Project Description: |
BOSTON- DEDHAM- BRIDGE REPLACEMENT, BR# B-16-177=D-05-006 ROUTE 109 (BRIDGE STREET/SPRING STREET) OVER THE CHARLES RIVER
The proposed project consists of rehabilitating the existing Route 109 bridge, over the Charles River, in its present location with minor improvements to the approach roadways. The bridge will remain open to traffic during construction.
|
Location: |
|
Resident Engineer: | Edward Moschella Jr |
Construction Contract Value: | $5,000,038.32 |
Initial Construction Estimate: | $1,392,231.50 |
District: | District 4 |
Current Status: | This project has been completed. (as of 07/21/2005) |
|