Project Description:
NORTHAMPTON- RECONSTRUCTION OF ROUTE 66, FROM WILSON ROAD TO LOUDVILLE ROAD (4 MILES) INCLUDES N-19-038 (PHASE III)
The purpose of this project is to reconstruct Route 66 from Wilson Road to Loudville Road, including the reconstruction of the Route 66 Bridge (N-19-38) over Bassett Brook. The roadway work includes: removal of trees; excavation; borrow and grading; paving with bituminous concrete; furnishing and installing guardrail; traffic signs and signals; reconstructing an existing drainage system; pavement markings; and other incidental items of work.
Location:
  • City of Northampton
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Luciano Rabito
    Estimated Total Federal Participating Construction Cost: $10,043,241.00
    District: District 2
    Current Status: This project has been advertised for construction bids. (as of 09/23/2006 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 01/30/2001
    Project Status Advertised 09/23/2006
    Project Management
    100% Design 100% Package Received 04/06/2004
    100% Design 100% Package Comments to DE 10/06/2004
    Final Design PS&E Received 01/19/2006
    Final Design PS&E to FAPRO 09/07/2005