY CONSTRUCTION AT ALEWIFE STATION, INCLUDES PEDESTRIAN BRIDGE Bikeway/Bike Path Construction COMPLETE
601807 BOSTON- CAMBRIDGE- MEDFORD- SOMERVILLE- INSTALLATION OF TRAFFIC SURVEILLANCE AND CONTROL EQUIPMENT ON I-93 Miscellaneous/No Prequal COMPLETE
602109 SOMERVILLE- RECONSTRUCTION OF SOMERVILLE AVENUE FROM UNION SQUARE TO THE CAMBRIDGE LINE Hwy Reconstr - Restr and Rehab COMPLETE
602219 SOMERVILLE- BRIDGE REHABILITATION, S-17-005, CROSS STREET OVER THE B&M RAILROAD Bridge Reconstruction/Rehab COMPLETE
603288 SOMERVILLE- RECONSTRUCTION ON WASHINGTON STREET, FROM BOSTON C.L. TO MCGRATH HIGHWAY (ROUTE 28) Hwy Reconstr - No Added Capacity COMPLETE
603916 BOSTON- SOMERVILLE- MEDFORD- HIGHWAY LIGHTING REFURBISHMENT ON I-93 Electrical COMPLETE
603968 SOMERVILLE- SIGNAL & INTERSECTION IMPROVEMENTS AT MAGOUN SQUARE (BROADWAY, MEDFORD AND DEXTER STREETS) Hwy Reconstr - Restr and Rehab COMPLETE
604331 SOMERVILLE- MULTI-USE PATH CONSTRUCTION, FROM CEDAR STREET TO LOWELL STREET (PHASE I) Bikeway/Bike Path Construction COMPLETE
604645 SOMERVILLE- BRIDGE REPLACEMENT, S-17-025, ROUTE 28 (MCGRATH HIGHWAY) OVER GILMAN STREET (AKA - GILMAN STREET BRIDGE) Bridge Replacement COMPLETE
604938 SOMERVILLE- WILMINGTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-93, FROM SULLIVAN SQUARE (EXIT 28) TO ROUTE 129 (EXIT 38) Structural Signing COMPLETE
605050 MEDFORD- SOMERVILLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-93 Resurfacing COMPLETE
605219 SOMERVILLE- STREETSCAPE IMPROVEMENTS ON BROADWAY Hwy Reconstr - No Added Capacity COMPLETE
605519 SOMERVILLE- DECK & SUBSTRUCTURE REPAIRS, S-17-039, ROUTE 28 OVER WASHINGTON STREET (MCCARTHY OVERPASS) Bridge Reconstruction/Rehab COMPLETE
605520 ARLINGTON- SOMERVILLE- BRIDGE REHABILITATION, A-10-014=S-17-026 (4DI), MYSTIC VALLEY PARKWAY OVER ALEWIFE BROOK Bridge Reconstruction/Rehab COMPLETE
605672 ARLINGTON- CAMBRIDGE- SOMERVILLE- ALEWIFE GREENWAY CORRIDOR RESTORATION (AKA MINUTEMAN BIKE PATH CONNECTOR) Bikeway/Bike Path Construction COMPLETE
605680 SOMERVILLE- ASSEMBLY SQUARE ACCESS IMPROVEMENTS New Construction COMPLETE
606167 BOSTON- SOMERVILLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-93, INCLUDES WORK ON S-17-029, S-17-031 & B-16-281 Resurfacing COMPLETE
606653 BOSTON- SOMERVILLE- CONDUIT SUPPORT REPLACEMENT & FIRE PROTECTION STANDPIPE MODIFICATION ALONG I-93 VIADUCT (CRC 18) Structures Maintenance COMPLETE
607209 SOMERVILLE- CAMBRIDGE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. Hwy Reconstr - Restr and Rehab COMPLETE
607892 SOMERVILLE- IMPROVEMENTS AT HEALEY SCHOOL (SRTS) Traffic Signals COMPLETE
608763 BOSTON- SOMERVILLE- MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II) Lighting COMPLETE
610724 CHELMSFORD- MEDFORD- SOMERVILLE- STONEHAM- INTERSTATE PRESERVATION ON I-93 & I-495 Resurfacing Interstate COMPLETE