609064 |
WAREHAM TO BOURNE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON ROUTE 25 |
Structural Signing |
CONSTRUCTION |
|
610542 |
BOURNE- ROTARY IMPROVEMENTS |
Hwy Reconstr - Minor Widening |
CONSTRUCTION |
|
601422 |
BOURNE- PLYMOUTH- WAREHAM- RESURFACING AND RELATED WORK ON SECTIONS OF HEAD OF THE BAY ROAD AND RED BROOK ROAD |
Resurfacing |
DESIGN |
|
602052 |
BOURNE- FALMOUTH- GUIDE SIGN REPLACEMENT AND UPDATING ON ROUTE 28 |
Sign Installation/Upgrading |
DESIGN |
|
606082 |
BOURNE- MEDIAN INSTALLATION ON ROUTE 6 (SCENIC HIGHWAY) |
Hwy Reconstr - No Added Capacity |
DESIGN |
2025 |
608020 |
BOURNE- BRIDGE REPLACEMENT, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 OVER THE CAPE COD CANAL, SANDWICH ROAD (ROUTE 6A) AND MCR/MBTA RAILROAD, INCLUDES REPLACEMENT OF B-17-027 ROUTE 3 OVER US 6 (CAPE COD BRIDGES PROGRAM PHASE I) |
Bridge Replacement |
DESIGN |
|
609262 |
BOURNE- RAIL TRAIL CONSTRUCTION (PHASE 1) |
Bikeway/Bike Path Construction |
DESIGN |
2025 |
610673 |
BOURNE- BOURNE RAIL TRAIL (PHASE 2) |
Bikeway/Bike Path Construction |
DESIGN |
|
610714 |
BOURNE TO BRAINTREE- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 3 |
Structural Signing |
DESIGN |
2025 |
611998 |
BOURNE- FALMOUTH- SHINING SEA BIKEWAY EXTENSION/BOURNE RAIL TRAIL (PHASE 4) |
Bikeway/Bike Path Construction |
DESIGN |
|
612053 |
BOURNE- SANDWICH- RESURFACING AND RELATED WORK ON ROUTE 6 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2025 |
612063 |
BOURNE- RESURFACING AND RELATED WORK ON ROUTE 28 |
Resurfacing DOT Owned Non-Interstate |
DESIGN |
2028 |
613604 |
DISTRICT 5- VRU SYSTEMIC SAFETY PROJECT NEAR BUS STOPS |
Safety Improvements |
DESIGN |
|
613678 |
BOURNE- BRIDGE REPLACEMENT, B-17-004 (BOURNE BRIDGE) ROUTE 28 OVER THE CAPE COD CANAL, SANDWICH ROAD (ROUTE 6A) AND MCR/MBTA RR, B-17-019 (45L) ROUTE 28 OVER US 6 AND B-17-026 (457) ROUTE 28 ON/OFF RAMP OVER ROUTE 25 (CAPE COD BRIDGES PROGRAM PHASE II) |
Bridge Replacement |
DESIGN |
|
613864 |
BOURNE- RAIL TRAIL CONSTRUCTION (PHASE 3) |
Bikeway/Bike Path Construction |
DESIGN |
|
603432 |
BOURNE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 25 |
Resurfacing |
COMPLETE |
|
603670 |
BOURNE- WAREHAM- BRIDGE REPLACEMENT, B-17-017=W-06-012, US ROUTE 6 & STATE ROUTE 28 (CRANBERRY HIGHWAY) OVER COHASSET NARROWS |
Bridge Replacement |
COMPLETE |
|
603845 |
SANDWICH- YARMOUTH- RESURFACING AND RELATED WORK ON ROUTE 6A |
Resurfacing |
COMPLETE |
|
603847 |
BOURNE- SAGAMORE ROTARY GRADE SEPARATION PROJECT |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
603848 |
BOURNE- DEMOLITION OF CANAL SIDE HOTEL ON CHURCH LANE (AS PART OF THE SAGAMORE ROTARY PROJECT) |
Demolition |
COMPLETE |
|
603894 |
BOURNE- MEDIAN INSTALLATION & IMPROVEMENTS ON ROUTE 6 (SCENIC HIGHWAY) |
Hwy Reconstr - No Added Capacity |
COMPLETE |
|
604137 |
BOURNE- PLYMOUTH- WAREHAM- TRAFFIC SIGN REPLACEMENT AND SAFETY IMPROVEMENTS, ROUTE 25 |
Sign Installation/Upgrading |
COMPLETE |
|
604142 |
BOURNE- SAGAMORE FIRE STATION REPLACEMENT |
Vertical Construction (Ch 149) |
COMPLETE |
|
604148 |
BOURNE- MAINTENANCE DEPOT CONSTRUCTION (PART OF THE SAGAMORE ROTARY PROJECT) |
Vertical Construction (Ch 149) |
COMPLETE |
|
604223 |
BOURNE- PLYMOUTH- RESURFACING & RELATED WORK ON ROUTE 3 |
Resurfacing |
COMPLETE |
|
604224 |
BOURNE- COLD PLANING AND RESURFACING ON ROUTE 6 (SCENIC HIGHWAY) |
Resurfacing |
COMPLETE |
|
604275 |
BOURNE- SAGAMORE ROTARY LANDSCAPING CONTRACT |
Landscaping |
COMPLETE |
|
604456 |
BOURNE- VISITOR CENTER CONSTRUCTION (PART OF THE SAGAMORE ROTARY PROJECT) |
Vertical Construction (Ch 149) |
COMPLETE |
|
605943 |
BOURNE- SANDWICH- CAMERA & EQUIPMENT INSTALLATION AT THE SAGAMORE & BOURNE BRIDGES & ROUTE 6 |
Intelligent Transportation Sys |
COMPLETE |
|
606178 |
BOURNE- RESURFACING & RELATED WORK ON ROUTE 28 |
Resurfacing |
COMPLETE |
|
606286 |
BOURNE- SANDWICH- RESURFACING OF ROUTE 6 (MID-CAPE HIGHWAY), FROM SAGAMORE BRIDGE TO SANDWICH/BARNSTABLE T.L. INCLUDES 6 BRIDGES |
Resurfacing |
COMPLETE |
|
606900 |
BOURNE- TRAFFIC AND MULTI-MODAL IMPROVEMENTS @ BELMONT CIRCLE AT ROUTES 6/25/28 |
Hwy Reconstr - Restr and Rehab |
COMPLETE |
|
607263 |
BARNSTABLE- BOURNE- SANDWICH- INSTALLATION OF REAL TIME TRAFFIC MONITORING (RTTM) SYSTEM AND VARIABLE MESSAGE BOARDS ON ROUTES 6, 25 AND 28 (CAPE COD REGIONAL ITS) |
Intelligent Transportation Sys |
COMPLETE |
|
608222 |
BOURNE- WAREHAM- RESURFACING AND RELATED WORK ON ROUTE 25 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608469 |
BOURNE- PLYMOUTH- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 3 |
Resurfacing DOT Owned Non-Interstate |
COMPLETE |
|
608544 |
BOURNE- RESURFACING AND RELATED WORK ON ROUTE 6 & 28 BYPASS ROAD |
Resurfacing |
COMPLETE |
|
608571 |
BOURNE TO FALMOUTH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 28 |
Structural Signing |
COMPLETE |
|