| Project Description: | 
 LYNN- SAUGUS- BRIDGE REPLACEMENT (TEMP), L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (FOX HILL BRIDGE) 
The work includes the construction of a 2-lane temporary moveable bridge.  This temporary bridge will remain in use until such time that a permanent bridge can be built in the same location as the existing bridge. The horizontal clearance under the bridge will be 50 feet. 
 | 
| Location: | 
 | 
| Resident Engineer: | John Lepore![]()  | 
| Construction Contract Value: | $11,807,096.00 | 
| Construction Bid Price: | $10,399,815.00 | 
| Initial Construction Estimate: | $11,965,762.00 | 
| District: | District 4 | 
  | 