City/Town Information
City:
District: 3
County: WORCESTER
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
604989 SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET Hwy Reconstr - Restr and Rehab CONSTRUCTION
606620 RAYNHAM TO BOLTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-495 Structural Signing CONSTRUCTION
608203 MILFORD- HOPKINTON- WESTBOROUGH- SOUTHBOROUGH- MARLBORO- HUDSON- BERLIN- PAVEMENT PRESERVATION AND RELATED WORK ON I-495 Resurfacing Interstate CONSTRUCTION
608312 HOPKINTON- UPTON- WESTBOROUGH- RESURFACING AND RELATED WORK ON I-90, FROM MM 101.3 TO MM 105.4 Resurfacing Interstate CONSTRUCTION
63615 MARLBOROUGH- SOUTHBOROUGH- ROADWAY INTERCHANGE CONSTRUCTION INCLUDING BR# M-06-021 & M-06-022 AT ROUTE I-495 & CRANE MEADOW ROAD New Construction DESIGN
400106 HOPKINTON- SOUTHBOROUGH- BRIDGE REPLACEMENT, BR# H-23-003=S-20-003 CEDAR STREET EXTENSION OVER THE SUDBURY RIVER Bridge Replacement DESIGN
605819 WESTBOROUGH- SOUTHBOROUGH- IMPROVEMENTS @ I-495 & ROUTE 9 (INTERCHANGE STUDY) Hwy Reconstr - Added Capacity DESIGN
607701 WESTBOROUGH- SOUTHBOROUGH- RECONSTRUCTION OF I-495 AT ROUTE 9 INTERCHANGE, INCLUDING BRIDGE REPLACEMENT (W-24-020 & W-24-021), BRAIDED RAMP CONSTRUCTION AND ROUTE 9 IMPROVEMENTS Hwy Reconstr - Restr and Rehab DESIGN
608335 SOUTHBOROUGH- WESTBOROUGH- BRIDGE REHABILITATION OF S-20-022, S-20-024 & W-24-032 & REPLACEMENT OF S-20-023 Bridge Reconstruction/Rehab DESIGN
609099 MILFORD- HOPKINTON- WESTBOROUGH- SOUTHBOROUGH- RESURFACING AND RELATED WORK ON I-495N Resurfacing Interstate DESIGN
612962 SOUTHBOROUGH- RECLAMATION OF ROUTE 85 (MARLBOROUGH ROAD) AND FRAMINGHAM ROAD, FROM THE MARLBOROUGH TL TO ROUTE 30 (BOSTON ROAD) Reclamation DESIGN
602930 BROOKLINE- FRAMINGHAM- NATICK- NEWTON- SOUTHBOROUGH- WELLESLEY- WESTBOROUGH- TRAFFIC SIGNS ON ROUTE 9 Sign Installation/Upgrading COMPLETE
603793 HOPKINTON- SOUTHBOROUGH- BRIDGE REPLACEMENT, H-23-004=S-20-008, ROUTE 85 (RIVER STREET) OVER THE SUDBURY RIVER Bridge Replacement COMPLETE
604640 HOPKINTON- MILFORD- SOUTHBOROUGH- WESTBOROUGH- INTERSTATE RESURFACING, ROUTE I-495 (SB ONLY) Resurfacing COMPLETE
604701 HOPKINTON- MILFORD- SOUTHBOROUGH- WESTBOROUGH- INTERSTATE RESURFACING ON I-495 (NB ONLY) Resurfacing COMPLETE
605337 SOUTHBOROUGH- BRIDGE PRESERVATON, S-20-018, I-495 (NB/SB) OVER HULTMAN AQUEDUCT & RAILROAD Structures Maintenance COMPLETE
605572 ANDOVER- BERLIN- CHELMSFORD- SOUTHBOROUGH- INSTALLATION OF PERMANENT GROUND MOUNTED CHANGEABLE MESSAGE SIGNS (CMS) ON I-495 Intelligent Transportation Sys COMPLETE
605907 BOSTON- WESTON- SOUTHBOROUGH- INSPECTION, REPAIR, & MAINTENANCE OF FIRE ALARM SYSTEMS Miscellaneous/No Prequal COMPLETE
606283 HOPKINTON TO ANDOVER- INSTALLATION OF CAMERAS, MESSAGE SIGNS & COMMUNICATION INFRASTRUCTURE ON I-495 (DESIGN-BUILD) Intelligent Transportation Sys COMPLETE
606722 SOUTHBOROUGH- ROOF REPLACEMENT AT THE BARRACKS ON I-90 (WB) Vertical Construction (Ch 149) COMPLETE
607172 WESTBOROUGH- SOUTHBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 9 Resurfacing COMPLETE
607488 SOUTHBOROUGH- RESURFACING & RELATED WORK ON ROUTE 9, FROM THE FRAMINGHAM T.L TO WHITE BAGLEY ROAD Resurfacing DOT Owned Non-Interstate COMPLETE
608314 SOUTHBOROUGH- ASHLAND- FRAMINGHAM- RESURFACING AND RELATED WORK ON I-90, FROM MM 109.5 TO MM 114.9 Resurfacing COMPLETE