Project Description: |
BILLERICA- BRIDGE REPLACEMENT, BR# B-12-013, ANDOVER ROAD OVER THE B & M RAILROAD
The proposed project consists of replacing the existing bridge in its present location with improvements to the approach roadways. The project will also involve the reconstruction of approximately 200 feet of roadway at each approach to the bridge, the installation of granite curbing and steel beam guardrail, and other incidental items of work.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Marie Joyce Rose![]() |
Estimated Total Contract Cost: | $1,430,821.92 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|