WAREHAM- RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO RED BROOK ROAD (1.65 MILES)
Work on this project includes the reconstruction of Route 6/28 to provide a cross
section consisting of 4 travel lanes (2 lanes in each direction separated by a median), bicycle accommodating shoulders, and sidewalks on both sides of the roadway. Traffic signals will be upgraded at Cranberry Drive Plaza/Home Depot Drive, Cinema Drive and Main Avenue. A new traffic signal system will be added at Red Brook Road. All traffic
signal equipment be new or replaced and will include pedestrian indications compliant with the Americans with Disabilities Act (ADA). Accommodations for U- turn are designed at each intersection. There is also an exclusive left turn lane with a U-turn bubble between Cinema Drive and Main Street. The existing drainage system will be replaced with a new drainage system. The stormwater will be treated using best management practices. The project also includes new signs and pavement markings.
|