110980 |
NEWTON- WESTON- BRIDGE REHABILITATION, N-12-010=W-29-005, COMMONWEALTH AVENUE (ROUTE 30) OVER THE CHARLES RIVER |
Bridge Replacement |
CONSTRUCTION |
|
608866 |
NEWTON- WESTON- STEEL SUPERSTRUCTURE CLEANING (FULL REMOVAL) AND PAINTING OF 3 BRIDGES: N-12-051, W-29-011 & W-29-028 |
Bridge Preservation |
CONSTRUCTION |
|
609066 |
NEWTON- WESTON- MULTI-USE TRAIL CONNECTION, FROM RECREATION ROAD TO UPPER CHARLES RIVER GREENWAY INCLUDING RECONSTRUCTION OF PED BRIDGE N-12-078=W-29-062 |
Bikeway/Bike Path Construction |
CONSTRUCTION |
|
612314 |
WESTON- SWITCHGEAR REPLACEMENT & POWER FEED TO THE WAREHOUSE AT DRISCOLL BUILDING COMPLEX |
Vertical Construction (Ch 149) |
CONSTRUCTION |
|
130375 |
WALTHAM- WESTON- BRIDGE REPLACEMENT, BR# W-04-008=W-29-069 SOUTH STREET/RIVER ROAD OVER STONY BROOK |
Bridge Replacement |
DESIGN |
|
601264 |
NEWTON- WALTHAM- WELLESLEY- WESTON- REBEADING & EMBOSSING OF EXISTING THERMOPLASTIC PAVEMENT MARKINGS ON ROUTE I-95 (N.B. & S.B) |
Pavement Marking |
DESIGN |
|
601628 |
WESTON- BRIDGE REPLACEMENT, W-29-001, MERRIAM STREET OVER B&M RAILROAD & MBTA |
Bridge Replacement |
DESIGN |
|
602083 |
DISTRICT 4- RAMP RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (128) FROM LYNNFIELD TO WELLESLEY |
Resurfacing |
DESIGN |
|
605980 |
PALMER- WESTON- SCHEDULED & EMERGENCY BRIDGE REPAIRS AT VARIOUS LOCATIONS |
Structures Maintenance |
DESIGN |
|
606783 |
NEWTON- WESTON- BRIDGE BUNDLE, REPLACEMENT AND REHABILITATION AT I-90/I-95 INTERCHANGE INCLUDING RAMP G (DB) |
Bridge Reconstruction/Rehab |
DESIGN |
|
608940 |
WESTON- INTERSECTION IMPROVEMENTS BOSTON POST ROAD (ROUTE 20) AT WELLESLEY STREET |
Safety Improvements |
DESIGN |
2026 |
608954 |
WESTON- RECONSTRUCTION ON ROUTE 30 |
Hwy Reconstr - Restr and Rehab |
DESIGN |
2027 |
609484 |
WESTON- INTERSTATE MAINTENANCE AND RELATED WORK ON I-90 |
Resurfacing Interstate |
DESIGN |
|
609485 |
NEWTON- BROOKLINE- BOSTON- RESURFACING AND RELATED WORK ON I-90 |
Resurfacing Interstate |
DESIGN |
|
612602 |
WESTON- SHARED USE PATH CONNECTION ON ROUTE 30 |
Bikeway/Bike Path Construction |
DESIGN |
|
613115 |
WESTON- DECK REPLACEMENT, W-29-015 (2K0), STATE ROUTE 30 (SOUTH AVE) OVER I-95/STATE ROUTE 128 |
Bridge Preservation |
DESIGN |
|
613878 |
WESTON- INTERSECTION IMPROVEMENTS AT ROUTE 20 AND HIGHLAND STREET |
Safety Improvements |
DESIGN |
|
602000 |
WESTON- INTERSECTION & SIGNAL IMPROVEMENTS AT ROUTE 30 (SOUTH AVE) & WELLESLEY STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
602534 |
WESTON- BRIDGE REPLACEMENT, W-29-030, RECREATION ROAD OVER ROUTE I-95 / ROUTE 128 |
Bridge Replacement |
COMPLETE |
|
604547 |
NEWTON- WELLESLEY- WESTON- INTERSTATE MAINTENANCE ON I-95 |
Resurfacing |
COMPLETE |
|
604937 |
LEXINGTON- NEWTON- WALTHAM- WELLESLEY- WESTON- TRAFFIC SIGN REPLACEMENT ON I-95, FROM WELLESLEY (ROUTE 9) TO LEXINGTON (ROUTES 4/225) APPROX. 13 MILES |
Structural Signing |
COMPLETE |
|
605170 |
NEWTON- WESTON- BRIDGE BETTERMENT, N-12-058=W-29-012, ROUTE 128 SERVICE ROAD OVER CHARLES RIVER |
Structures Maintenance |
COMPLETE |
|
605513 |
NEWTON- WESTON- BRIDGE REHABILITATION, N-12-080=W-29-064, RIVERSIDE PARK PEDESTRIAN BRIDGE OVER CHARLES RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
605907 |
BOSTON- WESTON- SOUTHBOROUGH- INSPECTION, REPAIR, & MAINTENANCE OF FIRE ALARM SYSTEMS |
Miscellaneous/No Prequal |
COMPLETE |
|
605913 |
BOSTON- NEWTON- WESTON- GUIDE SIGN REPLACEMENTS AT MULTIPLE LOCATIONS ALONG I-90 |
Sign Installation/Upgrading |
COMPLETE |
|
605982 |
WESTON- BOSTON- CRASH CUSHION REFURBISHMENT AT VARIOUS LOCATIONS |
Impact Attenuators |
COMPLETE |
|
606157 |
DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 6- TOLL PLAZA SIGNING & PAVEMENT MARKING REPLACEMENT ON THE MASS PIKE (I-90) & MHS (US 1, SR 1A) |
Structural Signing |
COMPLETE |
|
606192 |
BOSTON- NEWTON- WESTON- SUBSTRUCTURE REPAIRS TO 9 BRIDGES ON THE METROPOLITAN HIGHWAY SYSTEM (MHS) |
Structures Maintenance |
COMPLETE |
|
606399 |
WESTON- BRIDGE PAINTING & PRESERVATION ON 3 BRIDGES: W-29-53, RAMP J OVER I-90, W-29-54, PARK ROAD OVER I-90, W-29-049, RAMP D OVER NORUMBEGA ROAD |
Structures Maintenance |
COMPLETE |
|
606416 |
WESTON- MILLING & PAVING ON I-90 (MILE MARKER 121.1 TO 123.2 INCLUDING INT 14 & 15) |
Resurfacing |
COMPLETE |
|
606539 |
WESTON- ROOF REPLACEMENT AT THE DRISCOLL BUILDING (CREDIT UNION & INT 14) |
Structures Maintenance |
COMPLETE |
|
606720 |
NEWTON- WESTON- STORMWATER RETROFITS ON I-90 |
Contract Highway Maintenance |
COMPLETE |
|
607311 |
WESTON- STATE POLICE STATION REPLACEMENT ON I-90 |
Vertical Construction (Ch 149) |
COMPLETE |
|
607660 |
WESTON- BRIDGE PRESERVATION ALONG I-90 |
Structures Maintenance |
COMPLETE |
|
607915 |
NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N-12-056 ON I-95/ROUTE 128 |
Bridge Reconstruction/Rehab |
COMPLETE |
|
608317 |
FRAMINGHAM- NATICK- WAYLAND- WESTON- RESURFACING AND RELATED WORK ON I-90, FROM MM 114.9 TO MM 121.1 |
Resurfacing Interstate |
COMPLETE |
|
608337 |
WESTON- ROOF REPLACEMENT AT WESTON CENTRAL WAREHOUSE |
Vertical Construction (Ch 149) |
COMPLETE |
|
608386 |
WESTON– DRISCOLL BUILDING ROOF REPLACEMENT |
Vertical Construction (Ch 149) |
COMPLETE |
|
608823 |
WELLESLEY- NEWTON- WESTON- PAVEMENT RESURFACING AND RELATED WORK ON I-95 |
Resurfacing Interstate |
COMPLETE |
|