AMESBURY- SALISBURY- RECONSTRUCTION OF STATE ROUTE 110, FROM ROUTE I-495 TO MERRILL STREET
This project is required as part of the mitigation for the construction of the CarriageTown Marketplace on Route 110. The Route 110 corridor is proposed to be widened to provide two lanes in both directions from the I-495 northbound off-ramp to Merrill Street. A sidewalk is proposed for the entire length of the project.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | David Shedd![]() |
| Estimated Total Contract Cost: | $6,430,566.65 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|