Project Description:
SOMERVILLE- 3 BRIDGE REPLACEMENTS, BR# S-17-012 CEDAR STREET ,BR# S-17-008 SCHOOL STREET, BR# S-17-006 WALNUT ST. OVER THE MBTA
The work to be done on Cedar Street includes the demolition of the existing bridge over the MBTA and construction of a new single span concrete bridge on concrete abutments. The project also involves roadway work on the Cedar Street and Franey Road approaches. The length of the project is approximately 775 feet. The work to be done on School Street includes the construction of a concrete beam bridge on the existing granite abutments. The limits of work are from Montrose Street to Richdale Street. The work to be done on Walnut Street includes the construction of a concrete beam bridge on the existing granite abutments. The limits of work are from Medford Street to Gilman Street.
Location:
  • City of Somerville
  • Design Responsibility: Municipality
    Right of Way Responsibility: Other
    Project Manager: Marie Joyce Rose
    Estimated Total Contract Cost: $4,719,645.67
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • S17006 
    • S17008 
    • S17012 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project