| 609107 |
PHILLIPSTON- TEMPLETON- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 2 |
Resurfacing |
CONSTRUCTION |
|
| 613606 |
DISTRICT 1- DISTRICT 2- DISTRICT 3- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS |
Targeted Modernization - Multiple Locations |
CONSTRUCTION |
|
| 600774 |
GARDNER- TEMPLETON- BRIDGE REPLACEMENT, BR# G-01-002=T-02-006 BRIDGE STREET/TURNER ROAD OVER THE OTTER RIVER |
Bridge Replacement |
DESIGN |
|
| 600974 |
TEMPLETON- BRIDGE REHABILITATION, BR# T-02-014 ROUTE 68 (GARDNER ROAD) OVER THE OTTER RIVER |
Bridge Rehabilitation |
DESIGN |
|
| 602679 |
TEMPLETON- CONSTRUCTION OF A SANITARY BUILDING AT THE TEMPLETON REST AREA ON ROUTE 2 WESTBOUND |
Vertical Construction (Ch 149) |
DESIGN |
|
| 608424 |
TEMPLETON- RECONSTRUCTION OF ROUTE 68, FROM KING PHILLIP TRAIL (ROUTE 202) NORTH TO THE PHILLIPSTON TOWN LINE (2.65 MILES) |
Roadway Minor Widening |
DESIGN |
2029 |
| 613801 |
TEMPLETON TO LANCASTER- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 2 |
Structural Signing |
DESIGN |
2028 |
| 8055 |
TEMPLETON- BRIDGE REPLACEMENT, BR# T-02-009 BRIDGE STREET OVER THE B & M RAILROAD |
Bridge Replacement |
COMPLETE |
|
| 600259 |
TEMPLETON- RECONSTRUCTION OF ROUTE 202, FROM PHILLIPSTON T.L. TO WINCHENDON T.L. |
Roadway Minor Widening |
COMPLETE |
|
| 600622 |
TEMPLETON- BRIDGE REPLACEMENT, BR# T-02-021 WINCHENDON ROAD (ROUTE 202) OVER THE B & M RAILROAD |
Bridge Replacement |
COMPLETE |
|
| 600661 |
TEMPLETON- BRIDGE REHABILITATION, BR# T-02-002 ROUTE 202 (ELM STREET) OVER THE OTTER RIVER |
Bridge Rehabilitation |
COMPLETE |
|
| 600721 |
TEMPLETON- RECONSTRUCTION OF ROUTE 101 (DUDLEY/PETERSHAM ROAD) 2.1 MILES |
Hwy Reconstr - Major Widening |
COMPLETE |
|
| 602837 |
DISTRICT 2- DISTRICT 3- GUARDRAIL REFURBISHMENT AND DELINEATION PROJECT ON ROUTE 2 FROM LITTLETON TO PHILLIPSTON |
Guard Rail & Fencing |
COMPLETE |
|
| 604366 |
TEMPLETON- BRIDGE REPLACEMENT, T-02-019, NORTH MAIN STREET OVER EAST TEMPLETON POND OUTLET |
Bridge Rehabilitation |
COMPLETE |
|
| 604509 |
TEMPLETON- PHILLIPSTON- RESURFACING AND RELATED WORK, ROUTE 2 |
Resurfacing |
COMPLETE |
|
| 604917 |
TEMPLETON- RECONSTRUCTION OF BALDWINVILLE ROAD, FROM ROUTE 202/68 TO PATRIOTS ROAD (APPROX. 3 MILES) |
Roadway Minor Widening |
COMPLETE |
|
| 605119 |
WENDELL- ATHOL- ORANGE- PHILLIPSTON- TEMPLETON- TRAFFIC SIGN REPLACEMENT & RELATED WORK ON ROUTE 2 |
Sign Installation/Upgrading |
COMPLETE |
|
| 607001 |
LONGMEADOW- SPRINGFIELD- TEMPLETON- WESTFIELD- STORMWATER RETROFITS ON I-91, ROUTE 5, ROUTE 2 & ROUTE 20 |
Contract Highway Maintenance |
COMPLETE |
|
| 607321 |
TEMPLETON- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 68, FROM THE GARDNER C.L. TO THE END OF STATE HIGHWAY |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
| 608784 |
TEMPLETON- ROUNDABOUT CONSTRUCTION AT THE INTERSECTION OF PATRIOTS ROAD, SOUTH MAIN STREET, NORTH MAIN STREET AND GARDNER ROAD |
Roadway Modernization |
COMPLETE |
|
| 609385 |
HOLYOKE- SOUTHAMPTON- TEMPLETON- WALES- WARE- WEST BROOKFIELD- WESTFIELD- WINCHENDON- ADA RETROFITS |
Sidewalk Construction |
COMPLETE |
|