Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
608164 SUDBURY- CONCORD- BIKE PATH CONSTRUCTION (BRUCE FREEMAN RAIL TRAIL) Bikeway/Bike Path Construction CONSTRUCTION
602091 CONCORD- IMPROVEMENTS & UPGRADES TO CONCORD ROTARY (ROUTE 2/2A/119) Hwy Reconstr - Major Widening DESIGN
608015 CONCORD- RECONSTRUCTION & WIDENING ON ROUTE 2, FROM SANDY POND ROAD TO BRIDGE OVER MBTA/B&M RAILROAD Hwy Reconstr - Major Widening DESIGN
608495 CONCORD- LEXINGTON- LINCOLN- RESURFACING AND RELATED WORK ON ROUTE 2A Resurfacing DOT Owned Non-Interstate DESIGN
608941 CONCORD- LINCOLN- ROUTE 2 CROSBY CORNER WETLAND MITIGATION Drainage DESIGN
610707 CONCORD- BRIDGE REHABILITATION, C-19-021 (2DT), ROUTE 2 OVER SUDBURY RIVER Bridge Reconstruction/Rehab DESIGN
611952 HARVARD- LITTLETON- ACTON- CONCORD- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF ROUTE 2 Structural Signing DESIGN 2026
612870 CONCORD- ASSABET RIVER MULTI-USE TRAIL AND BRIDGE CONSTRUCTION Bikeway/Bike Path Construction DESIGN
600638 CONCORD- BRIDGE REPLACEMENT, C-19-019, PINE STREET OVER THE ASSABET RIVER Bridge Replacement COMPLETE
601442 CONCORD- BRIDGE REHABILITATION, C-19-013, MONUMENT STREET OVER CONCORD RIVER (FLINT'S BRIDGE) Bridge Reconstruction/Rehab COMPLETE
602626 CONCORD- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2 INCLUDING MEDIAN BARRIER Hwy Reconstr - Minor Widening COMPLETE
602984 CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S CORNER & BEDFORD ROAD, INCLUDES C-19-024 Hwy Reconstr - Restr and Rehab COMPLETE
603079 CONCORD- LINCOLN- BRIDGE REPLACEMENT, BR# C-19-005 = L-12-003 ROUTE 117 OVER SUDBURY RIVER (LEE'S BRIDGE) Bridge Replacement COMPLETE
603906 CONCORD- BRIDGE REHABILITATION, BR# C-19-003, SUDBURY ROAD OVER SUDBURY RIVER (HEATH'S BRIDGE) Bridge Reconstruction/Rehab COMPLETE
604141 CONCORD- ARCHIVES FACILITY #62, 215 ELM STREET, ROUTE 2 Miscellaneous/No Prequal COMPLETE
604472 ACTON- CONCORD- BOXBOROUGH- LITTLETON- RESURFACING & RELATED WORK ON ROUTE 2 Resurfacing COMPLETE
604609 ACTON- CONCORD- LITTLETON- HARVARD- TRAFFIC SIGN REPLACEMENT & SAFETY IMPROVEMENTS ON ROUTE 2 Sign Installation/Upgrading COMPLETE
604630 CONCORD- RESURFACING & RELATED WORK ON ROUTE 2, FROM WALDEN TO SUDBURY AND FROM NINE ACRE CORNER ROAD TO ELM STREET ROUTE 2A Resurfacing COMPLETE
604646 CONCORD- RECONSTRUCTION OF MAIN STREET (ROUTE 62) FROM WATER STREET TO THE ACTON T.L. Hwy Reconstr - Restr and Rehab COMPLETE
605189 CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, FROM COMMONWEALTH AVENUE TO POWDER MILL ROAD, INCLUDES 2 RAILROAD BRIDGES, C-19-036 & C-19-038 AND 1 CULVERT, C-19-015 (PHASE II-C) Bikeway/Bike Path Construction COMPLETE
606223 ACTON- CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, INCLUDES REPLACING BRIDGE C-19-037, RAIL TRAIL OVER NASHOBA BROOK, NEW BRIDGE C-19-039, RAIL TRAIL OVER ROUTE 2 & NEW CULVERT C-19-040, ROUTE 2 OVER WILDLIFE CROSSING (PHASE II-B) Bikeway/Bike Path Construction COMPLETE
606995 CHELMSFORD- CONCORD- LOWELL- PEABODY- STORMWATER IMPROVEMENTS ALONG ROUTE 2, ROUTE 128, AND ROUTE 3 Drainage COMPLETE
607111 CONCORD- BRIDGE PRESERVATION, C-19-014, OLD STOW ROAD OVER MBTA & B&M RR Structures Maintenance COMPLETE
608478 CONCORD- RESURFACING AND RELATED WORK ON ROUTE 2 Resurfacing DOT Owned Non-Interstate COMPLETE