Number Description Project Type Status TIP Year
605592 STURBRIDGE- HOLLAND- INTERSTATE MAINTENANCE & RELATED WORK ON I-84 Resurfacing Interstate CONSTRUCTION
606701 STURBRIDGE- CULVERT REPLACEMENT @ ROUTE 20 & SNELL STREET Bridge Replacement CONSTRUCTION
609481 STURBRIDGE- INTERSTATE MAINTENANCE & RELATED WORK ON I-90 (STURBRIDGE T.L. TO I-84 INTERCHANGE) Resurfacing Interstate CONSTRUCTION
609482 STURBRIDGE- CHARLTON- OXFORD- AUBURN- INTERSTATE MAINTENANCE AND RELATED WORK ON I-90 Resurfacing Interstate CONSTRUCTION
610826 STURBRIDGE- BRIDGE REPLACEMENT, S-30-019, CHAMPEAUX ROAD OVER LONG POND Bridge Replacement CONSTRUCTION
605674 STURBRIDGE- GRAND TRUNK TRAIL CONSTRUCTION, FROM ED CALCUTT BRIDGE TO THE INTERSECTION OF RIVER ROAD & FARQUHAR ROAD Bikeway/Bike Path Construction DESIGN
605987 LUDLOW- PALMER- STURBRIDGE- RESURFACING & RELATED WORK AT INTERCHANGES 7, 8 & 9 ON I-90 Resurfacing DESIGN
605999 BRIMFIELD- STURBRIGE- WARREN- RESURFACING & RELATED WORK ON I-90 Resurfacing DESIGN
608331 AUBURN- STURBRIDGE- CLEANING & PAINTING 2 BRIDGES ON PODUNK ROAD AND BRYN MAWR AVENUE OVER I-90 Painting - Structural DESIGN
611933 STURBRIDGE- ROUNDABOUT CONSTRUCTION AT THE INTERSECTION OF ROUTE 20 AND ROUTE 131 Hwy Reconstr - Restr and Rehab DESIGN 2026
611967 STURBRIDGE- CHARLTON- INTERSECTION IMPROVEMENTS ON ROUTE 49 AT PUTNAM ROAD, WALKER POND ROAD & ROUTE 20 Safety Improvements DESIGN 2027
612893 STURBRIDGE- IMPROVEMENTS AT BURGESS ELEMENTARY SCHOOL (SRTS) Roadway - Reconstr - Sidewalks and Curbing DESIGN 2026
612991 STURBRIDGE- DRAINAGE IMPROVEMENTS AT ROUTE 20 (MAIN STREET) AND CHURCH STREET Drainage DESIGN
600598 STURBRIDGE- HIGHWAY LIGHTING IMPROVEMENTS ROUTE I-84/ROUTE 20 Electrical COMPLETE
601223 SOUTHBRIDGE- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 131 (SOUTHBRIDGE ROAD) FROM ROUTE 20 TO SOUTHBRIDGE TL (2.841 MILES) Resurfacing COMPLETE
603350 STURBRIDGE- BRIDGE REHABILITATION, S-30-004, HAYNES STREET OVER THE QUINEBAUG RIVER Bridge Reconstruction/Rehab COMPLETE
603435 HOLLAND- STURBRIDGE- TRAFFIC GUIDE SIGN UPGRADES ON ROUTE I-84 FROM CONNECTICUT S.L. TO MASS TURNPIKE Sign Installation/Upgrading COMPLETE
603534 STURBRIDGE- RESURFACING AND RELATED WORK ON ROUTE I-84 FROM CONNECTICUT S.L. TO ROUTE I-90 Resurfacing COMPLETE
604233 CHARLTON- STURBRIDGE- RESURFACING AND RELATED WORK, ROUTE 20, FROM THE JUNCTION OF ROUTE 169 TO THE JUNCTION OF ROUTE 49 Resurfacing COMPLETE
606157 DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 6- TOLL PLAZA SIGNING & PAVEMENT MARKING REPLACEMENT ON THE MASS PIKE (I-90) & MHS (US 1, SR 1A) Structural Signing COMPLETE
606347 STURBRIDGE- RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 Resurfacing DOT Owned Non-Interstate COMPLETE
606451 EAST BROOKFIELD- SPENCER- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 49 Resurfacing COMPLETE
607384 STURBRIDGE- CLEAN & PAINT BRIDGES ALONG I-84 CORRIDOR Structures Maintenance COMPLETE
607725 STURBRIDGE- HOPKINTON- CONSTRUCTION OF SALT STORAGE BUILDINGS Vertical Construction (Ch 149) COMPLETE
607819 OXFORD- STURBRIDGE- CLEANING & PAINTING STRUCTURAL STEEL ON S-30-029 & O-06-052 ON I-90 (EB & WB) Painting - Structural COMPLETE
608022 BRIMFIELD- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 20, BEGINNING EAST OF NEW HOLLAND ROAD (MM 87.8), ENDING WEST OF GALILEO DRIVE (MM 91.9) Hwy Reconstr - Restr and Rehab COMPLETE
608170 STURBRIDGE- SIGN AND PAVEMENT MARKING INSTALLATION AND UPGRADES, LIMITED ROADWAY IMPROVEMENTS AND RELATED WORK ON BROOKFIELD ROAD (ROUTE 148), FROM I-90 TO BROOKFIELD T.L. Sign Installation/Upgrading COMPLETE
608394 STURBRIDGE- STORMWATER IMPROVEMENTS ALONG ROUTE 20 AND INTERSTATE 84 Drainage COMPLETE
608771 STURBRIDGE- CLARK ROAD WATERLINE CONNECTION Sewer and Water COMPLETE