City/Town Information
City:
District: 6
County: NORFOLK
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
606146 CANTON- NORWOOD- WESTWOOD- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEMENT OF 5 BRIDGES Hwy Reconstr - Added Capacity CONSTRUCTION
609053 CANTON- DEDHAM- NORWOOD- HIGHWAY LIGHTING IMPROVEMENTS AT I-93 & I-95/128 Lighting CONSTRUCTION
87790 CANTON- DEDHAM- NORWOOD- INTERCHANGE IMPROVEMENTS AT I-95/I-93/UNIVERSITY AVENUE/I-95 WIDENING INCLUDING 10 BRIDGES AND 9 MULTI-USE PATH/PEDESTRIAN BRIDGES Hwy Reconstr - Added Capacity DESIGN
130555 CANTON- BRIDGE REHABILITATION, BR# C-02-006 SPAULDING STREET OVER THE MBTA Bridge Reconstruction/Rehab DESIGN
601730 CANTON- ROADWAY RECONSTRUCTION INCLUDING SIGNALS, NEPONSET STREET FROM ROUTE I-95 TO THE CANTON VIADUCT Hwy Reconstr - Major Widening DESIGN
602475 CANTON- ROADWAY RECONSTRUCTION INCLUDING SIGNALS ON A SECTION OF ROUTE 138 (WASHINGTON STREET) Hwy Reconstr - Added Capacity DESIGN
609438 CANTON- BRIDGE REPLACEMENT, C-02-042, REVERE COURT OVER WEST BRANCH OF THE NEPONSET RIVER Bridge Reconstruction/Rehab DESIGN
612094 RANDOLPH- CANTON- DEDHAM- MILTON- WESTWOOD- PAVEMENT AND BRIDGE PRESERVATION ON I-95 AND I-93 Resurfacing Interstate DESIGN 2025
612102 CANTON- NORWOOD- WALPOLE- INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 Resurfacing Interstate DESIGN
612614 CANTON- ROADWAY RECONSTRUCTION AND RELATED WORK ON ROUTE 138 Roadway - Reconstr - Sidewalks and Curbing DESIGN
612615 CANTON- MILTON- ROADWAY RECONSTRUCTION ON ROUTE 138, FROM ROYALL STREET TO DOLLAR LANE Roadway - Reconstr - Sidewalks and Curbing DESIGN 2029
32209 CANTON- BRIDGE REPLACEMENT, BR# C-02-008 RELOCATED HIGH STREET OVER MBTA AND AMTRAK Bridge Replacement COMPLETE
87800 CANTON- DEDHAM- RANDOLPH- WESTWOOD- RECONSTRUCTION ON ROUTE 128 (I-93 ADD-A-LANE) FROM ROUTE 24 (RANDOLPH) TO EAST STREET ROTARY (WESTWOOD) (ROADWAY I) INCLUDES D-05-W31, M-25-030, R-01-010 Hwy Reconstr - No Added Capacity COMPLETE
602288 CANTON- DEDHAM- ROAD CONSTRUCTION INCLUDING 5 BRIDGES AT THE INTERSTATE 95 (ROUTE 128) AND 93 INTERCHANGE Bridge Replacement COMPLETE
602710 CANTON- CONSTRUCTION OF AN ON-RAMP FROM DEDHAM STREET TO ROUTE I-95 SOUTHBOUND New Construction COMPLETE
602745 CANTON- IMPROVEMENTS & SIGNALIZATION, ROUTE 138 (TURNPIKE STREET) AT WASHINGTON STREET AND ROUTE 138 AT RANDOLPH STREET Traffic Signals COMPLETE
605590 CANTON- NORWOOD- SHARON- WALPOLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-95 Resurfacing COMPLETE
605607 CANTON- RANDOLPH- RESURFACING & RELATED WORK ON ROUTE 24 Resurfacing COMPLETE
605807 CANTON- IMPROVEMENTS ON ROUTE 138 (TURNPIKE STREET) FROM RANDOLPH STREET TO WASHINGTON STREET Hwy Reconstr - Restr and Rehab COMPLETE
605874 CANTON- SAFE ROUTES TO SCHOOL (HANSEN SCHOOL) Hwy Reconstr - No Added Capacity COMPLETE
607916 FALL RIVER TO RANDOLPH- GUIDE & TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 24 Structural Signing COMPLETE
608599 CANTON- NORWOOD- STORMWATER IMPROVEMENTS ALONG ROUTE 1 & I-95 Drainage COMPLETE