City/Town Information
City:
District: 6
County: MIDDLESEX
City or Town: CITY
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
608482 CAMBRIDGE- SOMERVILLE- RESURFACING AND RELATED WORK ON ROUTE 28 Resurfacing DOT Owned Non-Interstate CONSTRUCTION
608762 BOSTON- CAMBRIDGE- BRIDGE PRESERVATION OF B-16-246=C-01-029, ELIOT STREET OVER THE CHARLES RIVER Bridge Preservation CONSTRUCTION
605507 BOSTON- CAMBRIDGE- SIDEWALK REPLACEMENT, B-16-007, ROUTE 2 OVER SOLDIERS FIELD ROAD & CHARLES RIVER (BU BRIDGE) Bridge Reconstruction/Rehab DESIGN
605527 BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-006=C-01-005, CAMBRIDGE ST/CHARLES RIV (RIVER ST BRIDGE) & B-16-377, CAMBRIDGE ST/SOLDIERS FIELD RD, B-16-010=C-01-006, WESTERN AVE/CHARLES RIV(WESTERN AVE BRIDGE) & B-16-375 WESTERN AVE/SOLDIERS FIELD RD Bridge Reconstruction/Rehab DESIGN
606449 CAMBRIDGE- BRIDGE REPLACEMENT, C-01-008, FIRST STREET AND C-01-040, LAND BOULEVARD OVER BROAD CANAL Bridge Replacement DESIGN 2026
609290 CAMBRIDGE- INTERSECTION IMPROVEMENTS AT FRESH POND PARKWAY/GERRYS LANDING ROAD, FROM BRATTLE STREET TO MEMORIAL DRIVE Hwy Reconstr - Restr and Rehab DESIGN
610776 CAMBRIDGE- SUPERSTRUCTURE REPLACEMENT, C-01-031, US ROUTE 3/ROUTE 16/ROUTE 2 OVER MBTA REDLINE Bridge Reconstruction/Rehab DESIGN 2025
611987 CAMBRIDGE- BRIDGE REPLACEMENT, C-01-026, MEMORIAL DRIVE OVER BROOKLINE STREET Bridge Replacement DESIGN 2027
613357 CAMBRIDGE- SEPARATED BICYCLE LANES ON CAMBRIDGE STREET Bikeway/Bike Path Construction DESIGN
613568 CAMBRIDGE- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK CONNECTOR New Bridge DESIGN
613656 CAMBRIDGE- BRIDGE PRESERVATION, C-01-038, C-01-039 AND C-01-045, MEMORIAL DRIVE OVER CHARLES RIVER Bridge Preservation DESIGN 2028
613689 CAMBRIDGE- NEIGHBORHOOD ELECTRIC VEHICLE CHARGING INFRASTRUCTURE (MA287) Roadway - Reconstr - Sidewalks and Curbing DESIGN
160065 CAMBRIDGE- BRIDGE REPLACEMENT, BR# C-01-013, WALDEN STREET OVER THE B & M RAILROAD AND MBTA Bridge Replacement COMPLETE
600300 CAMBRIDGE- ROADWAY RECONSTRUCTION ON A SECTION OF MASSACHUSETTS AVENUE AND LAFAYETTE SQUARE Hwy Reconstr - No Added Capacity COMPLETE
600811 CAMBRIDGE- SOMERVILLE- BELMONT- BIKEWAY CONSTRUCTION AT ALEWIFE STATION, INCLUDES PEDESTRIAN BRIDGE Bikeway/Bike Path Construction COMPLETE
601807 BOSTON- CAMBRIDGE- MEDFORD- SOMERVILLE- INSTALLATION OF TRAFFIC SURVEILLANCE AND CONTROL EQUIPMENT ON I-93 Miscellaneous/No Prequal COMPLETE
602594 CAMBRIDGE- CAMBRIDGEPORT ROADWAYS IMPROVEMENT PROJECT Hwy Reconstr - Added Capacity COMPLETE
604361 BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE) (AKA - LONGFELLOW BRIDGE) Bridge Reconstruction/Rehab COMPLETE
604421 BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE CHARLES RIVER (MEMORIAL & STORROW DRIVE) (AKA - LONGFELLOW BRIDGE) *EARLY ACTION - PHASE 1* Bridge Reconstruction/Rehab COMPLETE
604685 BOSTON- CAMBRIDGE- DAM BRIDGE REHABILITATION, B-16-013=C-01-019, CHARLES RIVER DAM ROAD (STATE ROUTE 28) OVER THE CHARLES RIVER (CRAIGIE BRIDGE) & DRAWBRIDGE REHABILITATION Bridge Reconstruction/Rehab COMPLETE
604896 ARLINGTON- BELMONT- CAMBRIDGE- LEXINGTON- LINCOLN- SIGN REPLACEMENT & IMPROVEMENTS ON STATE ROUTE 2 Sign Installation/Upgrading COMPLETE
605188 CAMBRIDGE- COMMON IMPROVEMENTS AT WATERHOUSE STREET, MASS AVE & GARDEN STREET Hwy Reconstr - Restr and Rehab COMPLETE
605259 ARLINGTON- BELMONT- CAMBRIDGE- RESURFACING & RELATED WORK ON ROUTE 2 Resurfacing COMPLETE
605506 BOSTON- CAMBRIDGE- DECK REPLACEMENT, B-16-007=C-01-004, ROUTE 2 OVER SOLDIERS FIELD ROAD & CHARLES RIVER (BU BRIDGE) Bridge Reconstruction/Rehab COMPLETE
605517 BOSTON- CAMBRIDGE- BRIDGE REHABILITATION OF ANDERSON MEMORIAL BRIDGE, B-16-011=C-01-007, NORTH HARVARD STREET OVER CHARLES RIVER Bridge Reconstruction/Rehab COMPLETE
605518 CAMBRIDGE- BRIDGE REPLACEMENT, C-01-041, MAGAZINE BEACH PEDESTRIAN BRIDGE OVER ROUTE 3 (MEMORIAL DRIVE) Bridge Replacement COMPLETE
605637 ARLINGTON- CAMBRIDGE- IMPROVEMENTS AT ROUTE 2 & ROUTE 16 Hwy Reconstr - Minor Widening COMPLETE
605656 CAMBRIDGE- NEWTON- FIBER OPTIC CONNECTION AT THREE LOCATIONS (ITS) Intelligent Transportation Sys COMPLETE
605672 ARLINGTON- CAMBRIDGE- SOMERVILLE- ALEWIFE GREENWAY CORRIDOR RESTORATION (AKA MINUTEMAN BIKE PATH CONNECTOR) Bikeway/Bike Path Construction COMPLETE
605684 CAMBRIDGE- INTERSECTION & SIGNAL IMPROVEMENTS ON BROADWAY, FROM THIRD STREET TO AMES STREET (KENDALL SQUARE) Hwy Reconstr - Restr and Rehab COMPLETE
605726 BOSTON- CAMBRIDGE- NORTH BANK BRIDGE CONSTRUCTION, B-16-302=C-01-028, RIVERWALK OVER MBTA New Bridge COMPLETE
607209 SOMERVILLE- CAMBRIDGE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. Hwy Reconstr - Restr and Rehab COMPLETE
608379 LEXINGTON- BELMONT- ARLINGTON- CAMBRIDGE- PAVEMENT PRESERVATION ON ROUTE 2 Resurfacing DOT Owned Non-Interstate COMPLETE
608806 WATERTOWN- CAMBRIDGE- MULTI-USE PATH CONSTRUCTION (PHASE II) Bikeway/Bike Path Construction COMPLETE