City/Town Information
City:
District: 4
County: MIDDLESEX
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
608574 BURLINGTON TO TYNGSBOROUGH- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US 3 Structural Signing CONSTRUCTION
610704 BURLINGTON- BILLERICA- RESURFACING AND RELATED WORK ON ROUTE 3A Resurfacing CONSTRUCTION
107700 BURLINGTON- BILLERICA- BURLINGTON- CHELMSFORD- LOWELL- TYNGSBOROUGH- ROUTE 3 ADD-A-LANE (DESIGN-BUILD) New Construction DESIGN
600839 BURLINGTON- TRAFFIC SIGNAL RECONSTRUCTION & RELATED WORK, ROUTE 3A (CAMBRIDGE STREET) AT BEDFORD STREET Traffic Signals DESIGN
602079 BEDFORD- BURLINGTON- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON SECTIONS OF MIDDLESEX TURNPIKE AND ROUTE 62 (BURLINGTON ROAD) Hwy Reconstr - Major Widening DESIGN
602083 DISTRICT 4- RAMP RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (128) FROM LYNNFIELD TO WELLESLEY Resurfacing DESIGN
608067 WOBURN- BURLINGTON- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) & BEDFORD ROAD AND SOUTH BEDFORD STREET Hwy Reconstr - Minor Widening DESIGN 2025
609516 BURLINGTON- IMPROVEMENTS AT I-95 (ROUTE 128)/ROUTE 3 INTERCHANGE Hwy Reconstr - Minor Widening DESIGN 2025
610719 BURLINGTON TO TYNGSBOROUGH- PAVEMENT PRESERVATION ON ROUTE 3 Resurfacing DOT Owned Non-Interstate DESIGN 2025
612306 BURLINGTON- INSTALLATION OF MODULAR OFFICE AT MAINTENANCE DEPOT ON GRANT AVE Vertical Construction (Ch 149) DESIGN
613196 BURLINGTON- LYNNFIELD- WAKEFIELD- WOBURN- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-95 Bridge Preservation DESIGN
613275 BEVERLY- BURLINGTON- DANVERS- GLOUCESTER- WOBURN- BRIDGE PRESERVATION AT 9 BRIDGES CARRYING STATE ROUTE 128 Bridge Preservation DESIGN 2027
613318 BURLINGTON- WOBURN- INTERSTATE PAVEMENT PRESERVATION AND RELATED WORK ON I-95 Resurfacing Interstate DESIGN 2027
613641 BURLINGTON- INTERSECTION IMPROVEMENTS AT ROUTE 3A/CAMBRIDGE STREET AND WINN STREET Safety Improvements DESIGN
613781 BURLINGTON- HAVERHILL- SCHEDULED BRIDGE MAINTENANCE REPAIRS ON B-29-006 (2G2 & 2G3) AND H-12-038 (2X0 & 2WY) Bridge Maintenance DESIGN
613782 PEABODY- BURLINGTON- SCHEDULED SUBSTRUCTURE REPAIRS ON P-03-023 AND B-29-009 Bridge Maintenance DESIGN
29491 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE/MITRE EXTENSION FROM ROUTE 62 TO NORTH OF PLANK STREET (PHASE II) Hwy Reconstr - Restr and Rehab COMPLETE
602041 BURLINGTON- LEXINGTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-95 (ROUTE 128) Resurfacing COMPLETE
605018 BURLINGTON- LEXINGTON- READING- WOBURN- TRAFFIC SIGN & GUIDE REPLACEMENT ON I-95 (SR 128) Sign Installation/Upgrading COMPLETE
605589 BURLINGTON- WOBURN- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 Resurfacing COMPLETE
606152 DISTRICT 4- CORRECTIVE ACTIONS/WORK FOR NON-CONFORMING ISSUES ON ROUTE 3 (NORTH) BURLINGTON TO TYNGSBOROUGH Miscellaneous/No Prequal COMPLETE
606170 LEXINGTON- BURLINGTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 Resurfacing COMPLETE
606432 LEXINGTON- BURLINGTON- WOBURN- STONEHAM- READING- WAKEFIELD- LYNNFIELD- EXPANSION OF FIBER & CCTV ON I-95 Intelligent Transportation Sys COMPLETE
607472 BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3 Resurfacing COMPLETE
607638 BURLINGTON- REMEDIATION & RELATED WORK AT ROUTE 3 & ROUTE 128 OFF WHEELER ROAD Hazardous Waste Remediation COMPLETE
608068 BURLINGTON- ADAPTIVE TRAFFIC CONTROL SIGNAL SYSTEM INSTALLATION ON CAMBRIDGE STREET, MIDDLESEX TURNPIKE & BURLINGTON MALL ROAD Traffic Signals COMPLETE