Number Description Project Type Status TIP Year
600689 SOUTHBRIDGE- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON A SECTION OF ROUTE 131 (MAIN STREET) Hwy Reconstr - Major Widening DESIGN
601784 SOUTHBRIDGE- BRIDGE REPLACEMENT, BR# S-21-010 PLEASANT STREET OVER MCKINSTRY BROOK Bridge Replacement DESIGN
608778 SOUTHBRIDGE- INTERSECTION IMPROVEMENTS AT CENTRAL STREET, FOSTER STREET, HOOK STREET AND HAMILTON STREET Traffic Signals DESIGN 2025
608862 SOUTHBRIDGE- BRIDGE REPLACEMENT, S-21-009, MILL STREET OVER MCKINSTRY BROOK & S-21-003, MILL STREET OVER THE QUINEBAUG RIVER Bridge Replacement DESIGN 2025
612089 DUDLEY- SOUTHBRIDGE- RESURFACING AND RELATED WORK ON ROUTE 131 Resurfacing DOT Owned Non-Interstate DESIGN 2027
601223 SOUTHBRIDGE- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 131 (SOUTHBRIDGE ROAD) FROM ROUTE 20 TO SOUTHBRIDGE TL (2.841 MILES) Resurfacing COMPLETE
601964 SOUTHBRIDGE- RESURFACING & SIDEWALKS, ROUTE 198 (EASTFORD ST.) INCL. BR# S-21-025 AND S-21-027 ROUTE 198 OVER COHASEE BROOK Resurfacing COMPLETE
602961 SOUTHBRIDGE- RECONSTRUCTION OF ROUTE 169 (WOODSTOCK ROAD) FROM THE CONNECTICUT S.L. TO ROUTE 131 (E. MAIN STREET) Hwy Reconstr - Minor Widening COMPLETE
603992 SOUTHBRIDGE- BRIDGE RECONSTRUCTION, S-21-033, ALPINE DRIVE OVER LEBANON BROOK Bridge Reconstruction/Rehab COMPLETE
605338 SOUTHBRIDGE- BRIDGE DEMOLITION & ROAD RELOCATION, S-21-014, SR 169 (NORTH WOODSTOCK ROAD) OVER THE P&W RAILROAD (ABANDONED) Demolition COMPLETE
605972 SOUTHBRIDGE- BRIDGE RECONSTRUCTION, S-21-002, ROUTE 131 (MAIN STREET) OVER QUINEBAUG RIVER Bridge Reconstruction/Rehab COMPLETE
606662 CHARLTON- SOUTHBRIDGE- RESURFACING & RELATED WORK ON ROUTE 169, FROM ROUTE 20 TO 400 FEET SOUTH OF VINTON STREET Resurfacing COMPLETE
608892 SOUTHBRIDGE- QUINEBAUG RIVER BANK STABILIZATION Bikeway/Bike Path Construction COMPLETE