Project Description:
KINGSTON- PLYMOUTH- RECONSTRUCTION OF A SECTION OF ROUTE 3 AND RELOCATION OF ROUTE 44 INCLUDING 5 BRIDGES (SECTION II)
Section II is the continuation from the Route 44 Reloc/Section III northerly project limit, near the Route 3 Rest Area that was completed in May 1997 (Section III included the reconstruction of the Route 3, Exit 6 Interchange and reconstruction of Samoset Street). A new Trumpet (Three-Leg) Interchange is now constructed at the Route 3 Exit #7 Interchange to direct westerly traffic along a new double-barrel limited access, divided highway (2 lanes EB, and 2 lanes WB). It continues westerly to include the proposed new Connector Road Interchange at the Plymouth/Kingston town line (this exit replaced Exit #7 traffic to Cherry Street/Plymouth). This section also includes the construction of four (4) new bridges, a new tunnel, two (2) earth berm barriers; one (visual) @ Plymouth Housing Authority, and one (noise) @ Liberty Condominium; and a new 547-car Park & Ride Lot with 50% MBTA participation (T’s mitigation for Ts new RR Station to Kingston near Rte. 3 exit #8). This lot was originally intended to replace the existing Plymouth & Brockton Bus Facility impacted by this project.
Location:
  • Town of Kingston
  • Town of Plymouth
  • Design Responsibility: Consultant
    Right of Way Responsibility: Other
    Project Manager: Filbert Yee
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project has been advertised for construction bids. (as of 12/30/1995 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status Advertised 12/30/1995
    Project Management
    25% Design Design Public Hearing 11/29/1989