City/Town Information
City:
District: 1
County: FRANKLIN
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
606463 BUCKLAND- RECONSTRUCTION & MINOR WIDENING ON CONWAY STREET, SUMMER STREET, SOUTH STREET & CONWAY ROAD Hwy Reconstr - Minor Widening CONSTRUCTION
607674 BUCKLAND- CHARLEMONT- BRIDGE REHABILITATION, B-28-009=C-05-013, ST 2 OVER DEERFIELD RIVER Bridge Reconstruction/Rehab CONSTRUCTION
612757 BUCKLAND- RECONSTRUCTION OF UPPER NORTH STREET Hwy Reconstr - Minor Widening CONSTRUCTION
81106 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-003 ROUTE 112 (CONNECTOR ROAD) OVER B & M RAILROAD AND ROUTE 2 Bridge Replacement DESIGN
601750 BUCKLAND- SHELBURNE- CLEANING AND PAINTING STEEL BRIDGE, BR# B-28-022=S-11-001 ROUTE 2A (BRIDGE STREET) OVER THE DEERFIELD RIVER Painting - Structural DESIGN
602425 DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS. Chemical Storage Sheds DESIGN
602954 BUCKLAND- SHELBURNE- SHELBURNE FALLS DOWNTOWN STREETSCAPE PROJECT Electrical DESIGN
605882 BUCKLAND- SHELBURNE- BRIDGE PRESERVATION, B-28-022=S-11-001, ROUTE 2A (BRIDGE STREET) OVER DEERFIELD RIVER Bridge Preservation DESIGN
607610 BUCKLAND- RECONSTRUCTION AND BICYCLE ACCOMMODATION ON ROUTE 112 Hwy Reconstr - Minor Widening DESIGN 2028
612588 BUCKLAND- DECK REPLACEMENT, B-28-001 (0KC), ST 112/ASHFIELD ROAD OVER CLESSON BROOK Bridge Preservation DESIGN
602232 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-006, ROUTE 112 (ASHFIELD ROAD) OVER CLESSON BROOK Bridge Replacement COMPLETE
602316 BUCKLAND- CHARLEMONT- RESURFACING & RELATED WORK ON ROUTE 2, FROM MM 27.41 (R.R. BRIDGE) TO MM 37.39 (BUCKLAND/SHELBURNE T.L.) EXCLUDING MM 29.5 TO MM 30.75 (VILLAGE CENTER) Resurfacing DOT Owned Non-Interstate COMPLETE
602441 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-011, UPPER STREET OVER THE CLESSON BROOK Bridge Reconstruction/Rehab COMPLETE
603173 BUCKLAND- BRIDGE REPLACEMENT, BR# B-28-012 HOG HOLLOW ROAD OVER CLESSON BROOK Bridge Replacement COMPLETE
603752 BUCKLAND- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ROUTE 2 Vertical Construction (Ch 149) COMPLETE
604268 BUCKLAND- RECONSTRUCTION OF STATE STREET, FROM CLEMENT STREET TO ROUTE 2 Hwy Reconstr - Restr and Rehab COMPLETE
605453 BUCKLAND- SHELBURNE- BRIDGE BETTERMENT, B-28-032=S-11-014, ROUTE 2 OVER ROUTE 112 & DEERFIELD RIVER Structures Maintenance COMPLETE
606441 BUCKLAND- BRIDGE REPLACEMENT, B-28-002, ROUTE 112 (ASHFIELD ROAD) OVER CLARKS BROOK Bridge Replacement COMPLETE
608311 BUCKLAND- BRIDGE MAINTENANCE, B-28-003, ROUTE 112 OVER ROUTE 2 AND PAN AM RAILROAD Bridge Maintenance COMPLETE