MILLVILLE- 5 BRIDGE REPLACEMENTS ON CENTRAL STREET, BR# M-24-001, M-24-002, M-24-003, M-24-006 & M-24-007
The Millville Contract 2 includes the reconstruction of 5 replacement bridges and approximately 1800 feet of roadway along Central Street and Main Street in the Town of Millville. Two of the bridges span over branches of the Blackstone River. Two other bridges span old canals (or raceways) adjacent to the river. These four bridges are in deteriorated condition and will be entirely reconstructed as part of the project. The fifth bridge is a temporary panel bridge spanning over the P&W railroad. The temporary bridge was recently constructed as part of “Millville Contract 1”. The intent of Contract 1 was to provide increased vertical clearance over the railroad in advance of reconstructing the other 4 bridges along Central Street. The project includes the necessary roadway reconstruction along Central Street, Lincoln Street and Main Street to accomplish the bridge work. Central Street will be widened by about 10 feet to the West to provide for an additional sidewalk and adequate roadway width for staged construction. Main Street will be shifted to the North by about 10 feet at the intersection with Central Street to provide improved intersection geometry. Properties at the Northeast and Northwest corners of Main and Lincoln Streets will be acquired by spot taking to provide the necessary right-of-way at the Intersection.
Location:
  • Town of Millville
  • Resident Engineer: -- not assigned --
    Construction Contract Value: $6,416,712.60
    Construction Bid Price: $5,172,690.10
    Initial Construction Estimate: $5,110,540.38
    District: District 3
    Current Status: The project is substantially complete. The contractor is working on punch list items. (as of 12/17/2008)

    Contracts (3) Progress
    # 31155 -- Design -- Bridge Rehab/Recon/New Const
    Millville - Central St. Bridge Nos. M-24-001, -002, -003, -006, -007 Final Design Final
    # 34574 -- Construction Contract
    Five (5) Bridge Replacements along Central Street. Completed
    # 54828 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassHighway on an open basis for various statewide highway and bridge projects. Final

    Bridges

    Contract Dates
    Notice to Proceed: 05/26/2004
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    The project is substantially complete. The contractor is working on punch list items.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status Advertised 09/20/2003
    Project Management