Project Description:
AMESBURY- SALISBURY- RECONSTRUCTION OF STATE ROUTE 110, FROM ROUTE I-495 TO MERRILL STREET
This project is required as part of the mitigation for the construction of the CarriageTown Marketplace on Route 110. The Route 110 corridor is proposed to be widened to provide two lanes in both directions from the I-495 northbound off-ramp to Merrill Street. A sidewalk is proposed for the entire length of the project.
Location:
  • Town of Amesbury
  • Town of Salisbury
  • Resident Engineer: Raymond Orsini
    Construction Contract Value: $6,430,566.65
    Construction Bid Price: $5,177,216.70
    Initial Construction Estimate: $6,667,641.35
    District: District 4

    Contracts (2) Progress
    # 58213 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 62017 -- Construction Contract
    Roadway Reconstruction and Related Work on a Section of Route 110 (Macy Street/Elm Street). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/19/2010
    Contract Information
    Project Designer: Municipality
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 03/19/1992
    Project Review Committee Letter 09/02/1992
    Project Status Advertised 09/19/2009
    Project Management
    100% Design 100% Package Received 07/03/2009
    100% Design 100% Package Comments to DE 08/11/2009
    25% Design 25% Package Received 04/17/2002
    25% Design 25% Package Comments to DE 03/05/2004
    25% Design Design Public Hearing 12/17/2008
    75% Design 75% Package Received 03/08/2007
    75% Design 75% Package Received 10/17/2008
    75% Design 75% Package Comments to DE 01/29/2008
    75% Design 75% Package Comments to DE 01/12/2009
    Final Design PS&E Received 08/21/2009
    Final Design PS&E to FAPRO 09/16/2009