City/Town Information
City:
District: 1
County: BERKSHIRE
City or Town: TOWN
Projects
Filter projects by: Project Phase TIP Status
All Projects All Projects
Construction Current Fiscal Year
Design Future Years
Complete Not Programmed
Number Description Project Type Status TIP Year
601430 DISTRICT 1- CONSTRUCTION OF 4 CHEMICAL STORAGE SHEDS AT MAINTENANCE DEPOTS Vertical Construction (Ch 149) DESIGN
601499 DALTON- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 8 (HINSDALE ROAD) Resurfacing DESIGN
601803 DALTON- WINDSOR- MILLING AND RESURFACING ON A SECTION OF ROUTE 9 Resurfacing DESIGN
602425 DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS. Chemical Storage Sheds DESIGN
602426 DALTON- PITTSFIELD- TRAFFIC SIGNALS UPDATE ON ROUTE 8&9 (DALTON AVE.) WITH RESURFACING FROM BENEDICT RD (PITT) TO SOUTH ST (DAL) Traffic Signals DESIGN
603714 DALTON- STOCKBRIDGE- BRIDGE RAIL PAINTING, BR# D-01-005 ROUTE 8/HOUSATONIC RIVER & S-26-005 GLENDALE MIDDLE ROAD/HOUSATONIC RR Painting - Structural DESIGN
608737 DALTON- RECONSTRUCTION OF DALTON DIVISION ROAD Hwy Reconstr - Minor Widening DESIGN 2029
608754 DALTON- INTERSECTION IMPROVEMENTS AT ROUTES 8 & 9 (MAIN ST) AT SOUTH ST & WEST HOUSATONIC ST Traffic Signals DESIGN
602162 DALTON- BRIDGE REPLACEMENTS, D-01-007 & D-01-009, ROUTE 8 (HINSDALE ROAD) OVER EAST BRANCH HOUSATONIC RIVER Bridge Replacement COMPLETE
602280 DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 Hwy Reconstr - Minor Widening COMPLETE
602281 DALTON- RECONSTRUCTION OF SOUTH STREET, FROM ROUTE 8 & 9 TO PITTSFIELD C.L. Hwy Reconstr - No Added Capacity COMPLETE
603653 DALTON- PRE-ENGINEERED STEEL STORAGE FACILITY AT MHD MAINTENANCE DEPOT ON ORCHARD STREET Vertical Construction (Ch 149) COMPLETE
603701 DALTON- BRIDGE REPLACEMENT, D-01-012, CLEVELAND ROAD OVER WAHCONAH FALLS BROOK Bridge Replacement COMPLETE
607511 DALTON- BRIDGE MAINTENANCE, D-01-005, ROUTE 8 (MAIN STREET) OVER EAST BRANCH HOUSATONIC RIVER Structures Maintenance COMPLETE