City/Town Information
City:
District: 2
County: HAMPDEN
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
115299 AGAWAM- SOUTHWICK- BUILDING DEMOLITION FOR PROPOSED ROUTE 57 (PHASE II) Vertical Construction (Ch 149) DESIGN
603236 SOUTHWICK- INSTALLATION OF TRAFFIC CONTROL SYSTEM, ROUTE 57 (FEEDING HILLS ROAD) AT FOSTER ROAD AND NORTH LANGYARD ROAD Safety Improvements DESIGN
604155 SOUTHWICK- RESURFACING & RELATED WORK ON ROUTE 10/202, COLLEGE HIGHWAY (NORTHERLY SECTION) FROM THE WESTFIELD T.L. TO TANNERY ROAD (1.33 MILES) Hwy Reconstr - Minor Widening DESIGN
613104 SOUTHWICK- CULVERT REPLACEMENT ON ROUTE 202 OVER PEARL BROOK Culvert Replacement DESIGN
601322 SOUTHWICK- BRIDGE REPLACEMENT, S-22-005, ROUTE 202/ROUTE 10 OVER JOHNSON BROOK Bridge Replacement COMPLETE
602844 SOUTHWICK- RAIL TRAIL CONSTRUCTION (OFF ROAD) FROM CONNECTICUT TO POINT GROVE ROAD (ALONG R.O.W. PENN CEN RR) INCLUDES S-22-003, S-22-008, S-22-017 & TUNNELS (PHASE I) Bikeway/Bike Path Construction COMPLETE
603477 SOUTHWICK- INTERSECTION IMPROVEMENTS AT FOUR LOCATIONS ON ROUTE 57 (FEEDING HILLS ROAD) Traffic Signals COMPLETE
604033 SOUTHWICK- RECONSTRUCTION CONGAMOND ROAD (ROUTE 168), FROM COLLEGE HIGHWAY & ENDS 250 FEET SHORT OF STATE LINE (1.2 MILES) Hwy Reconstr - No Added Capacity COMPLETE
604154 SOUTHWICK- RECONSTRUCTION OF ROUTE 10/202 (COLLEGE HIGHWAY - CENTER SECTION) FROM TANNERY ROAD TO 0.2 MILES SOUTH OF ROUTE 57 Hwy Reconstr - Minor Widening COMPLETE
604443 SOUTHWICK- RAIL TRAIL EXTENSION, FROM POINT GROVE ROAD TO WESTFIELD CITY LINE (PHASE II) Bikeway/Bike Path Construction COMPLETE
604444 SOUTHWICK- (PHASE I) RECONSTRUCTION WITH CULVERT REPLACEMENT, ROUTE 168 (CONGAMOND ROAD) Hwy Reconstr - Minor Widening COMPLETE