Project Description: |
LYNN- SAUGUS- BRIDGE REPLACEMENT (TEMP), L-18-016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (FOX HILL BRIDGE)
The work includes the construction of a 2-lane temporary moveable bridge. This temporary bridge will remain in use until such time that a permanent bridge can be built in the same location as the existing bridge. The horizontal clearance under the bridge will be 50 feet.
|
Location: |
|
Resident Engineer: | John Lepore |
Construction Contract Value: | $11,807,096.00 |
Construction Bid Price: | $10,399,815.00 |
Initial Construction Estimate: | $11,965,762.00 |
District: | District 4 |
|
Bridges
|
|
|
|
|