City/Town Information
City:
District: 2
County: HAMPSHIRE
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
601149 SOUTH HADLEY- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY ON ROUTE 33 (LYMAN ROAD) (P.V. CHANGE) Vertical Construction (Ch 149) DESIGN
608785 SOUTH HADLEY- RECONSTRUCTION OF MAIN STREET, FROM THE CHICOPEE CITY LINE TO CANAL STREET (0.67 MILES) Hwy Reconstr - No Added Capacity DESIGN 2026
609210 HADLEY- NORTHAMPTON- SOUTH HADLEY- CONNECTICUT RIVER TRAIL CONSTRUCTION Bikeway/Bike Path Construction DESIGN
612109 CHICOPEE- SOUTH HADLEY- RESURFACING AND RELATED WORK ON ROUTE 33 Resurfacing DOT Owned Non-Interstate DESIGN 2027
601584 SOUTH HADLEY- RECONSTRUCTION, ROUTE 116 (COLLEGE STREET, WOODBRIDGE STREET & AMHERST ROAD) (8,700 FEET) Hwy Reconstr - Minor Widening COMPLETE
603260 SOUTH HADLEY- BRIDGE REPLACEMENT, S-18-007, ROUTE 47 (HADLEY STREET) OVER BACHELOR BROOK Bridge Replacement COMPLETE
603335 SOUTH HADLEY- HIGHWAY LIGHTING UPGRADE AT ROUTE 202 ROTARY Electrical COMPLETE
604520 GRANBY- SOUTH HADLEY- RESURFACING AND RELATED WORK, ROUTE 202 (GRANBY ROAD AND WEST STATE STREET) Resurfacing COMPLETE
604933 SOUTH HADLEY- BRIDGE PRESERVATION, S-18-015, ROUTE 202 OVER BARDWELL STREET & S-18-016, ROUTE 202 OVER ROUTE 116 Structures Maintenance COMPLETE
605260 CHICOPEE- SOUTH HADLEY- RESURFACING, CONCRETE REPAIRS & RELATED WORK ON ROUTE 33 (MEMORIAL DRIVE) Resurfacing COMPLETE
605673 SOUTH HADLEY- RESURFACING & RELATED WORK ON HADLEY STREET (ROUTE 47) Resurfacing COMPLETE
606218 SOUTH HADLEY- RESURFACING & RELATED WORK ON MORGAN STREET (ROUTE 116 TO S. HADLEY T.L.) & ROUTE 202 (CT RIVER TO END DIVIDED HIGHWAY NEAR DOUGLAS AVENUE) Resurfacing COMPLETE
606471 SOUTH HADLEY- RESURFACING & RELATED WORK ON ROUTE 202, FROM DOUGLAS STREET TO ROUTE 33 Resurfacing COMPLETE
606664 AMHERST- GRANBY- SOUTH HADLEY- RESURFACING & RELATED WORK ON ROUTE 116, FROM PEARL STREET (MM 11.9) TO 170' NORTH OF THE AMHERST T.L (MM 14.3) Resurfacing COMPLETE
607474 GRANBY- SOUTH HADLEY- RESURFACING & RELATED WORK ON ROUTE 202, FROM LYMAN STREET SOUTH HADLEY TO PLEASANT STREET GRANBY (2 MILES) Resurfacing DOT Owned Non-Interstate COMPLETE
607735 SOUTH HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 202 (GRANBY ROAD) & ROUTE 33 (LYMAN STREET) Traffic Signals COMPLETE
607736 CHICOPEE- SOUTH HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT 13 INTERSECTIONS ALONG ROUTE 33 (MEMORIAL DRIVE), FROM FULLER ROAD TO ABBEY STREET Traffic Signals COMPLETE
608136 SOUTH HADLEY- STORMWATER IMPROVEMENTS ALONG ROUTE 116 Drainage COMPLETE
608473 SOUTH HADLEY- RESURFACING AND RELATED WORK ON ROUTE 116 Resurfacing DOT Owned Non-Interstate COMPLETE