15860 |
WEYMOUTH- BRIDGE REPLACEMENT, BR# W-32-009, COLUMBIAN STREET OVER MBTA |
Bridge Replacement |
DESIGN |
|
601697 |
BRAINTREE- QUINCY- WEYMOUTH- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 3 |
Resurfacing |
DESIGN |
|
602728 |
DISTRICT 4- SCHEDULED AND EMERGENCY REPAIRS TO DRAWBRIDGES IN SOUTHEAST AREA (3 SEPARATE CONTRACTS) |
Drawbridge Maintenance |
DESIGN |
|
603352 |
DISTRICT 5- FABRICATION AND INSTALLATION OF GROUND MOUNTED TOURIST INFORMATION SIGNS ON VARIOUS STATE HIGHWAYS (4 SEP. CONTRS.) |
Sign Installation/Upgrading |
DESIGN |
|
608092 |
WEYMOUTH- NEW ROADWAY CONNECTION BETWEEN TROTTER ROAD AND EAST WEST PARKWAY |
New Construction |
DESIGN |
|
608231 |
WEYMOUTH- RECONSTRUCTION ON ROUTE 3A, INCLUDING PEDESTRIAN AND TRAFFIC SIGNAL IMPROVEMENTS |
Hwy Reconstr - Restr and Rehab |
DESIGN |
|
609439 |
WEYMOUTH- STEEL SUPERSTRUCTURE CLEANING (FULL REMOVAL) & PAINTING OF W-32-023 AND W-32-022 |
Painting - Structural |
DESIGN |
|
610714 |
BOURNE TO BRAINTREE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 3 |
Structural Signing |
DESIGN |
2025 |
612050 |
BRAINTREE- WEYMOUTH- RESURFACING AND RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2026 |
613605 |
DISTRICT 4- DISTRICT 6- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS |
Safety Improvements |
DESIGN |
|
114906 |
WEYMOUTH- IMPROVEMENTS AT ROUTE 53 (WASHINGTON STREET) & MIDDLE STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
601630 |
WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) |
Hwy Reconstr - Added Capacity |
COMPLETE |
|
601843 |
WEYMOUTH- ROADWAY RECONSTRUCTION INCLUDING SIGNALS AT THE INTERSECTION OF ROUTE 18 (MAIN STREET) AND WINTER STREET |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
602703 |
HINGHAM- WEYMOUTH- BRIDGE REHABILITATION, BR# H-15-002=W-32-002 ROUTE 3A (LINCOLN ST.) OVER THE WEYMOUTH BACK RIVER |
Bridge Reconstruction/Rehab |
COMPLETE |
|
603161 |
WEYMOUTH- SIGNALIZATION & IMPROVEMENTS ON ROUTE 18 (3 LOCATIONS) @ WEST STREET; @ PARK AVENUE; @ COLUMBIAN STREET |
Traffic Signals |
COMPLETE |
|
603738 |
WEYMOUTH- TRAFFIC SIGNAL IMPROVEMENTS ON ROUTE 18 AT POND STREET AND PLEASANT STREET |
Traffic Signals |
COMPLETE |
|
603833 |
BRAINTREE TO PLYMOUTH- TRAFFIC SIGNS IMPROVEMENT PROJECT ON ROUTE 3 |
Sign Installation/Upgrading |
COMPLETE |
|
603931 |
BOSTON- MILTON- QUINCY- WEYMOUTH- SCHEDULED AND EMERGENCY DRAWBRIDGE REPAIRS (SOUTHEAST AREA) |
Drawbridge Maintenance |
COMPLETE |
|
604382 |
QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON STREET) OVER THE FORE RIVER |
Bridge Replacement |
COMPLETE |
|
604510 |
ROCKLAND- WEYMOUTH- RECONSTRUCTION OF EAST & WEST PARKWAY (DESIGN-BUILD) |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
604649 |
DISTRICT 4- SCHEDULED & EMERGENCY DRAWBRIDGE REPAIRS AND OPERATIONS (SOUTHEAST AREA - CONTRACT 3) |
Structures Maintenance |
COMPLETE |
|
605602 |
WEYMOUTH- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing |
COMPLETE |
|
605721 |
WEYMOUTH- INTERSECTION IMPROVEMENTS @ MIDDLE STREET, LIBBEY INDUSTRIAL PARKWAY AND TARA DRIVE |
Traffic Signals |
COMPLETE |
|
606639 |
WEYMOUTH- BRAINTREE- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing |
COMPLETE |
|
606997 |
BRAINTREE- MILTON- BOSTON- WEYMOUTH- STORMWATER RETROFITS ON I-93, ROUTE 3 & ROUTE 18 |
Sewer and Water |
COMPLETE |
|
607658 |
BRAINTREE- WEYMOUTH- BRIDGE PRESERVATION TO 10 BRIDGES ALONG ROUTE 3 |
Structures Maintenance |
COMPLETE |
|
607755 |
WEYMOUTH- INTERSECTION & SIGNAL IMPROVEMENTS AT 2 LOCATIONS: SR 53 (WASHINGTON STREET) AT MUTTON LANE & PLEASANT STREET |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
608003 |
WEYMOUTH- IMPROVEMENTS AT PINGREE ELEMENTARY SCHOOL (SRTS) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
610651 |
WEYMOUTH- DRAINAGE IMPROVEMENTS AT BRIDGE STREET (3A) AND NECK STREET |
Drainage |
COMPLETE |
|