Project Description: |
BOSTON- BRIDGE REPLACEMENT, BR# B-16-204, SILVER STREET OVER THE HAUL ROAD & CONRAIL
The roadway width will be 4.3 meters curb to curb and the bridge will include sidewalks on both sides that are 1.6 meters wide. The bridge will be closed during construction and traffic will be detoured.
|
Location: |
|
Resident Engineer: | Girard Allien |
Construction Contract Value: | $1,187,144.00 |
Construction Bid Price: | $1,068,222.40 |
Initial Construction Estimate: | $695,410.00 |
District: | District 4 |
Current Status: | All work on this project was completed as of June 23, 2006. (as of 12/28/2007) |
|