Project Description: |
HADLEY- NORTHAMPTON- BRIDGE REHABILITATION, BR# H-01-012=N-19-018 ROUTE 9 OVER THE CONNECTICUT RIVER (CALVIN COOLIDGE BRIDGE)
The work consists of bridge rehabilitation and widening of the Calvin Coolidge Memorial Bridge, roadway reconstruction, drainage, guardrail installation and other work. The work also includes improvements/modifications to I-91 NB Exit 19, and to the approaches of the bridge.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Gautam Sen |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project has been advertised for construction bids. (as of 09/30/2000 ) |
|
Bridges
|
|
|
|