Project Description:
|
BEDFORD- CROSBY DRIVE MIDDLESEX TURNPIKE CONSTRUCTION (PHASE I)
The proposed roadway begins approximately 375 feet north of Route 62 to the Crosby Drive/Middlesex Turnpike intersection. There are no signalized intersections in this section. Improvements include widening from a two-lane to a five-lane roadway with two travel lanes in each direction. A shared two way left turn lane, sidewalk, grass strip, storm water systems, stone masonry retaining wall and landscaping will also be provided.
|