City/Town Information
City:
District: 3
County: WORCESTER
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
602101 STERLING- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-190 Resurfacing DESIGN
602160 PRINCETON- STERLING- BRIDGE REPLACEMENTS, BR# P-16-007 ROUTE 140 OVER STILLWATER RIVER & S-25-016 ROUTE 140 OVER WACHUSETT BROOK Bridge Replacement DESIGN
602422 LITTLETON- MILLBURY- OXFORD- STERLING- WESTFORD- WESTMINSTER- CONSTRUCTION OF 6 CHEMICAL STORAGE SHEDS AT DEPOTS Chemical Storage Sheds DESIGN
602893 STERLING- TRAFFIC SAFETY IMPROVEMENTS INCLUDING SIGNALS, REDEMPTION ROCK TRAIL (ROUTE 140) AT DANA HILL ROAD AND LEGG ROAD Traffic Signals DESIGN
607604 STERLING- WEST BOYLSTON- IMPROVEMENTS ON ROUTE 140 AT I-190 Hwy Reconstr - Restr and Rehab DESIGN
610659 STERLING- STORMWATER DRAINAGE IMPROVEMENTS AT WACHUSETT RESERVOIR ON ROUTE 110 (METROPOLITAN ROAD) Drainage DESIGN 2025
612612 STERLING- INTERSECTION IMPROVEMENTS AT ROUTE 140 AND ROUTE 62 Safety Improvements DESIGN 2028
603150 STERLING- BRIDGE REPLACEMENT, S-25-008, MUDDY POND ROAD OVER THE STILLWATER RIVER Bridge Replacement COMPLETE
604264 STERLING- BRIDGE REPLACEMENT, S-25-006, ROUTE 62 (PRINCETON ROAD) OVER THE STILLWATER RIVER Bridge Replacement COMPLETE
604699 STERLING- INTERSECTION IMPROVEMENTS AT ROUTE 12 AND CHOCKSETT ROAD Hwy Reconstr - No Added Capacity COMPLETE
606575 STERLING- INTERSTATE MAINTENANCE & RELATED WORK ON I-190 Resurfacing Interstate COMPLETE
607909 STERLING- BRIDGE JOINTS REPAIRS AND BEAM-END REPAIRS AT 5 BRIDGES ON I-190 Structures Maintenance COMPLETE
608188 GARDNER- LEOMINSTER- STERLING- INTERSECTION IMPROVEMENTS AT 3 LOCATIONS Traffic Signals COMPLETE
611934 STERLING- METAL BUILDING ALTERATIONS AT MAINTENANCE BUILDING AT CHOCKSETT STREET DEPOT Vertical Construction (Ch 149) COMPLETE