City/Town Information
City:
District: 4
County: MIDDLESEX
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
608574 BURLINGTON TO TYNGSBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US 3 Structural Signing CONSTRUCTION
613213 BEDFORD- BILLERICA- CHELMSFORD- TYNGSBOROUGH- BRIDGE PRESERVATION OF 41 BRIDGES IN ROUTE 3 CORRIDOR Bridge Preservation CONSTRUCTION
107700 BURLINGTON- BILLERICA- BURLINGTON- CHELMSFORD- LOWELL- TYNGSBOROUGH- ROUTE 3 ADD-A-LANE (DESIGN-BUILD) New Construction DESIGN
610719 BURLINGTON TO TYNGSBOROUGH- PAVEMENT PRESERVATION ON ROUTE 3 Resurfacing DOT Owned Non-Interstate DESIGN 2025
613268 TYNGSBOROUGH- CULVERT REPLACEMENT ON WESTFORD ROAD Culvert Replacement DESIGN
600872 TYNGSBOROUGH- BRIDGE REHABILITATION, T-09-001, ROUTE 113 & 3A OVER THE MERRIMACK RIVER & T-09-002 OVER THE B&M RR Bridge Reconstruction/Rehab COMPLETE
602139 TYNGSBOROUGH- LOWELL- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 113 (PAWTUCKET BOULEVARD) Resurfacing COMPLETE
602272 TYNGSBOROUGH- TEMPORARY BRIDGE, T-09-001T, ROUTE 113 & 3A (KENDALL ROAD) OVER THE MERRIMACK RIVER New Bridge COMPLETE
603823 TYNGSBOROUGH- RELOCATION OF ROUTE 113 (PAWTUCKET BOULEVARD) Highway Relocation COMPLETE
606152 DISTRICT 4- CORRECTIVE ACTIONS/WORK FOR NON-CONFORMING ISSUES ON ROUTE 3 (NORTH) BURLINGTON TO TYNGSBOROUGH Miscellaneous/No Prequal COMPLETE
607472 BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3 Resurfacing COMPLETE