City/Town Information
City:
District: 4
County: MIDDLESEX
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
29492 BEDFORD- BILLERICA- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) Hwy Reconstr - Added Capacity CONSTRUCTION
605178 BILLERICA- REHABILITATION ON BOSTON ROAD (ROUTE 3A) FROM BILLERICA TOWN CENTER TO FLOYD STREET Hwy Reconstr - Minor Widening CONSTRUCTION
608574 BURLINGTON TO TYNGSBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US 3 Structural Signing CONSTRUCTION
610704 BURLINGTON- BILLERICA- RESURFACING AND RELATED WORK ON ROUTE 3A Resurfacing CONSTRUCTION
107700 BURLINGTON- BILLERICA- BURLINGTON- CHELMSFORD- LOWELL- TYNGSBOROUGH- ROUTE 3 ADD-A-LANE (DESIGN-BUILD) New Construction DESIGN
608227 BILLERICA- YANKEE DOODLE BIKE PATH CONSTRUCTION (PHASE I) Bikeway/Bike Path Construction DESIGN 2024
609250 BILLERICA- INTERSECTION IMPROVEMENTS AT BOSTON ROAD (ROUTE 3A), LEXINGTON STREET AND GLAD VALLEY ROAD Hwy Reconstr - Minor Widening DESIGN 2025
610719 BURLINGTON TO TYNGSBOROUGH- PAVEMENT PRESERVATION ON ROUTE 3 Resurfacing DOT Owned Non-Interstate DESIGN 2027
613213 BEDFORD- BILLERICA- CHELMSFORD- TYNGSBOROUGH- BRIDGE PRESERVATION OF 41 BRIDGES IN ROUTE 3 CORRIDOR Bridge Preservation DESIGN 2024
2001 BILLERICA- BRIDGE REPLACEMENT, BR# B-12-013, ANDOVER ROAD OVER THE B & M RAILROAD Bridge Replacement COMPLETE
9549 BILLERICA- BRIDGE REPLACEMENT, BR# B-12-014 GEORGE BROWN STREET OVER THE B & M RAILROAD AND MBTA Bridge Replacement COMPLETE
29491 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE/MITRE EXTENSION FROM ROUTE 62 TO NORTH OF PLANK STREET (PHASE II) Hwy Reconstr - Restr and Rehab COMPLETE
601425 BILLERICA- RECONSTRUCTION OF COOK STREET & ALEXANDER ROAD (11,200 FEET TOTAL) Hwy Reconstr - Minor Widening COMPLETE
601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) Hwy Reconstr - Minor Widening COMPLETE
601444 BILLERICA- BRIDGE REPLACEMENT, BR# B-12-002 RIVER STREET OVER CONCORD RIVER Bridge Replacement COMPLETE
601488 BILLERICA- RECONSTRUCTION, CONCORD ROAD PHASE II, FROM ROUTE 3A TO MIDDLESEX TURNPIKE AND CHARNSTAFF LN FROM CONCORD RD TO RT 3A Hwy Reconstr - Minor Widening COMPLETE
602123 BILLERICA- SIGNAL UPGRADES ON ROUTE 3A @ 3 LOCATIONS: TREBLE COVE; BRIDGE STREET; WYMAN ROAD/WEBB BROOK ROAD Traffic Signals COMPLETE
603424 BILLERICA- BRIDGE REPLACEMENT, BR# B-12-001, ROUTE 4 (NASHUA ROAD) OVER CONCORD RIVER Bridge Replacement COMPLETE
606152 DISTRICT 4- CORRECTIVE ACTIONS/WORK FOR NON-CONFORMING ISSUES ON ROUTE 3 (NORTH) BURLINGTON TO TYNGSBOROUGH Miscellaneous/No Prequal COMPLETE
606353 BEDFORD- BILLERICA- CHELMSFORD- CABLE BARRIER INSTALLATION ON ROUTE 3 Guard Rail & Fencing COMPLETE
607472 BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3 Resurfacing COMPLETE
607821 BILLERICA- CONSTRUCTION OF MASSDOT MAINTENANCE FACILITY AT CONCORD RD AND ROUTE 3 (EXIT 27) Vertical Construction (Ch 149) COMPLETE
607992 ANDOVER- BEDFORD- BILLERICA- STORMWATER IMPROVEMENTS ALONG I-93, ROUTE 3 AND ROUTE 3A Drainage COMPLETE
608181 BILLERICA- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 3A (BOSTON ROAD) AND ALLEN ROAD Traffic Signals COMPLETE