City/Town Information
City:
District: 5
County: NORFOLK
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
602261 WALPOLE- RECONSTRUCTION ON ROUTE 1A (MAIN STREET), FROM THE NORWOOD T.L. TO ROUTE 27, INCLUDES W-03-024 OVER THE NEPONSET RIVER Hwy Reconstr - Restr and Rehab CONSTRUCTION
612163 SHARON- WALPOLE- BRIDGE PRESERVATION ALONG THE I-95 CORRIDOR Bridge Preservation CONSTRUCTION
603204 FOXBOROUGH- PLAINVILLE- SHARON- WALPOLE- PATRIOTS STADIUM INFRASTRUCTURE PROJECT, ROUTE 1 (CONSTRUCTION CONTRACT #2) Hwy Reconstr - Minor Widening DESIGN
605797 WALPOLE- BRIDGE REMOVAL, W-03-003, COMMON STREET OVER ABANDONED RAILROAD Demolition DESIGN
612102 CANTON- NORWOOD- WALPOLE- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 Resurfacing Interstate DESIGN
613644 NORFOLK- WRENTHAM- WALPOLE- SHARED-USE PATH INSTALLATION (METACOMET GREENWAY) (DESIGN ONLY) Bikeway/Bike Path Construction DESIGN
600803 NORWOOD- SHARON- WALPOLE- RESURFACING AND RELATED WORK, INCLUDING BRIDGE PAINTING & REPAIR ON ROUTE I-95 Resurfacing COMPLETE
601564 SHARON- WALPOLE- CONSTRUCTION OF METAL STORAGE FACILITY, MAINTENANCE DEPOT AT ROUTE 27 & ROUTE 1 Vertical Construction (Ch 149) COMPLETE
602721 WALPOLE- TRAFFIC SIGNALS, ROUTE 1A (MAIN STREET) AND WINTER STREET Traffic Signals COMPLETE
603825 NORWOOD- SHARON- WALPOLE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 1 Resurfacing COMPLETE
605187 WALPOLE- SIDEWALK RECONSTRUCTION & RELATED WORK ON WASHINGTON STREET Hwy Reconstr - Restr and Rehab COMPLETE
605218 NORTH ATTLEBOROUGH- WRENTHAM- NORFOLK- WALPOLE- NORWOOD- RESURFACING & RELATED WORK ON ROUTE 1A Resurfacing COMPLETE
605590 CANTON- NORWOOD- SHARON- WALPOLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 Resurfacing COMPLETE
607265 SHARON- WALPOLE- DUMPING GROUND CLOSURE AT ROUTE 27 MAINTENANCE FACILITY Miscellaneous/No Prequal COMPLETE