| Project Description: |
GLOUCESTER- BRIDGE REPLACEMENT, BR# G-05-009, THATCHER ROAD (ROUTE 127A) OVER GOOD HARBOR BEACH CREEK
A complete replacement of the existing bridge superstructure requires reconstruction of approximately 130 feet of roadway approach to the northerly side and approximately 165 feet of roadway approach to the southerly side of the bridge. One lane will be maintained for bi-directional travel with a temporary signal at both ends of the bridge.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Manhar Patel![]() |
| Estimated Total Contract Cost: | $1,712,389.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|